Excuse me, do you have a sample tender?

Title: Bidding documents for construction and installation projects

In order to improve the construction speed and economic benefits of the building installation project, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

First, the preparation conditions of the project subject to tender

This project has met the following tender conditions:

1. The project has been included in the national (or ministry, commission, province, city and autonomous region) annual plan;

2. Existing construction drawings and budget estimates issued by design units approved by the state;

3. Construction land has been requisitioned and all obstacles have been removed; Water, electricity, roads and communication conditions for site construction have been implemented;

4. Funds, materials, equipment configuration plans and cooperation supporting conditions have been implemented respectively, which can ensure the supply and enable the proposed project to be continuously constructed within the scheduled construction period;

5. Existing building permits issued by local construction departments;

6. The pre-tender estimate of this project has been submitted to the competent construction department and China Construction Bank for review.

2. Project content, scope, quantity, construction period, geological exploration unit and engineering design unit:

____________________________________________________________________ ____________。

Second, the project can use the site, water, electricity and roads:

____________________________________________________________________ ___________.

Three, engineering quality grade, technical requirements, special requirements for engineering materials and bidders, and engineering acceptance criteria:

____________________________________________________________________ ___________.

Four, the way of project supply, the price of main materials and the way of project price settlement:

____________________________________________________________________ ____________.

5. Time and place for organizing bidders to conduct on-site inspection, explanation and disclosure of bidding documents:

____________________________________________________________________ _____________.

Registration, bidding date and sending method of intransitive verb bidding documents:

Registration date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Bidding period: from _ _ _ _ _ _ _ _.

Sending method of bidding documents:

___________________________________________________________________。

Seven. Time and method of bid opening and evaluation, basis and notice of winning bid:

Time for bid opening: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Time for bid evaluation to end: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Method of bid opening and evaluation: The construction unit invites the competent construction department, China Construction Bank and notary office (or the administrative department for industry and commerce) to participate in the public bid opening, review the certificate, and collectively evaluate the bid evaluation and calibration).

Bid-winning basis and bid-winning notice: The basis for evaluating the bid winner of this project is excellent project quality, suitable construction period, reasonable price tag and good social reputation. The lowest bidder may not win the bid. When the bidding quotations of all bidding enterprises are higher than the pre-tender estimate, if the pre-tender estimate calculation is wrong, it should be adjusted according to the facts; If the pre-tender estimate is correct, the unreasonable part will be eliminated through bid evaluation, and the reasonable bid price and the winning enterprise will be determined. Within five days after the bid evaluation, the tenderee will send the bid-winning notice to the winning bidder by mail (or by special person) and sign a _ _ _ _ _ _ _ _ _ _ contract.

Eight. Others:

____________________________________________________________________ ___________。

The tenderer promises that once this tender document is issued, the contents of the original tender document shall not be changed, otherwise the losses caused to the bidder will be compensated. Bidders shall, in accordance with the requirements of the tender documents, participate in bid preparation and bidding at their own expense, and the tender (that is, the tender letter) shall be filled in the prescribed format with clear handwriting and stamped with the seal of the unit and representative. The tender must be sealed and must not be submitted late. Once the tender is issued, it shall not be withdrawn or changed for any reason.

In case of dispute in the process of bidding, if both parties fail to negotiate on their own, the department in charge of bidding management shall conduct mediation and arbitration. If they are dissatisfied with the arbitration, they may bring a lawsuit to the court.

Owner (i.e. the tenderee): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contact person: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Phone number: _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

"Bidding documents for construction and installation projects" come from the big secretary network, and this site provides free help for all full members to find documents. Welcome to the bidding for building installation.

Title: Model essay on bidding for hospital medical equipment.

Project Name: School Hospital Equipment

Name: X-ray, blood cell counter, automatic biochemical analyzer

ProjectNo.: 2007-WZGYK-02

List of bidding documents

A, the "general principles of Shandong * * University instrument and equipment procurement bidding", the main contents include:

Principles and precautions to be followed in bidding process.

Two, the tender technical documents, including the quantity and requirements.

