Engineering cost consulting service fee

The project cost consulting service fee is introduced as follows:

Depending on the cost, the charge ranges from 0.6% to 4.5% of the cost of 65438+.

charging item

1. Engineering design fee: generally including preliminary design and budgetary estimate, construction drawing design, cooperative construction stipulated in the contract, design technical disclosure, participation in trial operation, project completion acceptance and other expenses. This charging standard does not include the cost of making the construction drawing budget.

2. Pre-preliminary design work expenses: refers to the expenses required for preparing feasibility study report, designing task book, participating in site selection and planning, and conducting environmental pre-assessment.

3. Design fee for non-standard equipment: refers to the design fee for non-standard equipment. In some industries, engineering design itself includes equipment design, so non-standard equipment design fees are not charged separately.

4. Software compilation fee: refers to the compilation fee of computer control programs in the production process of the factory. If there is no standard in the industry, it can be agreed by both parties according to the use value and advanced degree of the software and considering the actual workload of writing the software.

Engineering cost classification

According to the different majors involved, the engineering cost consulting industry can be divided into housing construction engineering cost consulting, municipal construction engineering cost consulting, highway construction engineering cost consulting, railway construction engineering cost consulting, urban traffic construction engineering cost consulting and so on.

According to the different stages of engineering construction, engineering construction consultation can be divided into pre-decision stage consultation, implementation stage consultation, settlement audit stage consultation, whole process engineering cost consultation, engineering cost economic dispute appraisal and arbitration consultation.