What is the main task of the cost engineer of the engineering cost consulting company?

The work scope of the cost engineer is to prepare the tender control price, tender quotation, settlement documents, apply for visas, prepare the image progress payment documents and prepare the completion settlement. Cost engineers are employed by cost consulting companies, construction companies and construction units. As a cost engineer, you need to be responsible for the following work:

1, the course of drawing recognition. Skilled drawing reading is the basic skill of shear wall structure, frame structure and brick-concrete structure. The core of structural drawing recognition is to master structural atlas. 1 1G 10 national standard atlas and regional structure atlas are the basis of structural mapping.

2, familiar with the construction process and work content. Familiar with the construction process and work content is the basis of cost list and quota formulation.

3, familiar with 20 13 list specification and quota. 20 13 list specification and quota are necessary reference books for cost work.

4. Guanglianda software: steel bar calculation software, graphic calculation software and pricing software are engineering cost operation software.

5. Familiar with the cost workflow: how to estimate and estimate; How to compile bidding control price and list; How to prepare the tender offer; How to registered permanent residence and visa; How to make final accounts and so on.