Shandong * * University Experiment and State-owned Assets Management Office System

2007-0 1-05

General rules for bidding of Shandong University

ProjectNo.: 2007-WZGYK-02

Shandong * * University (the tenderer) conducts limited competitive bidding for relevant professional companies on the equipment of the school hospital. Please read these general rules carefully and provide relevant information as required.

1, project overview

(1), Project Name: School Hospital Project

(2) Project location: Shandong XX University

(3) Project content: X-ray, automatic biochemical analyzer and blood cell counter.

2, the contents of the tender documents

(1), please briefly introduce the basic situation of your company and provide credit certificate.

Copy of the company's business license, organization code certificate and tax registration certificate: if it belongs to a branch, agent or office, the power of attorney of the head office or headquarters must be attached.

B, the strength and reputation of the company, as well as examples of your company's projects in China (preferably in Zibo or domestic universities), including the name of the employing unit, the name of the project, the name of the person in charge, contact telephone number, etc.

C, the above information must be bound into a book, as an annex to the tender, with a table of contents on the cover.

(1), the bidder shall, on the basis of these general terms and conditions, make a detailed overall response to the requirements in the annex (including the single price and total quotation of the system solution and its corresponding specific equipment), and ensure that it is in stock during the bid-winning execution period of this project.

(2) The bidder shall not make any changes to the contents of the schedule of the tender issued by the tenderer. If the bidder has other better constructive suggestions or plans for the content, he can make another plan and quote, and please indicate the characteristics of the proposed plan for the tenderer's reference. However, an oral statement must be made to the tenderer and written materials must be submitted before the bid opening. When experts evaluate bids, the proposed scheme will be treated equally with the original bidding scheme.

(3), after-sales service commitment (including product warranty period, service response time and guarantee measures, contact person, telephone number, etc.). ).

(4) The bidder shall complete the relevant bidding documents according to the requirements in the appendix to the tender letter.

(5) The bidder shall prepare 65,438+0 originals and 3 copies of the bidding documents, and clearly mark them. If there is any discrepancy between the original and the copy of the bidding documents, the original shall prevail. The original and copy of the bidding documents shall be printed on GB/T 148-A4 paper. Charts and other documents can be expanded in multiples of the same specification, and handwriting and arbitrary changes are not allowed unless these changes are made according to the instructions of the tenderer. If it is an error that must be corrected by the bidder, the bidder shall affix the official seal of the legal entity and the seal of the legal representative or entrusted representative.

The bidding documents are in quadruplicate (packed in an envelope), and each page of the schedule must be stamped with the official seal of the bidder, sealed as a whole and submitted jointly. If the bid documents are not sealed and stamped with the official seal according to the above provisions, the tenderer will not be responsible for misplacing or opening the bid documents in advance, and the bid documents opened in advance will be rejected.

(6) After receiving the tender documents, if the bidder needs to clarify or modify any problems, it should submit them to the tenderer in writing at least two days before the deadline for submission of tender documents required by the tender documents. If the tenderer thinks it necessary to clarify, it will give a written reply. The reply will be delivered to all bidders and will become an integral part of the bidding documents. As an integral part of the tender documents, the supplementary notice is equally binding on the tenderer, and the tenderer should take the supplementary notice into account when compiling the tender documents.

3. Timetable:

0 1.05, in 2007, the tender was issued. Please refer to the bidding website: experimental and state-owned assets management office bidding information.

Pay the bid fee and bid bond at the bidding office before 8: 30 am on June 65438+1October 12, 2007, and open the bid at Room 4 14 of Hongyuan Building of Shandong University at 9: 00 am.

Please send someone to the meeting on time. Each bidder is limited to three representatives, and the legal representative of the bidder or the legal representative must attend, otherwise the bid submitted by the bidder will be considered invalid. When opening bids, each bidder is allowed to make oral supplementary statements (or give up) for five to ten minutes. The tenderer shall open the bid at the time and place specified in the tender documents.

