Analysis of main advantages and disadvantages of the project:
Project advantages:
1. The project is located in Yonghe section of Zengcheng, near Huangpu District and the urban area, with convenient self-driving.
2. The down payment ratio of the project is very flexible, the down payment pressure in the early stage is small, and there are many customers to adapt to.
3. The surrounding land price is around 23,000-23,500, surrounded by high housing prices, and the project price is low, which is a price depression with great investment potential.
Project disadvantages:
1. The surrounding environment of the project is poor. At present, the city railway is under maintenance and the roads are chaotic.
2. The volume of the project is small, only 8 buildings, which is not conducive to the price increase in the later period.
3. The project is not close to the subway, and public transportation is not very convenient in the later period, mainly by self-driving.