Tianjin national day light show 20 19 time address+Tianjin traffic control+? Construction section

There will be a light show on National Day in Tianjin. Don't miss it. Besides the lantern show, there will be some other activities in Tianjin on National Day. If the National Day is just about to visit Tianjin, then the relevant traffic information strategy must be clearly understood. Let's take a look at Bian Xiao.

Light show: the night light show of the whole city

Opening and closing time: September 29th-10/October 8th, every night 19:30-23:30.

Night lighting facilities along the Haihe River, key lines in the central city and the Olympic Sports Center are used for lighting facilities of bridges, water systems, landscape buildings, tower landscape platforms, commercial plaques and outdoor advertisements.

Connect the lighting landscape of points, lines, groups and films to show the colorful and dazzling night lights in Tianjin.

The Olympic Sports Center and the banks of Haihe River jointly performed the lighting group, re-edited and played the slogan picture with the characteristics of the National Day celebration, and the large electronic display screens along the street scrolled synchronously.

Ancient Culture Street Peking Opera Light Show

I still remember that during the China International Import Expo(CIIE) held on September 6th, the Peking Opera Light Show of Guwen Street Opera House was staged again during the National Day.

Specific performance date: 65438+ 10/0/-6.

The Ancient Culture Street Theater is located directly opposite the Tianhou Palace. Now people see this theater rebuilt in 1985. The original theater is only 5 meters away from Tianhou Palace, and it is the earliest open-air stage in Tianjin. It is also the earliest place for Tianjin people to entertain themselves. The current theater is 12m high, 10m wide and1/0.5m deep. The stage is located on the second floor, connected back and forth.

Due to the large flow of people during the National Day, all performances were held in the theater from June 65438+1 October1to June 6. Although the venue is limited, the performance quality remains the same.

Fant UAV light show

65438+1At 20:50 on October 2 -7, there will be a drone performance over Tianjin Fangte Castle.

This drone performance will combine lighting, sound effects and other elements to present the dove of peace and me? China and other different patterns and characters.

In addition, the beloved designs of Xiong Da, Xiong Er and Logger Vick will also shine over the castle, presenting different childlike colors for children.

The real-life modeling article takes Tianjin Auditorium as the center, decorating the surrounding roads, running through the east, west, north and south, and rendering the bright center; Light-box national flags are set up on Friendship North, Friendship Road, Friendship South and Waterway; Rod-type national flags are set up on Zijinshan Road, Meijiang Road, Machang Road, Waterfront West Road and Hotel West Road.

Yinhe Square, the intersection of Youyi South Road and Meijiang Road, the square in front of East Station, Nanjing Road Earthquake Monument, Minyuan Square, Friendship Park and Youyi Road, Hedong Park, Shizilin Street, around the Olympic Sports Center, Xigu Park, Yangliuqing Square, Meijiang Convention and Exhibition Center, etc. 100 will be unveiled.

The garden department has arranged more than 200 flower beds around key parks, scenic spots, road nodes and Olympic Sports Center in the city, including more than 200 fine flower beds 100, with an area of 100 square meters. The area of grass flowers in the city has reached more than 60,000 square meters, with more than 60 kinds of flowers and more than 2.6 million flowers.

Before the National Day, two comprehensive parks in the urban area will be decorated with large flower beds, such as the water park with two flower beds at the east gate and northwest gate, the zoo, Nancuiping Park, Shuixi Park, Changhong Park, Xigu Park, People's Park and Hedong Park.

Heping District is mainly composed of three-dimensional flower walls and flower beds. Jiefang North Road and Harbin Road, Baoding Road and Datong Road are three intersections, Chengdu Road and Hebei Road and Nanjing Road are two intersections, and flower beds are arranged in the Fifth Avenue area. Heping District also has two three-dimensional flower walls at the intersection of Tai 'an Road and Hubei Road, opposite the Peace Hotel in Dali Road.

In Hexi District, flower beds, flower styles and flower stands are arranged at key nodes such as Friendship Road, waterfront West Road and Friendship Park, Cultural Park and the intersection of causeway and Friendship Road.

Nankai District has set up flower combination scenic spots around the Olympic Sports Center, Drum Tower, the intersection of Hongqi Road and huanghe road, and the Haihe River hydrophilic platform.

Nankai District, Hedong District and Hebei District have all arranged flower beds and flower borders along the Haihe River. There are many groups of flower borders in Yifeng District, Hebei Province.

On both sides of Tianjin Avenue, several groups of flower borders are arranged with perennial flowers, ornamental grass and grass flowers.

In Beichen District, flower beds were arranged in Beichen Park, Beijing-Tianjin Highway and Beichen Road, and 12 flowers were placed. Other districts also arranged flower beds, flower borders and styles to celebrate the National Day.

