This quota is applicable to housing construction and decoration projects (including intermediate and general decoration) newly built, expanded and rebuilt within the administrative area of Fujian Province.
This quota is the standard for the measurement of material consumption, labor cost and machine use fee required for the completion of unit housing construction and decoration projects in Fujian Province; This quota is the basis for compiling and determining the construction drawing budget, bill of quantities, bidding control price (maximum bid price limit), construction contract price and project settlement of housing construction decoration projects invested by state-owned funds, the basis for mediating and handling project cost disputes and determining project cost, and the reference basis for other investment projects. It is the basis of compiling investment estimate and design estimate.
This quota is compiled according to normal construction conditions, common construction methods and techniques, reasonable construction period and qualified projects. Bidders (contractors) should consider the actual construction conditions, construction methods, construction period, project scale, specific quota differences and other factors when considering the project contract price. Small construction projects, sporadic decoration projects, sporadic decoration projects, advanced decoration projects, decoration projects, etc. are priced by this quota, and the difference between the quota and the actual market should be fully considered when signing the project contract price.
This quota is based on the current national and provincial product standards, design specifications, construction and acceptance specifications, technical operation procedures, quality evaluation standards and safety operation procedures, and refers to representative engineering design, building materials and other materials.
Unless otherwise specified, this quota includes the centralized stacking place, on-site warehouse or on-site processing place of materials, semi-finished products and finished products from the site.
The horizontal transportation fee from the point to the operation and installation site, and the transportation fee of turnover materials in different places in the same urban area, the actual horizontal transportation distance difference at the site will not be adjusted. This quota has included the vertical transportation cost of materials with eaves below 3.6m, and the vertical transportation cost of materials with eaves above 3.6m is calculated according to Chapter 17 vertical transportation project.
Fixed labor costs are compiled according to the base price, including social security fees that enterprises should pay to workers; Production of construction machines and tools of this quota
The expenses of medium and large machinery are compiled according to the consumption of machine-team, and the expenses of small machinery are compiled according to the mechanical expenses or other mechanical expenses. The base price of labor cost and machinery cost of this quota reflects the level of preparation period, and will be adjusted according to relevant regulations in the future. Unless otherwise specified in the design drawings or the quota of each chapter, the labor cost and construction machinery usage fee of this quota are generally not adjusted according to the actual site construction habits, construction machinery models or specifications.
This quota material consumption:
1. Material consumption includes main materials, auxiliary materials and sporadic materials, and the corresponding transportation and construction operation losses on the construction site are calculated.
2. The curing of concrete and mortar should be regarded as natural curing.
3. Turnover materials are compiled according to amortization consumption, and lease materials are compiled according to lease consumption and time.
4. Materials with a small amount and a small proportion of material expenses are merged into other material expenses, and are expressed as "Yuan".
5. Consumable materials of building tools and appliances are not included in the fixed consumption, but are considered in the use fee of production tools and appliances in the enterprise management fee.
6. When the semi-finished products such as concrete and mortar specified in this quota are different from the design, they shall be adjusted according to the Mix Proportion of Semi-finished Products such as Concrete and Mortar for Construction Projects in Fujian Province (version 20 17).
7. The mortar used in this quota is prepared according to the cement mortar mixed on site. If dry-mixed mortar is actually used, the labor cost per m3 cement mortar in the quota will be deducted by 56.79 yuan, and the mortar mixer in the quota will be adjusted to dry-mixed tank mixer, with the machine-team content unchanged.
This quota is based on the building eaves height within 100m. When the building eaves height exceeds 100m, the corresponding quota shall be calculated according to the following provisions. When the eaves of the same building are different, the super-high building cost can be calculated according to the different building heights. It is difficult to distinguish the ultra-high construction cost of a building vertically according to the building height, which is calculated by the weighted average of the building area above the ground.