The main contents of measurement include: 1.
Clean up the areas involved in the renovation process.
Especially tile area, wall paint area, wallpaper area and floor area.
2.
Determine the main wall size.
Especially it is necessary to design the wall size of furniture in the future.
Second, the demolition and reconstruction of the main body has entered the construction stage, and the demolition and reconstruction of the main body is the first project, which mainly includes the demolition of walls, the shovel of wall skin, the demolition of heating equipment, and the replacement of plastic-steel windows.
To put it bluntly, it is to set up the framework of the construction site first.
Third, hydropower transformation is between hydropower transformation and main demolition transformation. Some novices may know that the first measurement of cabinets is needed.
The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers.
Mainly includes: 1.
See if the position of the lampblack machine socket affects the installation of the lampblack machine in the future.
2.
See if the water meter is in the right position.
3.
See if the location of the water inlet is convenient for installing the sink in the future.
For the first measurement of cabinets, a slightly experienced novice can completely complete it by himself.
After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately.
The kitchen generally doesn't need to be waterproof.
Some rookies always think that some main ingredients should be prepared in advance before the renovation begins.
What my master wants to say is that unless it is the main material needed for the main transformation, the entry time of main materials such as tiles and large core boards should be after the hydropower transformation.
Because if the circuit transformation involves slotting in the ground, if the tiles and core boards are not properly placed, it will be very troublesome for workers to walk around.
Woodworking, bricklayer and painter are the "three brothers" in the construction process, and the basic order of appearance is: woodworking, bricklayer (masonry) and painter.
The basic entry principle is that whoever is dirty will come to the fifth place first. If the workers are busy, the foreman will usually let the "mason's second child" enter the field to stick bricks before the "carpenter's boss" ends. This is normal, because the two do not conflict.
The operation of the "second mason" also involves the installation of the following three links: 1.
Installation of lintel and marble window sill.
The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window covers of marble windows are completed, the workers who install marble will prepare glass glue, so that marble and window covers can be sealed with glass glue conveniently.
2.
Install the floor drain.
Floor drain is the first hardware in home decoration, because it should be installed with floor tiles.
Therefore, novices should buy floor drains as soon as possible when they start visiting the building materials market.
3.
Installation of range hood.
The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.
When the "second mason" left, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, it is time to measure the cabinet for the second time.
Sixth, the "third oiler" who paints the wall comes into play, mainly completing the basic treatment of the wall, painting the top coat, and painting the furniture played by the "carpenter boss".
Beginners who are ready to paste wallpaper only need to let the "third oil worker" do the basic treatment on the wall surface where wallpaper is planned to be pasted.
At this time, when the "eldest", "second" and "third" leave the scene one after another, many rookies will think that their decoration is over. In fact, if calculated by links, it is less than one third.
Everyone has this feeling because it is generally understood that decoration is only the "construction link" of decoration, but in fact, the "installation link" of decoration is also the focus of decoration.
7. As the installation of kitchen and bathroom ceiling, the kitchen and bathroom ceiling is still continuing the "packaging" of the home.
At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the cabinet should have been bought.
Beginners had better install the ceiling lamp and exhaust fan (Yuba) of the cabinet guard at the same time, otherwise, thread ends and holes should be left.
Eight, after the cabinet ceiling is installed, you can install the cabinet at home.
If it goes well, it can be finished in one day.
At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
Nine, wooden doors installed on the second day of cabinet installation. As early as more than a month ago, the wooden door should be measured and can be installed now.
If it goes well, it will be a day. For hinges, locks, sinkholes and novices to be installed at the same time, relevant hardware should be prepared in advance.
X. Floor installation The floor can be installed the next day after the wooden door is installed. If all goes well, it will take a day.
The floor installation needs to pay attention to the following issues: 1.
Before the floor is installed, it is best to let the manufacturer visit the site to investigate whether the ground needs leveling or partial leveling.
2.
Before the floor is installed, the floor paved at home should be cleaned, the ground should be dry, and no water should be used during the cleaning process.
Eleven, the second day after the floor wallpaper, clean up at home, you can spread wallpaper.
If it goes well, it's also a day.
If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning.
Before pasting the wallpaper, try to make the wall "nothing".
Twelve, the switch socket installation socket is connected to three wires, press the left zero line and the right live wire, and insert the ground wire in the middle. Generally, the socket has said that the live wire is L, the zero line is N, and the ground wire is a symbol.
One end of the switch is connected to the live wire, and the other end is connected to the electric appliance or lamp, that's all.
Thirteen, the installation of lamps and lanterns, there is nothing to say.
After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration.
Fourteen, before the hardware installation, check the plumbing fittings, bathroom pendants, toilets, clothes hangers, etc. Everything I bought was fake.
After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware are installed, the home will be "alive", really "alive".
It is no exaggeration to say that it will be beautiful to turn on the tap for the first time and watch the water rushing; Convenient, the newly installed toilet at home for the first time will have a great sense of accomplishment.
By the way, we can give it a nice name: Left.
Fifteen. Installation of curtain rod The installation of curtain rod marks the basic end of home improvement.
Sixteen, entrepreneurial cleaning Before the entrepreneurial cleaning, don't install curtains.
When cleaning, don't have furniture and unnecessary household appliances at home, leave as many "planes" as possible, so that the cleaning can be thorough.
17. the earliest time for furniture to enter the market should be after the completion of hydropower transformation, so that you can get a general understanding of the basic size range of furniture.
Some novices are eager to order all the furniture before decoration, which is unnecessary.
Eighteen, home appliances enter the market at this time, home appliances should enter the market, the installation of the installation, ready to move in.
Nineteen, home soft-fitting home accessories is the last step of home improvement, decoration has become decoration, including the installation of curtains are furniture accessories.
As for buying curtains, it is best to book furniture first to avoid style conflict.