1, the construction site is not provided with a hard closed enclosure, or effective dust prevention and dust reduction measures such as covering, subsection operation, timely construction, sprinkling water to suppress dust, washing the ground and vehicles are not taken.
2, construction earthwork, engineering muck, construction waste not cleaned up and transported away in time, or not covered with closed dustproof net.
3. The construction unit fails to cover the bare ground of the construction land that cannot be started temporarily, or fails to afforest, pave or cover the bare ground of the construction land that cannot be started for more than three months.
4. Vehicles transporting coal, garbage, muck, sand and gravel, earthwork, mortar and other granular and fluid materials have not taken sealing or other measures to prevent materials from being scattered.
5, unsealed coal, coal gangue, cinder, fly ash, cement, lime, gypsum, sandstone and other materials that are easy to produce dust.
6. For materials that can't be sealed and are easy to generate dust, a closed enclosure not lower than the stacking height is not set, or effective covering measures are not taken to prevent dust pollution.
7. Failing to take sealing or spraying measures to control dust when loading and unloading materials.
8, docks, mines, landfills and garbage disposal sites did not take effective measures to prevent dust pollution.