Electronic contract for logistics and transportation 1
Client: (hereinafter referred to as Party A)
Carrier: (hereinafter referred to as Party B)
Article 1: Service Content
Party B accepts the entrustment of Party A to provide transportation services such as air, highway and domestic express delivery.
Article 2: Service Confirmation Method
1. Party B is entrusted by Party A by telephone or fax to provide services such as door-to-door receipt, waybill and inspection.
2. After reaching the entrustment, Party A shall hand over all the formalities required for transportation to Party B in time (the goods to be shipped shall go through the formalities of examination and approval and inspection).
3. After accepting the entrustment of Party A, Party B shall go through the relevant goods formalities in time, issue a work order according to the transportation mode and service charge standard agreed by both parties through consultation, and transport the goods to the destination according to the negotiated transportation mode and time limit.
Article 3: Safety requirements and precautions during transportation
1. The goods entrusted by Party A shall be packed in a reasonable and safe way and insured. The insurance premium ‰ shall be paid by Party A, and Party B may handle it on its behalf; During the above service, Party B shall ensure the safety of the goods. In case of loss, shortage or damage to the goods, compensation shall be made according to the declared value of the insured goods, and the maximum amount shall not exceed the insured value of the goods. If Party A's uninsured goods are lost or damaged, Party B shall compensate Party A according to relevant regulations, and the compensation for domestic goods shall be 3 times of the freight of the pawned goods (calculated as 1 kg by documents).
2. During the period from the shipment of the goods to the receipt of the goods by the consignee, Party B shall be fully responsible for the loss, shortage, deterioration and damage of the goods. Except for one of the following circumstances: (1), force majeure; (2) Reasonable loss or property change of the natural properties of the goods; (3) The customer packs the goods by himself, and the goods are damaged due to inherent defects; (4) The customer packages the goods by himself, and the outer packaging is intact, but the goods inside are damaged, short or lost; (5) The fault of Party A or the consignee; (6) The losses not caused by Party B are verified through investigation;
3. After receiving the goods, all risks such as loss, shortage, deterioration, pollution and damage of the goods are transferred to the consignee, and Party B will not be responsible.
Article 4: Rights and obligations of both parties
1. Party A has the right to ask Party B to search for information feedback during the transportation of goods.
2. Party A is obliged to settle accounts with Party B at the time agreed in this contract, and shall bear relevant responsibilities in case of breach of contract.
Article 6: Disputes
Any dispute arising from the performance of this contract shall be settled by both parties through friendly negotiation. If there are other unfinished matters, it can be negotiated separately. The agreement reached is an annex to this contract and has the same legal effect as this contract.
Article 7: This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Electronic contract of logistics and transportation II
Party A:
Party B:
In order to clarify the rights and obligations of both parties,
I. Service items:
1. Party B, as the carrier of Party A's international express delivery, agrees to provide collection and forwarding services for documents and parcels sent by Party A to various regions of the world where Haoqun is located.
2. Party B agrees to provide standard free services for Party A, including door-to-door pick-up and delivery services and inquiry services. Party B shall provide free express materials such as waybill, envelope and express bag required by Party A's designated agent in Wuxi.
2. The respective obligations and responsibilities of both parties:
1. For the responsibilities and obligations of Party B, please refer to the endorsement clause of the air waybill of the House of Representatives.
2. Party A shall provide necessary customs declaration documents and correct goods information to Party B according to actual needs.
3. For the express mail that needs to pay the freight, Party A shall indicate it on the waybill when sending the express mail for payment. If it is a temporary express, Party A shall sign a temporary letter of guarantee with Party B to pick up the goods in person. Otherwise, Party B will handle it in advance, and Party A will bear the relevant expenses arising therefrom. Express delivery to pay freight must indicate the words TCPCJY in the account column of the waybill, and there is no need to fill in the account number.
4. Party A shall be responsible for the losses caused to Party B or a third party due to Party A's entrainment, concealment of dangerous goods, misrepresentation of the weight of bulky goods or violation of packaging standards and regulations.
Three. Price settlement
Payment type/method
1. 1. Prepaid freight shall be settled once a month. The price is calculated according to the attached pricing method.
