This means that there will be a new express passage to Huanghua Airport in the south of Changsha.
Project overview:
Xiangfu East Road East Extension (Huangxing Avenue-Airport Avenue) road project is located in Changsha County, the main road is an urban expressway with a design speed of 80km/h, and the auxiliary road is an urban main road with a design speed of 50 km/h. It is planned to adopt the rapid design of elevated road and ground auxiliary road, with a total length of about 9.07km. According to the intersection width, the intersection section of the main road and parallel ramp spans 40 ~ 65 m.
The planned route intersects with Changzhu Expressway and Shanghai-Kunming High-speed Railway, with a total length of about 9 kilometers. It is estimated that the total investment is about 4.522 billion yuan (land acquisition and demolition are estimated temporarily), including 3.24 billion yuan for construction and installation.
This project is divided into two sections by the railway section:
The west section of the iron-related section of the first bid section is 5.398km long, the main line pile number is K6+994.492~K 12+393, the auxiliary road pile number is K7+459.35438+0 ~ K 12+393, and the construction and installation cost is about1963.
The east side of the iron-related section of the Second Bid Section is 3.506km long, with the main line pile number k12+565 ~ k16+071.383 and the auxiliary road pile number k12+562 ~ k16+086.