How to write a risk assessment report

Mainly consider the following aspects:

Legality of pre-project procedures, land, project establishment, environmental assessment, scheme publicity, etc.

The influence of the construction of the building itself on the surrounding area (the surrounding roads and buildings are blocked by sunlight, and the excavation of the foundation pit leads to cracks in the roads and surrounding buildings, etc.). )

Influence of construction stage, noise, dust and waste discharge on surrounding enterprises and residents.

Impact of operation stage: the impact of enterprise production on traffic and environmental protection.

Identification of risk sources

Risk prevention measures and risk prevention plans

Determination of risk level

Generally speaking, please leave a message if you need a detailed report.