2.B, Party B will send the express bill and settlement invoice sent by Party A in that month to Party A at the beginning of next month. Party A shall pay the freight to Party B's account in cash (or by cheque or bank deposit) after receiving the courier bill and settlement invoice, and the payment shall not be later than 45 days after Party B sends the courier bill and settlement invoice.
Four. Liability for breach of contract and liability for compensation
1. If Party B fails to perform the delivery obligations according to the contract, it shall be liable to Party A, and Party B's liability for compensation shall be subject to the endorsement clause of the sub-waybill. (It is suggested that Party A directly apply for insurance with the insurance company when the value of the express goods exceeds $65,438+000, so as to ensure that the losses caused by force majeure and other factors can be compensated. )
2. If Party A delays the payment of freight, Party A shall pay 0.5% of the liquidated damages to Party B for each day of delay.
3. If Party A fails to perform other obligations under this contract, it shall be liable for compensation according to the actual losses caused to Party B. ..
Verb (abbreviation of verb) Change and termination of contract
1. If Party A fails to pay the payment within two months, Party B has the right to unilaterally terminate this contract and reserve the right to claim compensation for breach of contract.
2. When this contract is terminated, liquidated, divided, merged, changed or terminated, both parties must notify the other party in writing 30 days in advance.
Settlement of intransitive verb disputes
In case of contract dispute, both parties shall negotiate amicably. If negotiation fails, either party may submit it to the court or arbitration institution where Party B is located for arbitration.
Seven. Validity of contract
This agreement is made in duplicate, with each party holding two pages. This agreement shall come into effect after being signed and sealed by both parties, and both contracts have the same legal effect.
This contract is valid from February 9, 65438, and any entrustment to Party A is valid ... Unless any party raises an objection in writing, this contract will continue to be valid until it is changed or terminated.
Eight. Other articles:
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Electronic contract of logistics and transportation 3
Party A: _ _ _ _ _ _ _ _ _ _ _
Permanent address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _
Permanent address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the actual situation, to clarify the rights and obligations of both parties; Following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement through consultation to conclude this contract.
1. Project location: peace county, Heyuan City.
2. Project content: transportation of earth-rock mines
3. Project contracting method: Party B provides vehicle transportation. The average distance is within _ _ _17 _ _ km.
4. Transportation price: Party A pays Party B RMB per ton.
5. The term of the contract is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
The responsibility of both sides of intransitive verbs
I. Party A's responsibilities:
1. Responsible for all matters related to construction, approval and taxation.
2. The construction site shall meet the requirements and time of construction conditions, and Party B shall be provided with accommodation, and all expenses shall be borne by Party B. ..
3. Responsible for the protection of buildings, equipment pipelines and ancient and famous trees around the construction site, and responsible for traffic police, urban management and traffic management. (Party A shall be responsible for the overload and general violation on the construction road. If the vehicle is detained for more than 24 hours, Party A shall compensate Party B 300 yuan every day. If the vehicle is confiscated by the government department during the transportation of this project, both parties shall negotiate that Party A shall compensate Party B according to the market price (excluding stolen vehicles or vehicles that have had traffic accidents).
4. Coordinate the relationship with other construction units and other relevant departments and local villagers (ensure smooth roads and build roads by special personnel. )
5. Party A guarantees that Party B has enough goods to transport every day, with at least four trucks every day. If the goods cannot be transported by Party B, Party A will use four trucks to make up the project payment for Party B every day.
6. If Party B can't transport normally due to Party A's failure to pay the project payment on time, Party A shall not only pay the project payment to Party B, but also bear Party B's lost time fee, which is 300 yuan RMB per vehicle per day (if Party A stops work due to special reasons, it shall notify Party B in writing in advance and obtain Party B's consent). If Party A fails to pay the freight for more than 7 days, Party B has the right to terminate the contract, recover the freight and lost time from Party A, and claim 20,000 yuan as liquidated damages.
Two. Party B's responsibilities:
1. Party B agrees that before _ _ _ _ _ _ _ _ afternoon 10. _ _ _ _ The arrival of 20 or more engineering vehicles and persons with carriages less than 6.3m required by Party A at the designated construction site shall not be delayed for any reason. Party A has the right to terminate this contract if Party B's vehicle exceeds the specified entry time for 3 days or more. In the future, it will be increased according to the needs of engineering quantity, subject to the arrangement and command of Party A..
