Environmental protection measures on the construction site of curtain wall project?

What are the environmental protection measures on the construction site of curtain wall project? The following is a detailed introduction of Zhong Da Consulting for your reference.

1 The living and working base shall set up a temporary and reliable enclosure in strict accordance with the scope designated by Party A and implement closed management. Temporary buildings are arranged in a neat and orderly manner, with smooth roads and drainage and complete "five small buildings". The domestic sewage shall be reasonably discharged, and the domestic garbage shall be transported in bags, equipped with sufficient fire-fighting equipment, and managed by the doorman. Conduct civilized management assessment on living and working bases, and create a clean living base.

2. Strengthen the management of fire sources, prohibit smoking on site, clean up the surrounding flammable materials during electricity, gas and welding operations, complete fire-fighting tools, place fire extinguishers in the hot work area, check regularly to control noise pollution and not disturb the people.

3. The construction rubbish and wastes on the construction site and floors should be cleared to the designated place in time, and removed from the site in time to ensure the cleanliness of the construction site and the smooth flow of construction roads.

4 do a good job in protecting the appearance and shape of installed components and components to be installed to reduce pollution. On-site installation materials should be neatly stacked in the designated area according to the relevant storage regulations, marked and managed by special personnel.

5 It is forbidden to throw materials at high altitude.

6. Keep the site clean, store products by category, put tools neatly, and store easily mixed products and parts strictly separately; Remove the installation garbage in time and pile it in the designated location.

7 Strictly control the noise, and try to stop the construction during the rest time to avoid affecting the hotel.

8 Set protective structures at entrances and exits and sidewalks to avoid danger.

9 No fighting during working hours, no fighting, no gambling, no drinking on the construction site, unity and friendship;

10 measures to reduce environmental pollution

10. 1 All curtain wall materials in this project are pollution-free materials, so after strict material management and thorough cleaning of on-site scraps, it will not cause pollution to the site;

10.2 auxiliary materials such as alcohol or toluene will be used when the plates are partially cleaned on site. In this regard, we will strictly control the construction process, so that cotton cloth with alcohol and toluene liquid can be recycled centrally, so as to prevent smoking and avoid accidents;

10.3 chemicals such as weather-resistant adhesive, structural adhesive and sealant are sent to the logistics for centralized recovery.

10.4 establish a safety emergency plan system to deal with emergencies in time and ensure the safety of personnel and property.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd