1, resumption time:
In principle, projects under construction in the county are allowed to start and resume work in an orderly manner after 24: 00 on February 17, 2020. Projects involving major people's livelihood can be resumed before February 17, 2020 after approval.
2, the project to resume production standards
"three musts"
(1) The commitment must be fulfilled;
(2) Two schemes must be worked out: the epidemic prevention and control scheme and the work scheme of returning to work and production;
③ Seven things must be done: materials, investigation, education, accommodation, management, safety and personnel responsibility;
"five essentials"
★ The main body should strictly perform its duties.
★ Employment planning should be forward-looking.
★ Prevention and control measures should be solid.
★ Personnel screening should be accurate.
★ Start conditions should be complete.
3. Flow chart of project resumption of work and production
(1) The epidemic prevention and control plan has been formulated, the leadership system has been established, the key personnel have been put in place, the prevention and control safety measures have been put in place, and the construction conditions are met.
(2) The construction unit shall apply for resumption of work 2 days before the resumption of work.
③ The administrative committee of the territorial township or county economic development zone agrees.
(4) the county construction department for examination and approval.
The county epidemic prevention and control headquarters for the record.
6. do it!
Tip:
Major livelihood projects that apply for early resumption of work need to be audited by the county construction administrative department and reported to the county epidemic prevention and control headquarters for approval.
4. Four Guarantees for Resuming Work and Production
_ technical guidance
_ Field verification
_ patrol inspection
_ material support
5. The main responsibilities before and after returning to work.
The construction unit is mainly responsible for the epidemic prevention and control and safety production of the project, and is fully responsible for the epidemic prevention and control and safety production of the project, and fully deploys and urges the relevant contractors to implement the safety prevention and control work.
The construction unit shall bear the main responsibility of epidemic prevention and control and safety production on the construction site, and strictly implement various measures for enterprise epidemic prevention and control and safety production.
The project department of the construction site undertakes the specific responsibility of epidemic prevention and control and safety production on the construction site, and implements the epidemic prevention and control and safety production measures of this project item by item.
The supervision unit shall undertake the supervision responsibility of epidemic prevention and control and safety production, and do a good job in the safety prevention and control of project supervisors.
6. Illegal measures
Those who are found to have resumed work without authorization shall be ordered to stop work, and shall be dealt with according to the Measures for the Administration of Honest Behavior in the Construction Field of Xianju County and the Measures for the Recording of Bad Behavior in the Construction Field of Xianju County.
Strengthen the inspection of the resumption of work projects, and if it is found that the responsibility for epidemic prevention and control and production safety is not implemented, the measures are not in place, the hidden dangers are not ruled out, and the key personnel are not on duty, they will all be ordered to stop work, and will be dealt with according to the Measures for the Administration of Honest Behavior in the Construction Field of Xianju County and the Measures for the Recording of Bad Behaviors in the Construction Field of Xianju County.
Strengthen work supervision, and if it is found that there are concealment, omission, false report or refusal to implement epidemic prevention and control instructions and orders, the relevant units and responsible persons will be dealt with according to the law and regulations.
Warm reminder:
Enterprises can package and send the application materials for starting to resume work to the mailbox: xjjsjj123456 @163.com.
Relevant business guidance and consultation: consulting the quality supervision personnel of construction projects.
Telephone number of real estate project: 159067608 16
Tel: 1396855 1028.
Tel of municipal engineering:13606765171; 139676 12800