4. Related expenses (only for this project)

Bidders are required to pay a bid fee of 100 yuan (non-refundable) and a bid bond of 10000 yuan (the bid bond of unsuccessful bidders will be refunded, the bid winner will be converted into a contract bond, and the equipment will be refunded after winning the bid).

The winning bidder shall pay 0.8% of the total contract price as the bidding service fee when signing the contract.

5. Delivery requirements and payment methods

(1), delivery time: the goods will arrive before March, 2007 10 or be determined through negotiation according to the specific situation of the supplier.

(2) Mode of transportation: The bidder shall be responsible.

(3) The payment method of this project is installment payment. Pay 90% of the total contract amount after acceptance, and the balance will be paid in three months.

6, bid invalid terms:

(1), the tender has not been formally purchased;

(2) The bidder attempts to influence the bidding results and other unfair competition behaviors in the process of bidding and evaluation;

(3), does not meet the overall requirements and the contents of the tender;

(4) changing the contents of the tender documents without the consent of the tenderer;

(5) Failing to submit the bid documents within the prescribed deadline;

(six) the number of people participating in the bidding is not enough to form effective competition;

(7) The bidder provides false certification materials (including credit certificate, performance, product performance, manufacturer, etc.) to the tenderer during the bidding process. ).

7, evaluation principle:

(1). The tenderee promises that the bid evaluation will be conducted by the bid evaluation committee established by the tenderee according to law and by relevant bid evaluation experts, and the bid evaluation will be conducted in strict accordance with the comprehensive bid evaluation principle of "openness, fairness, impartiality, science and merit selection", so as to fully guarantee the legitimate interests of all bidders.

(2) When evaluating bids, based on the principle of combining standardization with flexibility, comprehensively evaluate the bidder's bidding scheme, quality, service commitment, technical strength of the company, social response and other factors, and preliminarily determine the winning bidder. After negotiation, if there is no objection, it shall be submitted to the bidding leading group for approval and publication.

Whether to adopt the second quotation in the bidding quotation shall be determined by the bid evaluation team according to the first quotation.

(3) After the bid evaluation results come out, the tenderee will issue a bid-winning notice to the winning bidder within 5 working days, and formally notify all bidders of the bid-winning results.

(4) After the tenderer formally notifies the winning bidder, both parties will formally sign a contract with the winning bidder at the specified time and place within 5 working days in accordance with the People's Republic of China (PRC) Contract Law and its relevant provisions, as well as the relevant contents in this bidding document and its annexes. In principle, the contract shall be subject to the standard contract provided by the tenderer.

8. Other considerations:

(1), please carefully review the requirements in the bidding documents and fill in the bid price and commitment carefully. If the bidding documents prepared by the bidder cannot respond to and meet the requirements of this tender, the responsibility shall be borne by the bidder, and its bidding documents will be rejected or deemed invalid by the tenderer.

(2) All bidders should carefully read this tender and its annexes, which contain most of the clauses to be written into the contract. Once a bidder formally bids, it is deemed that it has made relevant commitments with legal effect to the tenderer, and it shall not be changed at will unless there are irresistible factors.

(3) For the manufacturers who bid maliciously and cannot guarantee the supply according to the contract requirements after winning the bid, the tenderee reserves the informed criticism, claims, fines, liquidated damages and stops the supply qualification of all their products.

(4) Regardless of the result of winning the bid, the bidder's bid documents will not be returned, and no explanation will be given to the unsuccessful units. Regardless of the bidding result, all expenses incurred by the bidder in the bidding process shall be borne by the bidder.

(5) The quotation sheet includes transportation and miscellaneous fees, loading and unloading fees, etc.

Contact telephone number:

Address:

Office of Experiment and State-owned Assets Management

Bidding Office ()

Account Opening Unit: Shandong University Account Opening Bank:

Account number:

Tenderer (official seal)

2007-0 1-05

1 automatic biochemical analyzer

1. Test speed: 300-400 times/hour.

Second, the independent sampling needle, reagent needle, stirring needle, sampling needle and reagent needle have the functions of automatic washing of internal and external walls, liquid level sensing and automatic safety collision avoidance.

