At present, there are 636 dilapidated dormitories in the community. Among them, there are 267 key dangerous houses, 90% of which are directly managed by the municipal housing management office, mainly distributed in Xixiang, Nanwuping, Shixiangzi and Hengjie areas, and 94 households are uninhabited. There are 369 old dormitories, mainly the corner building dormitory of Xiangtan original compressor factory, the dormitory of water transport company, the dormitory of waste recycling company, the dormitory of South China warehouse, and the dormitory of Dongping grain store. About 80% of the old dormitories are inhabited by residents.
Second, take measures.
(A) lay a solid foundation and effectively carry out disaster prevention and mitigation work.
The community set up a leading group for disaster prevention and mitigation, formulated a work plan for disaster prevention and mitigation at the beginning of the year, formulated an emergency plan in combination with the actual situation, improved the comprehensive disaster reduction infrastructure, and established temporary resettlement sites, medical rescue sites, disaster prevention and mitigation offices, and material storage rooms. The disaster risk map, comprehensive evacuation map and emergency rescue flow chart have been formulated, the daily management system for disaster prevention and mitigation has been established and improved, and a volunteer team for disaster prevention and mitigation has been formed to actively publicize and mobilize residents to participate in and carry out knowledge propaganda on disaster prevention and mitigation. In view of the rainstorm period and flood control period, the duty schedule should be made, inspections should be strengthened, and preventive measures should be taken to eliminate hidden dangers.
(two) to actively solve the disaster risk in this region.
1, there are 58 households in the areas of East Bus Station, Biandan Street and Taiping Street in the original low-lying flood-prone area. In the flood season of Xiangjiang River, this area is bound to be waterlogged. Dongping street and Hengjie community set up emergency relocation and resettlement places in a normal way, so as to ensure the timely transfer of personnel and important property, and the payment of living allowances in place to ensure the patrol and safety of Xiangjiang River during the flood season. From 2009 to 20 1 1 year, streets and communities invested a total of 654.38+10,000 yuan. Through the transformation of Shaoyaogang project, the wetland park 20 1 1 was built, which completely solved the problem.
2. In 2008, the houses of dangerous households in Xixiang Housing Management Office collapsed in the middle of the night, and the streets and communities urgently moved the affected houses to hotels to live and distributed living allowances. At that time, the street sought government support and solved 45 low-rent housing households in 2009.
3. During the period of 20/200910, the street spent more than 80,000 yuan on the maintenance of the piled houses in Shixiangzi area, which caused serious rain leakage and made them uninhabitable.
4.20 10 Street spent more than 7,000 yuan to build a protective frame to remedy the dangerous building of Xixiangzi Second Power Plant. Bricks and tiles on the wall often fall off, which seriously affects the safety of pedestrians in the aisle. To ensure the safety of pedestrians,
5, 201March 1 1 2 am, a fire broke out in a house at No.32 Hengjie, surrounded by dangerous buildings and brick-wood structures. The fire truck couldn't get in again, which caused all the property of this family to be destroyed. Fortunately, there was no wind, no casualties, and no burning to neighboring residents. The community relocated them and compensated their neighbors for their broken windows. The difference is nearly ten thousand yuan.
6.20 13 Dangerous buildings in Hengjie affect the safety of pedestrians and surrounding residents, and the street spends nearly 20,000 yuan to build protective sheds.
7.20 13 because the old wall of an enterprise in Hengjie partially collapsed due to waterlogging, endangering the safety of several neighboring households, the street invested more than 20,000 yuan to repair the wall.
8. Strive for the support of the District Construction Bureau, and build a sewer for the main road in Shixiangzi area in the area where waterlogging often occurs along the street, at a cost of more than 50,000 yuan, which completely solved this problem.
9.20 14, Shixiangzi District Housing Management Office directly manages the dangerous houses in public houses, and jointly establishes a community with Tongxin Community to communicate with Yuetang Housing Management Office for support. The Housing Management Institute incorporated it into the shed reform project and carried out transformation, renovated houses, upgraded roads, and built protective walls in key dangerous houses to eliminate hidden dangers.
Third, the next step
1. Increase the application and implementation of low-rent housing. In view of the specific situation of many dangerous houses in the community, we will comprehensively strengthen the investigation of dangerous houses, implement express approval for key dangerous houses, and transfer and resettle in time to ensure the safety of residents.
2. Implement a special examination and approval mechanism for dangerous buildings within the supervision area. Special treatment will be given to residents who meet the three principles of policy declaration to shorten the examination and approval time.
3. The government has increased investment to repair and transform dangerous public facilities and key parts of communities in Dongping Street to ensure the safety of residents' life and travel.