After the fabrication of steel members is completed, they shall be accepted according to the construction drawing and the national standard Code for Construction and Acceptance of Steel Structure Engineering (GB50205-200 1), which is divided into factory acceptance and site acceptance. As the site acceptance also increases the transportation coefficient, the following materials shall be provided for steel members when they leave the factory:
(1) product certificate and technical documents.
② Construction drawings and design change documents.
(3) Agreement documents for dealing with technical problems in production.
④ Quality certificates or test reports of steel, connecting materials and coating materials.
⑤ Welding procedure qualification report.
⑥ Test report of anti-skid coefficient of friction surface of high-strength bolt, nondestructive test report of weld and test data of coating.
⑦ Inspection records of main components.
⑧ Pre-assembly record: Due to the limitation of transportation and hoisting conditions and the complexity of design, parts are sometimes delivered in two or more sections. In order to ensure the smooth installation on site, pre-assembly should be carried out before delivery (when pre-assembly is needed).
Pet-name ruby component shipping and packaging list.