Three, 60 sample positions, can use a variety of test tubes, original test tubes can be used directly on the computer. The reagent tray is refrigerated 24 hours a day, which reduces the consumption of reagents.

Fourth, the reagents are all open.

5. Optimize cross-infection prevention procedures to reduce cross-contamination.

Six, free service for 2 years.

Blood cell counter 1

One or three kinds of ≥ 18 parameters,

Two, double needle, dual channel

Three, peripheral blood, venous blood two modes

Power system: silent peristaltic pump, no noise and no interference.

Five, automatic plugging, automatic perfusion, cleaning.

Quality control methods: X-R XB XD-CV.

Seven, free service for two years.

X ray fluoroscopy 1

1. Line high voltage generator: program-controlled 500A host.

2. Remote diagnosis bed: ZC 15XY- 1

Three. Integrated camera: SC4-4

4. Image intensifier: The image intensifier is 9 inches.

Verb (abbreviation of verb) TV monitor: Built-in 14 inch TV monitor.

Sixth, the rotatable pedal.

Seven, catheter assembly.

Eight, line high voltage cable.

The model paper for inviting bids for hospital medical equipment comes from the big secretary network, and this website helps all full members to find articles for free. Welcome to read the model essay on bidding for hospital medical equipment.

Title: Bidding Document for Bus Station Design

I. Overview of the Project

1, project name: county bus station

2. Owner: Branch of City Automobile Transportation Co., Ltd.

3. Geographical location of the project: southwest corner of the line intersection, expressway intersection.

Second, natural conditions.

L, extreme maximum temperature

2. Extreme minimum temperature

3. Annual average temperature

4. Annual precipitation

5. Maximum wind power over the years

6. Maximum wind speed over the years

7. Fog

Third, the design requirements

1, subject to the Reply on the Feasibility Study Report of County East Bus Station issued by the Municipal Development and Reform Commission.

2. Meet the requirements of the Classification and Construction Standard of Bus Terminal by the Ministry of Communications (JT/T200-2004) and the Design Code for Bus Terminal Construction by the Ministry of Construction and the Ministry of Communications (JGJ60-99).

3. It basically conforms to the planning and design conditions of the construction land for the county East Bus Station of the County Planning Bureau.

4. The design scheme is economical, practical and beautiful. In order to embody people-oriented and facilitate passengers, the main economic and technical indicators should be defined, such as land acquisition area, actual use area of the station, parking area, construction area of the main station building (waiting room, ticket office, layered area) and construction area of auxiliary facilities.

Four. Description of bidding requirements

1, the tenderer must have independent legal person qualification and architectural design grade B (including grade B) or above.

2. Invite the design unit to participate in the scheme design. The design unit that voluntarily accepts the invitation must pay a deposit of 5,000 yuan and go to the site for reconnaissance according to the specified time.

3. The bid winner of this scheme design tender is the preliminary design and construction drawing design unit.

4. In any of the following circumstances, the design scheme is invalid:

(1) does not respond to design bidding;

(2) Failing to arrive at the scene within the specified time;

(3) Late delivery of the design scheme;

(4) The design scheme does not meet the requirements of * * Province's Provisions on the Depth of Preparation of Bidding Documents for Construction Engineering Design;

(5) The scheme design generally does not exceed 5% of the index of the feasibility study report. If special circumstances can be explained, the increase of parking area is not limited.

5. The scheme design documents submitted by the design unit are in seven copies, one of which is the original, including relevant qualification certificates and business licenses (photocopies) for future reference. The original documents shall be stamped with the official seal of the design unit, signed and sealed by the legal person or its authorized person, registered practitioners with corresponding qualifications and the person in charge of specific preparation, sealed separately and marked with the words "original documents" at the seal. The remaining documents are photocopies for bid evaluation, and the photocopies and other materials shall not contain any words or marks that show or imply the design unit.

The design unit shall deliver the above copies and sealed originals to the designated place within the specified time.

6. Place of submission of tender:

Contact person: Tel:

7. On-site reconnaissance time: noon of that year.

Deadline for submission of design scheme: noon on the same day.

