At present, the red line extension scheme is to extend to Luzhu and southward to the forest garden; The Orange Line is planned to branch from Fengshan Middle School Station, extend eastward, cross Gaopingxi of Pingtung Line of Kaohsiung MRT to Pingtung City, and the Daliao Line of Kaohsiung MRT extends southward from Daliao Station to Linyuan. Among them, the two extension lines of Daliao and Linyuan are laid by light rail rapid transit, which cannot be directly connected with the original line and must be transferred.
At present, the planned routes of Kaohsiung MRT include 9 lines, such as Ring Light Rail, Yanchao Line, Youchang Line, Brown Line, Yellow Line, Fengshan Line, Waterfront Line, Green Line and Foguangshan Line, and the planning of Blue Line has been terminated. The circular light rail is about to be completed and has been approved to be built in OT mode.
Kaohsiung MRT route list:
In operation: main line: 2, branch line: 0
Planning: main line: 9, branch line: 8.
Total count: main line: 1 1, branch line: 8.
Plan termination: main line: 1, branch line: 1.
In addition, the following systems are planned in the long-term road network planning book of the Kaohsiung Municipal Government MRT Bureau, and some systems are not economical after analysis. It is not recommended to list other systems. Mileage of the whole route/branch line/extension line (km)
Length Status of Machine Factory Remarks Red Line Gangshan Road Bamboo Line Hu Da-Nangangshan 13.22 6 1.86 The North Machine Factory with approved production capacity has not yet started construction. The main line Nangangshan-Xiaogang 28.3 operates Zhongbei Machinery Factory.
Nanji factory was opened to traffic at the new international airport on 20 12 and 12.
Extension Line Xiaogang-Nanxing Planning Area Planning Terminates New Airport Planning Terminates Forest Garden Line Xiaogang-Forest Garden Industrial Zone 12.2 Room 5 of Donggang Line of Light Rail Forest Garden Airport-Dapeng Bay 10.9 Long-term Planning Xiziwan-Daliao14.443.07, the main line of BRT Orange Line, was completed and opened to traffic in September 2008. High-throughput Pingtung Airport has not yet started the construction of the left camp of Taiwan Railway MRT-Fengshan 15.26 15.26 to build a new left camp of China-Taiwan Railway MRT.
Chaozhou Freight Yard is expected to open to traffic at the end of 20 17.
East Waterfront Joint Hospital of Light Rail Ring-Hamaxing Kaohsiung Port Light Rail Farm 16 Train Yard and the Great Ring Road cross the waterfront new light rail-Hamaxing Kaohsiung Port 8.7-22. 1 Expected to open to traffic in June 20 15. Phase I mainline Ersheng Road-Guangxin Park Phase II mainline Hamaxing Kaohsiung Port-Ersheng Road 13.4 depends on the underground progress of the railway.
Shu-te university 12.78 23. 17, the first-phase main line of Xueyuan Light Rail, was returned to Youchang Machinery Factory, and the second-phase main line, Sham Shui Po-Buddhist Temple 10.39, was returned. The long-term plan depends on the results of the first stage operation. Youchangxian left camp to help China and Hong Kong 6.4 6.4 BRT. Temporarily not in line with economic benefits-Nanjing Ruilong intends to terminate one of the four lines originally planned for light rail-Guangxin Wharf on Brown Line-Bird Pine 10.72 10.72 The feasibility assessment of Bird Pine Maintenance Machinery Factory was not approved-Yellow Line Mengling-Bird Pine14.3 can be. In the feasibility assessment, the long-term planning BRT of Green Line Wu Jiarui Long-Stamina16.1515+05 is not in line with the economic benefits for the time being.
(Aerial Cable Car) The first-phase main line Hama Kaohsiung Port-Qijin -3.05 Planning Aerial Cable Car-the second-phase main line Eighth Five-Year Building-Guangxin Building-the long-term planning depends on the first-phase operation results.