How to install the curtain track in Zhuhai?
Installation steps of curtain slide rail: firstly, prepare the accessories needed for concealed rail: fixing parts, pulleys, expansion screws or tapping screws, and sealing plugs. The first step is to draw a line to locate. Considering the firmness of fixing, in order to prevent the distance between the fixing parts from being too large to bear the tension, the size of the slide rail to be installed is measured first, and then the distance between the fixing holes is calculated. Generally, the distance between fixed parts is less than 50 cm, and then draw lines to locate. The accuracy of positioning is related to the success or failure of curtain installation. Step 2: Install the fasteners. Generally, when installing fasteners, it is necessary to add expansion screws to cement walls or roofs. Step 3: Thread the pulley. When the width of the window is greater than 1200mm, the curtain rail should be disconnected, and the bending at the broken part should be staggered, with a gentle bending curve and a lap length of not less than 200mm.