2. Party B's vehicle work is tentatively scheduled to be within 12 hours every day (from 6 am to 6 pm, you can enter the mountain. There is no limit to the time of going out. Party B must fully carry out transportation operations within the time when it can start, and those that can be carried out within the specified time must be transported into the mountains. When the vehicle breaks down and needs maintenance, Party A must be informed immediately.
3. Party B agrees that the first three days of the first batch of vehicles with no less than _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ After meeting Party A's requirements, Party B agrees to start allocating vehicles in batches and arrive in three days. All vehicles will arrive at the appointed time. If Party B fails to arrive on time, Party B must compensate Party A for the lost time of 5,000 members. If the test conditions fail to meet the requirements of Party A, Party B has the right to prevent the construction vehicles from leaving the site.
4. Abide by the regulations of the state, local governments and relevant departments on the management of the construction site, and assist Party A to deal with the disturbance caused by the construction and the relationship with the surrounding construction units (residents).
5. Be responsible for the safety production of the project itself and buy insurance for the vehicle. Party B shall bear all responsibilities for accidents and life safety caused by Party B.. The cost of vehicle repair and maintenance shall be borne by Party B. ..
6. If Party B stops work without reason, or fails to meet Party A's capacity requirements, or disobeys the work arrangement, Party A has the right to find another team to enter the site for construction. And refuse to pay the previous project payment, and compensate Party A for the lost time of 20,000 yuan.
Seven. Safety measures:
For safety construction and inspection, Party B must abide by the safety production management regulations proposed by the project, organize the construction in strict accordance with safety standards, and accept the safety inspection and supervision of relevant personnel. Take necessary safety measures to eliminate hidden dangers of accidents. The responsibilities and expenses caused by Party B's ineffective safety measures shall be borne by Party B (civil liability and criminal liability).
8. Settlement of project funds: the project funds shall be settled by weighing in tons.
Nine. Payment terms:
After the first batch of _ _ _ _ vehicles of Party B arrive on schedule, Party A will lend 65,438+05,000 employees to Party B as living expenses before construction, which will be deducted from the freight one week later.
The settlement method is weekly settlement. After each day's work, Party B shall submit the transportation bill and refueling bill to Party A, and Party A shall issue the receipt certificate. Settle last week's freight before 5 pm every Monday. In the second week, Party B will deduct RMB 20,000 from the freight as the contract deposit for lost time.
10. If Party A continues to need vehicle transportation, Party A shall give priority to Party B's motorcade under the same conditions.
1 1. Party B must be able to prove that it owns at least two cars. Party B does not accept non-vehicle endorsements in this contract. Once Party B's non-vehicle ownership is found to be in breach, this contract will be automatically terminated.
12. Any work stoppage caused by non-human reasons such as weather, road maintenance, vehicle breakdown maintenance, safety inspection, policy change, etc. shall be borne by both parties, and neither party shall bear the compensation liability of the other party.
13. All the above agreements are reached by both parties on the basis of equality and voluntariness, and each party holds one copy. Matters not covered in this agreement can be settled by both parties through consultation during the contract period, and this agreement shall come into effect as of the date of signing. If both parties can't handle it, they can solve it through the relevant local judicial departments.
Party A: _ _ _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _
ID number: _ _ _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Contact information: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Contact information: _ _ _ _ _ _ _ _ _ _ _ _ _ _
Unit seal: unit seal:
Electronic contract of logistics and transportation 4
Shipper: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Carrier: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, and in line with the principles of good faith and mutual benefit, the Contract is concluded through full consultation between both parties.
Article 1 cargo information (if there are other agreed contents, an annex to the contract can be set up separately and written as an annex to the contract).
1. 1 Name of goods: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.2 Product specification: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.3 Commodity quantity: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 2 Packaging requirements
2. 1 The shipper must pack the goods according to the standards stipulated by the state.
2.2 If there is no national or industrial packaging standard, it shall be packaged in accordance with the principle of ensuring the safety of goods transportation, otherwise the carrier has the right to refuse to carry.
