Expressway in Chongqing is the Chongqing section of G42 Hu Rong expressway, starting from Shangqiao in Chongqing and ending at Qingbangjiao in Wanzhou District. Expressway in Yuwan passes through Changshou District, Dianjiang County and liangping county, basically along the direction of the Yangtze River. There are more than ten interchanges along expressway, such as Yanggongqiao, Yujiawan, Renhe, Tongjiayuan, Yan Jia, Taohua Street, Hexing, Yuntai, Chengxi, Dianjiang, Zhou Jia, Yunlong, Liangping, Sun Jia, Fenshui and Qingbarpound.
The construction from Chongqing to Wanzhou expressway is divided into two stages. The first phase is 85km from Shangqiao to Taohua Street in Changshou District, which was completed and opened to traffic on April 28th, 2000. The second phase of the project is from Taohua Street in Changshou District to Qingbangjiao in Wanzhou District, with a total length of 18 1 km. It was completed and opened to traffic on February 65438+ in 2003.
The comprehensive reconstruction project of expressway Yucheng Avenue from Chongqing to Wanzhou includes the traffic optimization project at the north bridge head of Yangtze River Bridge and the comprehensive reconstruction project of Changqing Road.
North Bridge Head Interchange of Yangtze River Bridge is an important hub connecting Shanghai-Chengdu Expressway, Wan Li Expressway, Wanzhong Expressway along the Yangtze River and Wanzhou City. With the development of the city, especially after the completion of Wan Li Expressway and Wanzhong Expressway along the river, the traffic volume will further increase, and the existing interchange can no longer meet the requirements of traffic development and needs to be optimized. The scheme is to further optimize and improve the interchange on the basis of the original semi-interchange The plan is that the direction of Shanghai-Chengdu Expressway will be changed to go straight into the city, and the direction from Yangtze River Bridge to Shanghai-Chengdu Expressway will be changed to underpass.
The comprehensive reconstruction project of Changqing Road starts from the north bridge head of Wanzhou Yangtze River Bridge and ends at the exit of Wanzhou Toll Station in expressway, Yichang, with a total length of about 6 kilometers. According to the requirements of the district committee and government to build Changqing Road and dress up Yingbin Avenue, this section is positioned as a green corridor of rapid ecological traffic, which embodies the landscape characteristics of simplicity, atmosphere and ecology. This section will keep the original subgrade width of 24.5 meters unchanged, cancel the original central divider and re-divide.
The above is the introduction of Yimao Zhong Da Consulting to Yuwan expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.