In terms of plant selection, red and yellow flowers are the main colors, making full use of suitable flowers in Tianjin, choosing more flowers with longer flowering period, and choosing ornamental grass and foliage plants to form the landscape.

The main plants are Begonia Siji, Petunia, Scutellaria barbata, Corydalis yanhusuo, Clove, Peacock Grass, Dutch Chrysanthemum, Canna, Rose, Salvia, Deciduous Trees, Ficus, Five-color Grass, Asparagus, etc., and the ornamental garden plants are particularly rich.

The garden department promotes the growth of the city flower rose, and controls the flowering period by pruning, so that the city flower rose opens neatly at the end of September 65438+1early October.

The main rose attractions are Munan Park, Earthquake Monument, Hedong Park, Hedong Rose Garden, Qiao Yuan, People's Park, Changhong Park, Eight Streets Rose Garden in Development Zone, and high-speed railway station Rose Garden in Development Zone.

Traffic Control In order to ensure the flag-raising ceremony to celebrate the 70th anniversary of the founding of New China in Tianjin, it is decided to take traffic restriction measures on some roads: from 8: 30 to 65: 438 on October 0, 20 19, Friendship Road (from Binshui Road to Pingjiang Road) and Binshui Road (from Friendship Road to Hotel West Road) are closed to all vehicles and pedestrians.

Construction section 1. Due to road construction, from August 23rd, 20 19 to February 22nd, 20 19, the east half ring of Huayuan Road (Chengde South Road-Chengde North Road) and Dandong Road (Chifeng Road-Huayuan Road) in Heping District were closed. It is suggested that vehicles and pedestrians bypass Chifeng Road and Huayuan Road. Passing vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoid. 2、

Due to road construction, from August 24th, 20 19 to June, 20 19+02, Qi Jing Road (Beichang Road-Qiwei Road) was closed to motor vehicles. Passing vehicles can bypass Liu Jing Road, Qiwei Road, Bajing Road, Beichang Road, Bawei Road, Jiuwei Road and Qi Jing Road. Vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoiding.

3. Due to the construction of Youyi South Road Station on the subway 10 line, from August 2065438 17 to October 30, 2020/KLOC-0, the carriageway and sidewalk of Youyi South Road (intersection with Zhujiang Road) and Zhujiang Road (east and west sides of the intersection with Youyi South Road) were partially constructed. Vehicles and pedestrians passing through the construction section can pass through the newly-built guiding roads on the west side of Youyi South Road and the south side of Zhujiang Road. During the construction period, the east and west sections of the intersection of the leading auxiliary road of Zhujiang Road and the leading auxiliary road of Youyi South Road prohibit motor vehicles from going straight to Zhujiang Road and turning left into Youyi South Road, and all motor vehicles are prohibited from turning right into Youyi South Road, bypassing Meijiang Road and Zuojiang Road. Vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoiding.

4. Due to the delay in the construction of drainage pipelines and roads, from August 28th, 20 19 to October 28th, 2020 10, motor vehicles are prohibited from passing through Wuma Road (Huang Wei Road to Riwei Road), while motor vehicles bypass Yu Wei Road, Zhou Wei Road, Riwei Road, Sima Road, Sanma Road and Ermayina Road, and non-motor vehicles are pushed by sidewalks. Part of Wuma Road (west of Huang Wei Road, Riwei Road to Lv Wei Road) is occupied. When the road on the construction section becomes narrow, passing vehicles must pass according to traffic signals and slow down to avoid.

5. Due to the construction of drainage pipeline, the road at the intersection of Zhenli Road and Taixing Road was narrowed from August 20 19 to August 20 1 June 1 day, and vehicles were prohibited from turning left from east to south on Zhenli Road. Turn left and bypass Jingjiang Road, Jiangdu Road and Hongxing Road. Passing vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoid.

6. Due to road widening and reconstruction, Jiangyuan Road (east of Tuanjie Road 150m to west of Tuanjie Road 150m) and Tuanjie Road (Jiangyuan Road to Tuanjie Ring Road) are closed to traffic from June 26th to October 25th. Vehicles and pedestrians can bypass Tuanjie Ring Road, Jiangyuan West Road, Jiangyuan East Road, Haiyuan Road, Xiqing Road, Xihengdi Expressway and Xianyang Road.

7. Due to the maintenance and construction of Jindong Road, July 20 19 to June 20 10.

At the end of 10, motor vehicles (except units and individuals in the construction area) are prohibited from passing through Jindong Road (Jintang Second Line to Jintang Highway), and motor vehicles can bypass Jintang Highway, Jintang Second Line, Hangang Highway, Outer Ring Road and other roads.

