Binzhou Station, located near Huanghe No.20 Road and Bohai No.4 Road in Bincheng District, Binzhou City, Shandong Province (formerly Zhanglou Zhaocun), is about 2 kilometers north of Bincheng District Government Building and is under the jurisdiction of China Railway Jinan Bureau Group Co., Ltd.
Binzhou station, with a total area of 6.5438+0.2 million square meters, is a second-class station, which is used for both passengers and goods. It is the intermediate station of Delongyan Railway (Deda Railway Section), and it is expected to become the intermediate station of Beijing-Shanghai East Line (the starting station of Bindongwei Railway) and the starting station of Ji Bin intercity railway in 2025.
At the beginning of 20 19, Ji Bin intercity railway and Jinwei high-speed railway are progressing in an orderly manner. By then, Binzhou Station will serve as the transportation center of the city, which can reach Tianjin and Beijing in the north, Weifang in Dongying in the east and Liaocheng in Jinan in the west. Say goodbye to the history of high-speed rail.
Extended data
Historical evolution of Binzhou Railway Station;
2065438+July 2003, the construction of Binzhou West Railway Station on the German-Dalian Railway started. 2065438+April 2005, it is planned to rename Binzhou West Station of Deda Railway as Binzhou Station. 2065438+On September 28th, 2005, Deda section of Delong Tobacco Railway was opened, and Binzhou Station was officially opened.
The center mileage of Binzhou Station is DK 165+400, the station building adopts the layout of line-side flat station, and the passenger flow line adopts the basic platform of "flat entrance and exit"; The intermediate platform mainly organizes the flow of people in and out of the station through the streamline mode of "up and down" between the passenger overpass and the outbound passenger tunnel, and sets up the passenger tunnel.
The plane form of the station building is rectangular, with the plane size of 130.4m×38. 1m and the building area of11486.54m2.. The station building is designed with two floors in the central waiting area and three floors in the production office buildings on both sides. The main body of the station building adopts reinforced concrete frame structure, and the roofs on both sides adopt reinforced concrete roofs in areas A and C; The roof area B of the central waiting area adopts a quadrangular pyramid grid structure roof.