Article 3 Time and place of cargo transportation
3. 1 Place of shipment of goods: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3.2 Arrival place of goods: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3.3 Date of shipment of goods: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3.4 Date of arrival of goods: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 4 Transportation expenses
4. 1 The total transportation fee is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
4.2 `Payment method of transportation fee: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4.3 Payment time of transportation fee: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (write down the year, month and day).
Article 5 Loading and unloading of goods
5. 1 Party A is responsible for loading and unloading the goods.
5.2 The cargo handling expenses shall be borne by Party A..
Article 6 shipper's rights and obligations
6. 1 shipper's rights
6. 1. 1 Require the carrier to transport the goods to the destination agreed in the contract at the time and place agreed in the contract.
6. 1.2 After the goods are consigned, if the shipper needs to change the place of arrival, the consignee or cancel the consignment, he has the right to ask the carrier to change the contents of the contract or cancel the contract, but he must inform the carrier before the goods arrive at the destination or before shipment.
6.2 shipper's obligations
6.2. 1 Pay the freight to the carrier as agreed.
6.2.2 The shipper shall pack the consigned goods according to the agreed standards and deliver the consigned goods according to the time and quantity agreed in the contract.
Article 7 Rights and obligations of the carrier
7. 1 carrier's rights
7. 1. 1 Collect the freight from the shipper.
7. 1.2 The carrier has the right to store the goods that cannot be delivered beyond the contract period.
7.2 carrier's obligations
7.2. 1 Deliver the goods to the designated place within the time limit stipulated in the contract.
7.2.2 Transport the goods in the way and time agreed in the contract, and be responsible for the safety of the consigned goods.
Article 8 Liability for breach of contract
8. 1 shipper's liability for breach of contract
8. 1. 1 If the consigned goods are not delivered at the time agreed in the contract, the shipper shall pay the carrier RMB _ _ _ _ _ _ _ _ _ _ _.
8. 1.2 If other goods or means of transport, machinery and equipment are polluted, corroded or damaged because they are not packed as agreed in the contract, the shipper shall be liable for compensation for the polluted, corroded or damaged parts.
8. 1.3 If the freight is not paid as agreed in the contract, a penalty of _ _% of the freight shall be paid to the carrier for each overdue day.
8. 1.4 Other liabilities for breach of contract: _ _ _ _ _ _ _ _ _ _ _ _ (if there is no content, cross a line in the blank)
8.2 carrier's liability for breach of contract
8.2. 1 If the goods are not transported at the time agreed in the contract, the shipper shall be paid a penalty of RMB.
8.2.2 If the goods are not delivered to the place agreed in the contract, a penalty of RMB shall be paid to the consignor.
8.2.3 In case of loss, shortage, deterioration, pollution or damage of the goods during transportation, the shipper shall be compensated according to the actual loss of the goods.
8.2.4 The carrier shall not be liable for breach of contract if the goods are lost, short, deteriorated, polluted or damaged due to the following reasons:
① Force majeure.
(2) the natural attributes of the commodity itself.
(3) the reasonable loss of goods.
(4) The fault of the shipper or consignee.
8.2.5 Other liabilities for breach of contract: _ _ _ _ _ _ _ _ _ _ (if there is no content, cross a line in the blank)
Article 9 Force Majeure
9. 1 Force Majeure Range: _ _ _ _ _ _ _ _ _ _ _ (determined according to actual conditions)
9.2 If both parties fail to perform the contract as agreed due to force majeure, neither party shall be liable for breach of contract.
Article 10 Ways to settle disputes
Disputes arising from the performance of this contract shall be settled by both parties through consultation. If both parties fail to reach an agreement through negotiation, please choose the following _ _ _ _ _ _ _ (just fill in one or two items) to solve it:
(1) apply to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(2) to _ _ _ _ _ _ _ _ _ years.
Article 11 The signing place of this contract is _ _ _ _ _ _ _ _ _ _ _ _ _ _ (specify the place).
Article 12 This contract shall come into effect as of the date of signature and seal by both parties.
Article 13 The original of this contract is in duplicate, with each party holding one copy.
Article 14 For matters not covered in this contract, both parties shall negotiate separately.