Five, the design unit commitment

The design unit shall submit the relevant commitment letter to the construction unit while stipulating the design scheme.

1. Commitment to design progress, depth, design quality and excellent service:

2. Time required for preliminary design and construction drawing design:

3. Design fee quotation refers to all construction projects that can be recognized by workers, including scheme design. The total cost of preliminary design and construction drawing design must be calculated according to national standards, and the discount rate should be put forward according to the design fee quotation, the actual quotation should be calculated, and the relevant additional conditions should be explained.

Evaluation method of intransitive verbs

According to the Detailed Rules for Bidding and Evaluation of County East Bus Station Design.

Seven. Documents to be provided by both parties:

L, invite units to provide basic design information.

(1) Project feasibility study report approved by the Provincial Communications Department:

(2) Planning and design conditions provided by the County Planning Office:

(3) Bidding documents of design scheme.

2 participating design units shall provide the following documents:

(1) According to the depth required by the design specification, provide a complete set of design scheme drawings that can be approved by the engineer, including general layout, traffic network planning, environmental layout and the effect diagram of the main station building.

(2) The scheme design specification and economic and technical analysis data can be approved by the engineer for the design drawings and descriptions of various projects.

3. The specification of the scheme design and manual atlas is A3, 7 sets of * * (including 1 set of original documents) color painting sheets of the main building are al, and * * 1 set is added, and the general plan is added. The plan of each floor of the main building is1sheet, and the sheet is al.

4. The bid price of design fee must be in the form of double envelopes, one envelope is signed at the end and encapsulated in the copy file, and the other envelope is sealed and encapsulated in the original file.

Eight, the main conditions and requirements for signing the planning and design contract

L after the scheme is selected through evaluation, the construction unit signs a design contract with the applicant, and the design fee is given preferential treatment according to the current national standards.

2. No additional fees are charged for the design scheme of the applicant. The unsuccessful bidder will pay RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Nine, the construction unit contact and telephone number

Contact person: Tel:

Attachment:

1,No. of Municipal Development and Reform Commission "Reply on Feasibility Study Report of County East Bus Station"

2, the county planning office "county east bus station construction land planning and design conditions"

3, the county bus east station clan map

County East Station Project Schedule (Work Permit)

Description of project name and investment amount (ten thousand yuan)

I. Building Construction 16000m2 800

1, station building 2863 m2 143.

In which: waiting room1200m2.

2. The administrative room is 540 square meters.

3. Production auxiliary facilities 12337 m2 622

In which: the automobile maintenance workshop is 300 square meters.

Auxiliary workshop 200 square meters

Material room 200 square meters

Car wash platform 100 m2

Vehicle safety test platform 100 m2

Transformer room 30 square meters

Boiler room 100 m2

The doorman reception room is 60 m2.

Other auxiliary facilities 1300 m2

The dormitory building is 9947 square meters

4. Service facilities 260 square meters 5

Among them: motorcycle shed is 200 square meters.

The infirmary is 60 square meters.

Second, the general layout of the project 234

1, the site is filled and leveled with 52000m3 98.

2. Square in front of the station 1500 m2 54 flaky cushion.

The parking area is 23,874 square meters.

4, indoor water and electricity, fire 50

5. Greening 10

6. Fence Gate1200m22

Third, equipment safety, power distribution equipment, etc.

Four. Other 684

1, land acquisition 37227 m2 670.

2. Construction application, design and supervision, etc. 14

Total16000m2 17 18

Detailed rules for bidding and evaluation of bus passenger station design

(Trial)

According to the Bidding Law of People's Republic of China (PRC), the Bid Evaluation Committee and Bid Evaluation Measures of seven ministries and commissions such as the State Planning Commission, the Provisions on the Management of Bidding for Provincial Traffic Construction Projects, the Implementation Rules for the Management of Bidding for Provincial Construction Projects and other relevant regulations, combined with the requirements of the bidding documents of this project, the design bid evaluation rules for the East Bus Station of this county are formulated.

