Q: What are the main responsibilities of green building sign management in our city?
The "Notice" pointed out that the competent department of housing and urban and rural construction in our city is responsible for the identification, licensing and summary of the identification information of one-star green buildings in this city; Responsible for the preliminary examination and recommendation of the cultivation of star-rated green buildings and the identification of two-star and three-star green buildings in this city.
Q: What are the requirements of the Notice for new buildings in cities and towns?
The notice emphasizes that all new buildings in cities and towns should be designed in accordance with the Design Standard for Green Buildings (DBJ04-4 15-202 1), and proposes that the construction unit should specify the requirements of the grade and related indicators of green buildings when bidding or entrusting design, the project feasibility study report or project application report should include the requirements of green buildings, and the construction drawing design documents should be prepared with a special article on green buildings.
Q: What are the standards and procedures for the identification of green building signs in our city?
The "Notice" stipulates that the identification of one-star, two-star and three-star green buildings in the province adopts national standards. For projects that meet the requirements of the Measures, the reporting unit shall register and log in to the green building identification management information system (), fill in the basic information and main technical indicators of the project, conduct self-assessment and score the compliance of the project one by one according to the evaluation criteria of green buildings, submit relevant certification materials, and report to the municipal housing and urban and rural construction department.
Q: What are the requirements for the applicant of green building signs in our city?
The declaration of green building signs follows the principle of voluntariness, and is applied by the project construction unit, operation unit or owner unit, and relevant units such as design, construction and consultation can participate in the declaration.
Q: What incentives are proposed in the Notice to declare green building signs?
The Notice puts forward the incentive policy of giving priority to all parties in the identified green building projects.
Annex: Measures for the Administration of Green Building Signs (for Trial Implementation)
Measures for the Administration of Green Building Signs (for Trial Implementation)
Chapter I General Principles
Article 1 In order to standardize the management of green building evaluation signs in our city and promote the high-quality development of green buildings, according to the Measures for the Management of Green Building Signs (Jian Biao Gui [202 1] 1No.) issued by the Ministry of Housing and Urban-Rural Development (hereinafter referred to as the Measures) and the Notice of Shanxi Provincial Department of Housing and Urban-Rural Development on Doing a Good Job in the Management of Green Building Signs (Jin Jian Ke Zi [2000]
Article 2 The term "green building signs" as mentioned in these Measures refers to information signs indicating the star rating of green buildings and including performance indicators, including signs and certificates. Green building signs are uniformly formulated by the Ministry of Housing and Urban-Rural Development, and certificates are produced by licensing departments. Signs are produced by applicants according to different application scenarios and identify green building production guidelines.
Article 3 The scope of granting green building signs is civil buildings that meet the star-rated standards of green buildings.
Fourth green building signs are divided into three grades: one-star, two-star and three-star from low to high.
Fifth Taiyuan City Housing and Urban-Rural Development Bureau is responsible for the identification of green buildings within the administrative area of this Municipality. Under the city green building logo management office, the office is located in the Science and Technology Energy Conservation Bureau, responsible for identifying the city's one-star green buildings, awarding logos and summarizing and reporting the identification information; Responsible for the preliminary examination and recommendation of the cultivation of star-rated green buildings and the identification of two-star and three-star green buildings in this city.
Article 6 The following standards shall be adopted for the identification of star signs of green buildings:
(1) New civil buildings adopt the Evaluation Standard for Green Buildings (GB/T50378-20 19).
(2) The Evaluation Standard for Green Renovation of Existing Buildings (GB/T 51141-2015) is adopted for the renovation of existing buildings.
Seventh City Housing and Urban-Rural Development Bureau according to the needs of the work to establish a green building expert database.
Experts should be familiar with the national green building standards and local relevant laws and regulations, and understand and master the relevant technical requirements of engineering planning, design and construction. , with good professional ethics, with associate senior and above technical titles or obtain relevant professional qualifications.
Experts who participate in the identification of green building signs should adhere to fairness, openness and justice, and avoid the declared projects that are of interest to them. In violation of the provisions and evaluation criteria, depending on the circumstances included in the personal credit record, and removed from the expert database.
Eighth one-star green building sign evaluation experts should be composed of 7-9 people.
Chapter II Application Conditions and Application Materials
Article 9 The declaration of green building signs shall follow the principle of voluntariness, and shall be applied by the project construction unit, operation unit or owner unit, and relevant units such as design, construction and consultation may participate in the declaration.
Tenth to declare green building signs and projects should meet the following conditions:
(1) The design, construction, operation and renovation shall be carried out in accordance with national standards such as Evaluation Standard for Green Buildings (GB/T50378-20 19) or relevant local regulations.
(two) has passed the completion acceptance of the construction project and completed the record.
Eleventh to declare the green building sign project, the applicant shall provide the materials specified in Article 12 of these measures, and be responsible for the authenticity, accuracy and completeness of the materials.
Chapter III Declaration and Examination
Twelfth green building identification needs to be declared, recommended, reviewed, publicized and published, and the review includes formal review and expert review.
Thirteenth green building projects that meet the requirements of the Measures shall be declared by the reporting unit through the green building sign registration management information system (hereinafter referred to as the system), and the application materials shall be submitted as required and reported to the housing and urban and rural construction management department where the project is located.
Fourteenth green building logo management office within 7 working days to declare two-star and three-star green building logo project for preliminary examination, preliminary examination content according to the provisions of the "notice".
Article 15 After the preliminary examination, the Municipal Green Building Identification Management Office shall fill in the preliminary examination opinions in the green building identification management information system, recommend two-star and three-star green building projects that have passed the preliminary examination to the Provincial Department of Housing and Urban-Rural Development, and upload letters of recommendation.
Article 16 To declare a one-star green building sign project, the housing and urban-rural construction management department where the project is located shall log in to the green building sign management information system, conduct preliminary examination according to the contents specified in the notice, fill in the preliminary examination opinions, and report the qualified projects to the municipal green building sign management office.
Seventeenth through the preliminary examination of a star green building sign project, green building sign management office in 15 working days to organize expert review, determine the review opinions.
Eighteenth experts after the review, by the Municipal Housing and Urban-Rural Development Bureau in the portal website publicity. The publicity contents include the project location, type, name, reporting unit, green building star rating and key technical indicators. The publicity period is not less than 7 working days. The written opinions signed on the publicity project must verify the situation and handle the objections.
Nineteenth one-star projects that have no objection to publicity shall be examined and approved by the Municipal Housing and Urban-Rural Development Bureau, and the recognized one-star green building projects shall be announced, and a unified style certificate shall be issued to the Ministry of Housing and Urban-Rural Development. The project unit will make its own logo according to the green building logo production guide.
Chapter IV Supervision and Administration
Article 20 The Municipal Bureau of Housing and Urban-Rural Development shall strengthen the construction of the supervision mechanism that restricts the operation of green building identification power, scientifically design the workflow and supervision methods, clarify the management responsibilities and supervision measures, and effectively prevent and control the risks of clean government.
Twenty-first new buildings in cities and towns in our city should all be designed in accordance with the Design Standard for Green Buildings (DBJ04-4 15-202 1). When bidding or entrusting design, the construction unit shall specify the requirements of green building grade and related indicators, the project feasibility study report or project application report shall include the requirements of green building star rating, and the construction drawing design document shall prepare a special article on green building (annex 1). After the construction drawing design of the project is completed, the green building project is pre-evaluated according to the Evaluation Standard for Green Building (GB/T50378-20 19).
The above attachments 1 and 2 were downloaded from the notice.
Chapter V Identity Management
Twenty-second encourage project units to declare green building signs, and give priority to all parties of green building projects that have obtained signs.
Article 23 The project operating unit or owner who has obtained the green building logo shall strengthen the operation and management of the green building, strengthen the comparison between the operation indicators and the star-rated indicators of the declared green building, and report the main annual operation indicators to the green building logo management information system every year.
Twenty-fourth one-star projects with green building signs have one of the acts specified in Article 22 of the Measures. The Green Building Signs Management Office requires the project unit to carry out rectification, and the rectification period is 2 years.
Article 25 If one of the acts specified in Article 23 of the Measures exists in the one-star green building logo project, the green building logo management office shall put forward written opinions after verification, and the green building logo shall be revoked and the logo and certificate shall be recovered with the approval of the approving unit. The project whose green building logo has been revoked shall not participate in the evaluation first, and shall not enjoy the preferential policies for green buildings given by the government.
Twenty-sixth project construction units or users have objections to the appraisal results, they may apply for administrative reconsideration or bring an administrative lawsuit according to law.
Before making a decision to revoke the one-star green building sign, the examination and approval unit shall inform the applicant in advance that it has the right to make statements and arguments. The facts and evidence submitted by the reporting entity shall be examined, and if the facts and evidence are established, they shall be adopted. If it is not adopted, the reasons shall be explained. The revocation decision shall be delivered to the reporting unit in time and announced to the public.
Chapter VI Supplementary Provisions
Twenty-seventh project pre-evaluation can refer to these measures to carry out green building pre-evaluation after the completion of the project construction drawing design, but no logo is granted.
Twenty-eighth approach by the Taiyuan City Housing and Urban-Rural Development Bureau is responsible for the interpretation of.
Article 29 These Measures shall come into force as of 202 1 12 1.