202 1 project bidding template

When bidding for a project, you need a tender. Let's find out. The following is the "202 1 Project Bidding Template" compiled by me for reference only. Welcome to reading.

202 1 A new project whose project bidding template is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. Project overview

1. 1 project name: _ _ _ _ _ _ _ building construction project

1.2 construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

1.3 plan approval authority: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1.4 survey unit: municipal architectural design institute, class a.

1.5 Designer: Municipal Architectural Design Institute, Grade A.

1.6 bidding agency: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1.7 source of funds: self-raised, and the paid-in capital is RMB _ _ _ _ _ _.

1.8 Building area: _ _ _ _ _ _ _ m2

1.9 general situation of engineering structure

This project is divided into four categories: civil engineering and installation engineering. The structural form is a three-story frame brick-concrete structure. The total height is 7.2m, and the foundation forms are reinforced concrete independent foundation and reinforced concrete strip foundation.

1. 10 general situation of engineering construction: external wall: cement mortar surface is painted with wall finish; Windows: aluminum alloy push-pull (flat open) windows; Interior wall: coating exterior wall paint on the mixed mortar; Doors: the outer doors on the first floor are security doors, and others are beech board doors; The combination of rigidity and flexibility.

1. 1 1 Main functions of the project: commercial and residential buildings.

1. 12 construction drawing design and design data: the construction drawing design data is complete.

1. 13 the situation of four links and one leveling in the construction site (including geography, meteorology, topography, geology, hydrology, water source, power supply, material source, communication, traffic and available old buildings, etc. )

1. 14 equipment with new technologies, new materials, new equipment and specific materials, as well as requirements for waterproof, anti-corrosion, anti-pollution and underground and underwater special engineering construction. (None)

1. 15 installation of power lines, pipelines and equipment for large and medium-sized industrial and public * * construction projects and decoration of high school buildings are listed separately in the bill of quantities; (None)

2. Bidding related matters

2. 1 bidding scope

The bidding scope of this project is the following second item: ① ② ③ ④ ⑤ ⑧ ⑨.

① Large-scale earthwork,

② Foundation construction

③ Civil engineering

(4) Water supply and drainage and electrical installation works

⑤ Equipment installation project

⑥ Decoration project (secondary decoration project)

All landowners heating, ventilation, television, telephone, dust removal project.

(8) ancillary building works.

Pet-name ruby structural engineering

Attending demolition, four links and one leveling project.

2.2 signing method

This project is contracted in the form of contract and materials according to the bid-winning cost.

The winning bidder shall not subcontract the project, otherwise it will be disqualified from winning the bid. After the construction unit is approved by the provincial (city) bidding office, it will no longer choose a unit from the winning bidder for contracting.

2.3 tender offer:

All bidders shall quote the comprehensive unit price and total bid price of the bill of quantities according to the engineering situation, the construction market and the affordability of each construction enterprise.

The quantity of bill of quantities shall be compiled according to the Code for Valuation of Bill of Quantities of Construction Projects;

The valuation of labor, materials and machinery in the bill of quantities refers to the market material price information and market survey price information released by the competent department of engineering cost in X city;

The bill of quantities refers to the _ _ _ _ _ _ _ construction project charging rate published by the province, and each enterprise determines the quotation according to its own strength.

2.4 Time limit for a project and quality requirements

2.4. 1 construction period: the project is required to start on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2.4.2 Quality requirements: The winning bidder shall carry out the construction in accordance with the construction specifications and quality acceptance standards stipulated by the state, and the engineering quality must meet the requirements of the engineering design and the current construction and acceptance specifications, and must meet the excellent engineering quality standards when the project is completed; In order to achieve the goal of excellent engineering standards, the winning bidder must appoint a project manager above level 2 as the project leader, an engineer or above as the technical leader (or a person with more than 5-8 years of construction experience or an assistant engineer as the technical leader, and a person with more than 5-8 years of construction experience (or a person with similar engineering construction experience) as the builder.

2.5 Instructions to Bidders

2.5. 1 About the preparation and delivery of tenders

2.5. 1. 1 The tender must have the following contents; Tender in triplicate, one original and two copies of commercial bid, one original and two copies of technical bid.

(1) cover: including the name of the project subject to tender, the name of the bidder, the name of the magic weapon representative, and the filling date.

(2) Tender List

(3) The bid summary table shall be stamped with the seal of the unit and the legal representative.

(4) Comprehensive description of the tender: including: ① basis for preparing the tender; (2) the basis of tender offer, preferential conditions and various cost calculation instructions; (3) basic information of the unit (including enterprise qualification grade, number of employees, economy and technology, management personnel, assets and funds, technical equipment, construction experience, engineering quality, safety and civilized construction in recent two years, etc.). ). ④ Reply to the relevant requirements of the tender and confirmation of the main conditions of the contract ⑤ Other matters that need to be explained.

