Cost engineer refers to the engineering economic professionals who are qualified by the state, licensed to practice after registration, specially appointed, entrusted or hired by a department or unit, responsible for and assisting them in the valuation, pricing and management of engineering cost, so as to safeguard their legitimate rights and interests.
The state implements the qualification system of cost engineers in the field of project cost. Units and departments engaged in the construction, design, construction, project cost consultation and project cost management of engineering construction activities must be equipped with professional and technical personnel with the qualification of cost engineers in the positions of valuation, evaluation, audit (nuclear), control and management.
Personnel who have obtained the qualification certificate of cost engineer shall go through the registration formalities with the local provincial (autonomous regions and municipalities) cost engineer registration authority according to regulations, and the registration period of cost engineer is 4 years. 0 months before the expiration of the validity period of 65438+, the holder must go through the renewal registration formalities at the registration authority as required.
Cost task:
First, the consistency between the implementation of specific tasks and the fundamental purpose of implementing tasks. The cost engineer should submit the project cost achievement documents to the unit or the entrusting party, which should be subject to the fundamental purpose of the cost engineer's task. Any activity that is not conducive to the reasonable determination of project cost and the correct implementation of effective control, and is detrimental to the interests of the state and society, is inconsistent with the task of cost engineers.
The second is to ensure the reasonable determination of project cost and the correct implementation of effective control, and to maintain the consistency of national and social interests. On the one hand, when carrying out specific tasks, cost engineers must first stand on a scientific and fair stand, regardless of the instructions received from any party.
By providing accurate project cost achievement documents, we can safeguard the interests of the state and the public and the legitimate rights and interests of the parties concerned. We should not stress professional ethics, be driven by interests, unilaterally cater to the wishes of the entrusting party, overestimate risks or depress prices, or even seek benefits by improper means. On the other hand, cost engineers must safeguard the interests of the state and the public as well as the legitimate rights and interests of both parties, and maintain the smooth implementation of the project cost achievement documents.