Shipper (seal): _ _ _ _ _ _ _ _ _ _ _ _ _ Carrier (seal): _ _ _ _ _ _ _ _ _ _ _
Legal representative: _ _ _ _ _ _ _ _ _ _ _ _ Legal representative: _ _ _ _ _ _ _ _ _ _ _
Authorized Agent: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Authorized Agent: _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number
Bank: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Account number: _ _ _ _ _ _ _ _ _ _ _ Account number: _ _ _ _ _ _ _ _ _ _ _
Year, month, year, month, year
Logistics transportation electronic contract 5 pages
Party A:
Party B:
Based on the principle of friendly cooperation and mutual benefit, according to the Contract Law of People's Republic of China (PRC), combined with the current prices and relevant laws and regulations in Chengdu, the following terms of the agreement are reached through consultation between both parties, with a view to abiding by them together.
1. Name of transport object: coal burning.
2. Transportation place: the loading point _ _ _ _ _ _ _ _ _ and the unloading point _ _ _ _ _ _ designated by Party A..
Mode of transportation: The container length is within the range of 6 meters to 6.5 meters.
4. Transportation route: designated by Party A. ..
Five: transportation period: tentatively one year.
Six: The number of cars is tentatively set as 10, and the specific number depends on the situation. First, get on five cars.
Seven. Transportation price and calculation method:
1. If the transportation distance is less than 25km, it will be calculated as per vehicle 1000 yuan (RMB one thousand only).
2. If it exceeds 25 kilometers, it will be converted into 1000 divided by 25, which is equal to 40 yuan RMB/km; if it exceeds 500 meters, it will be 1 km; if it is less than 500 meters, there will be no km; if it exceeds 1 km, 40 yuan RMB will be added.
Eight. Payment terms:
The previous day's transportation payment will be settled on the next day 10, not later than noon 12. In this case, Party B has the right to stop work, and all losses shall be borne by Party A, and it shall be implemented according to Article 1 1.
Nine: Party A shall notify Party B of the vehicle entry time 24 hours in advance. After Party B's vehicle enters the site, Party A must arrange loading within 3 hours. If no arrangement can be made, it shall be implemented according to Article 4 1 1.
X. other terms and conditions
1. After Party B's vehicle enters the site, Party A is responsible for handling all kinds of certificates and passes required for going on the road.
2. During transportation, if traffic police, road administration, urban management, and villagers stop or are fined, Party A will take the responsibility for detaining cars and licenses, and Party B will not take any responsibility. (Therefore, the delay of Party B's transportation shall be subject to Article 4 of Clause 1 1)
3. Party B's driver drinks and drives. Driving with illness. In the event of a traffic accident, all responsibilities shall be borne by Party B, and Party A shall not be held responsible.
4. Party A and Party B communicate frequently and deal with problems in time.
5, 24 hours of homework.
6. Party B's vehicle shall obey the arrangement of Party A, and shall not change jobs. If Party A changes jobs, it shall compensate Party A for the loss of RMB 2,000.
XI: liquidated damages
1. If Party A's construction conditions are not complete, Party B cannot carry out the construction. (Except for irresistible natural disasters)
2. If Party B stops work without reason, Party A has the right to deduct the transportation expenses of the stopped vehicle. Party B shall bear it by itself.
3. The above 1 and 2 are regarded as breach of contract.
4. Default shall be calculated as 800 yuan per vehicle per day.
XII: After the vehicles enter the site, Party A shall immediately pay Party B an entrance fee of 65,438+0,000 yuan per vehicle. This fee will be refunded to Party A at the end of the project.
Article 13: Disputes between the two parties shall be settled through consultation.
Fourteen: After the agreement is signed, it will take effect automatically from the date when the vehicle enters the site.
XV: This Agreement is made in duplicate, with each party holding one copy. Have the same legal effect.
Party A: Party B:
ID number: ID number:
Tel: Tel:
Address: Address:
Year, month, year, month, year
Five related texts of logistics and transportation electronic contract;
★ 3 Contracts and agreements on cargo transportation and logistics.
★ Five practical modes of combined transport contract
★ 3 copies of logistics company's transport contract model.
★ Three contracts and agreements on cargo transportation and logistics in 2022.
★ 3 logistics and transportation contract templates.
★ 3 Latest contracts and agreements on cargo transportation and logistics.
★ 3 model contracts for highway logistics and transportation
★ 202 1 simple transportation contract
★ 3 samples of warehousing and logistics service contracts
★ Model container car transport contract