(5) Bidding quotation: subject to the total quotation of the project (in words).

(6) Construction organization design, including: ① construction scheme and method; (2) Main measures to ensure engineering quality, safety and civilized construction. (3) the construction schedule and the main measures to ensure the construction period. (4) Select main construction machinery and equipment and mobilization plan (5) Labor demand and mobilization plan. ⑥ Construction Tu Tu General Layout ⑥ Other construction technical problems that need to be explained.

(7) Construction organization. Including: the list of economic and technical management personnel such as project leader, project technical leader, builder, quality safety officer, documenter and their copies of qualification certificates.

2.5. 1.2 the bidder must carefully prepare the tender according to this tender document, design drawings and data, and make it at 8: 00-8: 30 a.m. on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2.5.2 Questions and Answers on Bidding and Site Survey.

2.5.2. 1 This project was carried out in _ _ _ _ _ _ _ on May 20th, 2006.

2.5.2.2 this project is completed in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2.5.3 Questions and Answers on Bidding and Site Survey

2.5.3. 1 bid evaluation organization

This project is composed of the bid inviting unit, the competent department of the project and invited economic and technical experts, etc. The bid evaluation committee or bid evaluation team.

Representatives of the bidding office, notary department and supervision department of the bidding unit are responsible for supervising the whole process of bid opening, bid evaluation and bid selection.

2.5.3.2 bid opening time

This project is scheduled to be opened at the bidding and trading center on.

2.5.3.3 bid evaluation principle

The bid evaluation adheres to the principles of equality, independence, objectivity, fairness and attention to credibility, and strives for reasonable price, suitable construction period, reliable quality, advanced technology and feasible scheme.

2.5.3.4 scoring principle and irrelevant method

This project adopts the scoring evaluation method in the bidding documents of X City, and comprehensively scores the quotation (or preferential conditions), construction period, quality, construction organization design, enterprise strength and reputation. , and calculate the total score of each tendering unit, and the winner is the winning bidder.

If there are two units tied for the first place, the winner of the tender offer will be the winning unit.

2.5.4 Provisions on invalid bidding

2.5.4. 1 The tender was delivered late.

2.5.4.2's bid documents are not sealed as required.

2.5.4.3's bid documents are not stamped with the seal of the unit and legal representative.

2.5.4.4's bid documents are not prepared according to the requirements of the tender documents or are illegible.

The legal representative of 2.5.4.5 tendering unit or its entrusted agent did not attend the bid opening meeting.

2.5.5 Bidding discipline

All bidders participating in this project must abide by the following disciplines.

2.5.5. 1 bid rigging or bid rigging is not allowed.

2.5.5.2 shall not falsely report the enterprise qualification grade and other related information.

2.5.5.3 shall not collude with the relevant personnel of the tenderer to crowd out the fair competition of other bidders.

2.5.5.4 shall not disturb the order of the bidding venue.

The personnel of the tendering units in 2.5.5.5 and the members of the bid evaluation team shall not participate in voting activities as agents of the tendering units.

In the whole tendering and bidding activities of this project in 2.5.5.6, all relevant personnel must be loyal to their duties, be honest and self-disciplined, and shall not engage in malpractices for personal gain or take bribes.

Anyone who violates the above discipline will be punished in strict accordance with the relevant provisions of the Regulations of the Ministry of Construction on the Management of Bidding for Construction Projects.

2.5.6. Other matters

2.5.6. 1 The tenderee shall pay a bid bond of RMB _ _ _ _ _ _ _ _ yuan to the tenderee after receiving the tender and other relevant materials. If the tenderer gives up bidding before the deadline for bidding, the deposit paid by him shall be refunded within 7 days after the bid-winning notice is issued; The deposit paid by the winning bidder shall be refunded within seven days after the signing of the contract; The voting unit withdraws from the bidding activities after the deadline for bidding; If the contract is overdue or refuses to sign after winning the bid, the deposit paid will not be refunded.

After winning the bid, the bidding unit in 2.5.6.2 shall sign a project contract with the construction unit within seven days with the bid-winning notice, and the terms of the contract shall be determined by both parties through consultation according to the bidding contents and the bidding situation of the bid-winning unit.

All bidders in 2.5.6.3 shall bear their own bidding expenses, and the construction unit shall not bear any compensation expenses regardless of whether the bidders win the bid.

3. The main terms of the contract

4. Matters not covered in this tender shall be implemented in accordance with the relevant provisions of the state, province, city and construction project bidding.

Tenderee: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Bidding Agency: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _