I'm going to start decorating. Let me ask you a few questions.

1, finding a small construction team will naturally save money, but it must be made clear who will provide water pipes, electric conduits, gas pipes, cement, yellow sand, sewer pipes and triangle valve. In fact, it is half-package, clear-package and all-package. Look at your own thoughts.

2, cabinets, hanging cabinets are naturally much better, but the price is much more expensive. If it is customized, the key depends on your own coordination ability, which involves a delivery date and installation, and you have to calculate the time.

3. When the water pipes and electric pipes are officially sealed, you should explain that you must take care of them before sealing, and then ask them to give you the pipeline map. It's better to make it waterproof again. In fact, it is very simple, that is, buy waterproof paint and brush it again.

4, the coil material absconded, hehe, is your material expensive? There is only corruption, there is no need to abscond. You can't buy all the materials at one stage at a time and pile them all in the room. You are in trouble without all-weather supervision. It's best to have someone on the spot to watch the cleaning or semi-cleaning. Even if the frequency is high, the decoration team dare not mess around.

There is another important point in the decoration. What is invisible is far more important than what is visible. For example, waterproof, water pipes, wire tubes, wires, sewage, floor drains, valves, hardware, wall coating materials and so on. Pay attention to a lot you'd better study more.