Wan Li Expressway —— Brief Introduction
There is another passage from Chongqing to Hubei. 20 14,18 On August 8, the reporter learned from Chongqing Municipal Communications Commission and Chongqing Expressway Group that the Chongqing section of Chongqing-Wanzhou (Chongqing Wanzhou to Hubei Lichuan) Expressway has been fully started and is expected to be completed in 20 18. After the completion of Wan Li Expressway, it takes only 40 minutes to drive from Wanzhou, Chongqing to Lichuan, Hubei.
Wanli Expressway-Line
Chongqing section
Wan Li Expressway starts from Ma 'anshi, Xiong Jia Town, Wanzhou, connects with Wan Yun Expressway by Ma 'anshi Junction Interchange, and ends at Sanyuanchang, Longju Town, Wanzhou, with a total length of about 52 kilometers and a design speed of 80 kilometers per hour, with four lanes in both directions.
There are two interchange hubs (Ma 'anshi and Changling) and five general interchanges (Princess, Jiangnan, Wuqiao, Long Beach and Longju), with an average tunnel every 8 kilometers. Among them, Ma 'anshi Interchange in Xiong Jia Town is connected with Shanghai-Chengdu Expressway (G42), and Zhongwan Expressway under construction (a section of G69 in Chongqing) is connected into a network at Changling Interchange.
Wan Li's expressway construction is not easy, and the bridge-tunnel ratio is as high as 54%. Among them, there is also a bridge with the largest main span among expressways in our city-Wanzhou Ma Xu Yangtze River Bridge. The bridge is a steel box girder suspension bridge with a main span of 1050m and a total length of 2030m. This bridge is also the control project of Chongqing section of Wan Li Expressway, which is expected to be completed on 20 18. The Chongqing section of Wanli Expressway is expected to be completed and opened to traffic by the end of 20 17.
Hubei section
It starts from Qigan Village, Wuliang Township, Lichuan City, connects with Hubei section of Shanghai-Chongqing Expressway, passes through Wuliang Township, Nanping Township and Moudao Town, ends at Tianjiayakou at the junction of Hubei and Chongqing provinces, and connects with Chongqing section. The total length of the route is 42. 1 km, and the approved total budget is 5,242.4 million yuan. There are 3 interchanges, 1 service area, 4 separated interchanges, 2 ramp toll stations and 1 main toll station.
Wan Li Expressway-Significance
At present, it takes more than two hours for citizens to drive from Wanzhou to Lichuan, Hubei Province, mainly by National Highway 3 18. After the completion of Wan Li Expressway, it takes only 40 minutes to drive from Wanzhou to Lichuan. After the completion of Wan Li Expressway, it will also be another provincial-level channel from Chongqing to Hubei.
At the same time, after the completion of this expressway, it will be connected with the Shanghai-Chengdu Expressway and the Shanghai-Chongqing South Line Expressway, so that local highway vehicles can get on the national expressway network as soon as possible, and all the way eastward to the eastern coastal cities such as Shanghai.
The above is the introduction of CBI Zhong Da Consulting to Wan Li Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.