Reasons for the control of Zhuhai Airport from the east of Zhuhai Bridge: due to the need of the construction of the central separation zone between Zhuhai Avenue and Airport Road.
Closing time: 2065438+09 March 17 to the end of April.
Closed area: Zhuhai Bridge east to Zhuhai Airport.
Traffic control measures:
1, every night 1 1 until 6: 00 the next morning, the leftmost lane in both directions of the construction section is closed. It will take several nights during the construction period, and the green belt of Zhuhai Bridge section will be closed for construction, which will not affect daytime travel.
2. The leftmost lane of Zhuhai Bridge closes Zhuhai Avenue and goes to Jinwan Interchange in both directions.
3. Close the leftmost lane from Jinwan Interchange to the airport terminal.
Speed limit: during the construction period, the speed limit of the construction section is 60 km/h.
Section length: The construction section is 30 kilometers long.
Construction mode: In order to minimize the impact of closed construction on traffic, the construction department adopts the mode of morning and evening peak shutdown and flat peak construction.
Tips: friends who go out of town to the airport should try to go out 3 hours in advance.
Bypass route: Take the western coastal expressway to Jintai Temple, then transfer to the airport expressway and go directly to the airport.
Haibin Road (from Fenghuang Road to Jiuzhou Avenue) In addition to Zhuhai Bridge, Haibin Road will also be closed for five months!
Closing time: 2019 March 18 to August 18.
Closed area: Haibin Road (section from Fenghuang Road to Jiuzhou Avenue)
Traffic control measures: every day from 9: 00 to 17: 00 and from 20: 00 to 6: 00 the next day, non-motor vehicle lanes are fully enclosed in four areas at the same time:
Intersection of Kyushu Avenue and Jida Road 1
2. The intersection of Jida Road and Jingshan Road
3. The intersection of Jingshan Road and Hai Xia Road.
4. From the intersection of Hai Xia Road to Fenghuang Road
Construction method: In order to reduce the impact, it is also carried out by means of morning and evening peak shutdown and flat peak construction.
Bypass route: Friends who live in Xiangzhou can choose Couples Road and Jining Road with better road conditions to bypass.
After the reconstruction of Haibin Road is completed, it will be widened from four lanes to six lanes, greatly improving the road capacity of Jida and Xiangzhou.
During the construction period, non-motor vehicle lanes and motor vehicle lanes will be occupied by stages, which will have an impact on the past traffic.
Vehicles passing through the construction section must remember to slow down in advance and make way!
Pay attention to temporary traffic signs and obey the command of traffic police and staff.