1, preparation before construction, detailed understanding of customer needs, ground conditions, mutual communication and consultation, etc. ;
2, construction work, the number of materials used, construction tools, construction process, effect, etc. ;
3. Correct construction organization and quality supervision: Ground engineering construction is generally the last working procedure before all infrastructure projects are completed and the owner starts construction. Generally, the construction period is tight, and it is a "face-saving" project with high requirements and many restrictions; There are six or seven processes in the construction process design from bottom to top, and some projects even have four or five processes, with many kinds of materials and demanding supporting requirements. There should be a reasonable construction schedule, because the interval of floor paint is required, and not operating according to the specifications will affect the product quality. Construction quality management stipulates that construction technicians should confirm relevant projects before construction; Ground painting construction must be strictly recorded; When the construction is completed and the site is handed over to the customer, the coating maintenance method should be reminded.
Engaged in epoxy floor industry for more than ten years, focusing on solving practical ground problems. Manager Yin (135,2209,6039).