Cooperation project of Zhejiang Dongzhou Construction Supervision Consulting Co., Ltd.

1997, the company obtained the ISO9000 family quality system certification, and in 2006 passed the re-evaluation audit of 1998. The number of the certification registration certificate is: 05203q1021r2m-1,which makes the management of the company more scientific, standardized, institutionalized and systematic. In 2003 and 2005, the company was rated as AAA enterprise by Hangzhou Enterprise Credit Rating Committee, which reflected the company's work philosophy and work style of high concept, high quality, high efficiency and credit. Completed projects include Wenling Jiangxia Drainage Tunnel Project, Jinhua River Panqiao Water Control Project, Jinhua Andi Reservoir Project, Shaoxing Yaojiabu Sluice Project, Yin County Hexing and Zhutou Standard Seawall Project, Cixi West Drainage Phase I Project, Cixi Xujiapu Drainage Project, Linhai Niutoushan Reservoir Irrigation Area Water-saving Continuation Supporting Project, Ningbo Xikou Pumped Storage Power Station Project, Fenghua River Flood Control Embankment (Rubber Dam) Project, Jinhua Shafan Secondary Power Station. More than 30 projects, including the main canal project of Wanyao Reservoir Irrigation District in Jiangshan City, Xujiang Hydropower Station Project, Hongqi Pond Project in Taihu Lake Basin, Yuhuan Shuangmiao Reservoir Reinforcement Project, Dongyang Hengjin Reservoir Spillway Reconstruction Project, Linhai Donggang Phase II Reclamation Project, Yuyao Seawall Reclamation Project, Zhoushan Putuo District Standard Seawall Project, Yuyao Hui Liang Reservoir Tunnel Project, Shaoxing Tangpu Hydropower Station Project, Shaoxing Pingshuijiang Reservoir Reinforcement Project, Jiaxing Hongqi Pond River Dredging Project, etc. For example, Shangyu Xiaoshunjiang water conveyance project, Rui 'an Xiaozhai sluice project, Deqing County Wu Kang Town flood control project, Jiangshan City third-class main dike project, Dongyang Youyu Reservoir project, and the provincial water resources department flood control office building project were rated as excellent projects by local quality supervision institutions and construction units, and were well received by the project legal person. The standard seawall in Shaoxing County and Tinghu Water Control Project in Shengzhou City won the "Orchid Cup" project, and the second phase project of Yongning River regulation in Huangyan was awarded the title of "2002 Water Conservancy System Civilized Site" by the Ministry of Water Resources and other units. Jing Zhengshu, former executive vice minister of the Ministry of Water Resources, spoke highly of the supervision work of our company during the inspection of the seawall project in Li Qian, Zhejiang. The person in charge of on-site supervision was rated as an advanced individual in the construction of standard seawall in Zhejiang Province, and won the third-class merit. Wang Shoulong, the company's chief engineer, and Zhao, the deputy general manager and chief supervision engineer, were successively rated as excellent supervision engineers and advanced workers in supervision work by Zhejiang and Hangzhou Supervision Association.