8. Due to road maintenance construction, vehicles on the Jin-Han double track (from Yubin Highway to Qinghe Second Bridge) are prohibited from September 5 to 201191October 20. Vehicles can bypass Gangcheng Avenue, Beijing-Tianjin Expressway, Shen Chang Expressway, Kim Highway, Han Cai Road, Dafeng Road, Siwei Road and Yubin Highway.

9. Due to road construction, the static waterway in Xiqing District (Jingang Highway to Li Shuang Highway) was closed to motor vehicles (except those in the boundary) from August 20th to 20th/20 19120th. Passing motor vehicles should bypass roads such as Jingang Highway and Li Shuang Highway and drive according to traffic signals.

10. Due to the construction of Shuanggang Station in the second phase of Metro Line 6, Weishan South Road (234 meters north of Beijing Street to 0/90 meters south of Beijing Street, including the intersection of Beijing Street) in Jinnan District was closed to traffic and traffic. During the construction period, a guide road with a length of 342 meters and a width of 4 meters will be built on the east side of the closed construction area of Weishan South Road, which is only for non-motor vehicles and pedestrians, and motor vehicles are prohibited from passing through this section.

1 1. Due to the construction of the bridge road, traffic was closed on LG Road in Beichen District from July 3, 20 19 to June 30, 20 19. Vehicles and pedestrians can bypass Jinwei Highway, Outer Ring Road, Beicang Extension Line and Jiafeng Road. The road of Jinwei Highway (Dynasty Winery-Yixing Fuqiao) has become narrower, so vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles is 30 km/h), and pay attention to avoid it.

12. Due to road maintenance and construction, trucks are prohibited from passing Guangming Avenue (Hongqi Road to Innovation Road) from August 26th, 20 19 to June 30th, 2065 438+065 438+065 438. Freight vehicles can bypass roads such as Innovation Road, Jinqi Highway, Maxi Road and Hongqi Road. When the road surface of the construction section becomes narrow, passing vehicles and pedestrians must follow the traffic signals, slow down (the speed limit of motor vehicles on the construction section is 30 km/h), and pay attention to avoid.

13. Due to bridge construction, motor vehicles in Hangzhou Road (Dongjiang Road to Shaoshan Road) in Binhai New Area were closed from July 2, 20 19 to June 30, 2020. Please bypass Shaoshan Road, Wangda Street, Hebei Road, Jintang Highway, Guangzhou Road and Dongjiang Road for passing motor vehicles. Motor vehicles in Shaoshan Beili Community will enter and exit Wangda Street on the right.

14, due to road overhaul construction, Dagang North Crossing Road (Haijing Avenue to Haiphong Road) was closed (except vehicles and pedestrians in the boundary) from July 20 1 day to February 3 1 day. Passing vehicles and pedestrians can bypass roads such as Jinqi Highway, Haijing Avenue, Textile Avenue, Central Avenue and Haiphong Road.

15, 20 19 July 27 to 20 119, Yiwei Road (Jin-Han double track1)

The Hangu Bridge is closed to traffic, except vehicles within the boundary. Passing vehicles bypass Binhe Road, Xinkai North Road, Wenhua Street, Zhaishang Bridge, Yubin Highway, Sijing Road, Sanwei Road, Wujing Road, Sanjing Road, Erjing Road and Yijing Road.

16. Vehicles and pedestrians were banned from wuqing district Wuxiang Highway Qinglong Bay River Bridge from July 7, 20 19 to June 6, 2019. Vehicles and pedestrians should bypass Lini Line, 605 County Road, Heda Road and other roads, and follow the traffic signals.

17. Due to road construction, wuqing district Shengli Road (Yongyang East Road to Da Qiao Road) and Changde Street (Yongyang East Road to Da Qiao Road) were closed to traffic from July 2, 2065438 to 10/4.

18, due to wuqing district Gaowang Lufeng Hexi Branch Bridge, from July 29 to July 20 1 165438, vehicles and pedestrians are prohibited from crossing Gaowang Lufeng Hexi Branch Bridge, but they can bypass Tanglang Highway, Beijing-Tianjin Highway and Heda Highway.

19, reconstruction project of Yinsha Expressway, August 2065438 18 to August 2065438 +09.

From June 365438 to1October 3 1 day, vehicles (except units and individuals in the construction area) are prohibited from passing on Gaosha Road (Wanghe Branch Road to Fenggang Road), and vehicles can bypass Wanghe Branch Road, Gaowang Road, Fenggang Road and other roads.

20. Due to road maintenance construction, Jing Qing Highway (from Tangguantun Tunnel to Hebei Province) was closed to motor vehicles (except domestic motor vehicles) from August 27th to February 3rd, 20 19. Passing vehicles can bypass Tiancheng Line, Tuantang Highway, New National Highway 104, Tuanda Highway, Jing Qing Highway (under construction) and other roads.