Which unit is building the subway in Zhengzhou and which monitoring unit is doing it?

Zhengzhou rail transit co., ltd

The Third Party Quality Inspection of Zhengzhou Rail Transit 1 Line 1 Project

Zhengzhou rail transit co., ltd

Beijing zhongchang engineering consulting co., ltd

The Third Party Quality Inspection of Zhengzhou Rail Transit 1 Line 1 Project

Zhengzhou Rail Transit Phase I 1 line starts from Kaixuan Road Station at the intersection of Zhengshang Road and Kaixuan Road and ends at Sports Center Station, with a total length of 26.2km and 20 stations. Set up a depot, a comprehensive maintenance base, a parking lot and a control center; Set up two main substations; B-type vehicles are selected, and the maximum running speed of the train is about 80 km/h. The construction period of the project is from 2009 to 20 13 years.