Article 1 A bid evaluation project shall follow the principles of openness, fairness and impartiality. No unit or individual may illegally interfere with or influence the bid evaluation process and results.

Article 2 The bid evaluation of this project subject to tender is to comprehensively evaluate and compare the bidding documents of all bidders according to the bid evaluation method specified in the bidding documents, and put forward bid evaluation opinions such as winning the bid, canceling the bid or re-inviting the bid.

Article 3 The bid opening shall be presided over by the tenderer, and all bidders shall be invited to participate. The bid opening shall be conducted in public at the time specified in the tender documents: the place of bid opening shall be the place specified in the tender documents.

Article 4 The bid evaluation committee established by the tenderer according to law shall be responsible for bid evaluation. The bid evaluation committee consists of representatives of the tenderee and relevant experts, and the number of experts shall not be less than two thirds of the number of the bid evaluation committee. The bid evaluation experts are selected from the expert database of the Provincial Department of Transportation.

Article 5 The bid evaluation committee shall be established within 24 hours before the bid evaluation, and the list of members shall be kept confidential until the bid winning result is determined.

Article 6 When evaluating bids, the tenderee may invite relevant functional departments to participate in the bid evaluation as needed, and the bid evaluation committee shall fully consider the opinions of all functional departments.

Article 7 The score of this project subject to tender is 100%. The main contents and scores of the bid evaluation committee for evaluating and scoring the bid documents are as follows:

Score content score

Response to bid 5

The first envelope of the tender documents:

(1) 80 design documents.

The second envelope of the tender documents:

(2) Design fee 15

Article 8 Scoring criteria for the first envelope of bid documents

Each member of the Bid Evaluation Committee will grade each scheme design separately. The design score of each scheme is the arithmetic average of each member of the bid evaluation committee after deducting a highest score and a lowest score from the design score of the scheme.

Evaluate sub-item score value

Main building facade modeling 40

Plane function 15

General layout 15

Design Description and Cost Estimation 5

Auxiliary room 5

Article 9 The quotation score is based on the lowest quotation, and the specific calculation method is as follows:

(1) The lowest quotation score of the bidder is the highest score:

(2) Quotation score of other bidders = 15× lowest quotation/quotation.

Article 10 The bid evaluation committee shall conduct independent evaluation in accordance with the detailed rules for bid evaluation. The bid evaluation committee shall comprehensively evaluate the bidders, comprehensively calculate the scores and rank them.

Article 11 If the bid evaluation committee considers that all bidding schemes do not meet the requirements of bidding, it may reject all bids and invite new bids.

Twelfth after the completion of the bid evaluation, the tenderer shall determine the winning candidate according to the evaluation results of the bid evaluation committee.

Thirteenth members of the bid evaluation committee shall perform their duties objectively and fairly, abide by professional ethics, and take personal responsibility for the bid evaluation opinions put forward. Members of the bid evaluation committee shall not contact bidders privately, accept property or other benefits from bidders, and shall not disclose the evaluation of bid documents, the recommendation of successful candidates and other information related to bid evaluation. In order to ensure the fairness of bid evaluation, bid evaluation members are not allowed to carry any communication tools during bid evaluation.

Article 14 If the candidate winning the bid ranked first in comprehensive evaluation gives up the bid and cannot perform the contract due to force majeure, the tenderer may determine the candidate winning the bid ranked second as the winning bidder. If there is no next successful candidate who meets the requirements of bid evaluation, the tenderer shall re-tender.

Fifteenth unsuccessful bids shall be given certain economic compensation in accordance with the provisions of the tender documents, and the bidding scheme confirmed by the bid evaluation committee as invalid shall not be compensated.

Planning and design conditions of county east bus station

Common sense book

City Automobile Transportation Co., Ltd. Branch:

Through research, it is agreed that the construction project of the county bus east station declared by your company is planned and designed at the southwest corner of the intersection of provincial roads S306 and S305 in expressway, Zhang Chang (the original site of groups 7, 8 and 9 of Wanfu Village) according to the following planning conditions.

First, the design basis:

1, the overall planning of the county

2, county urban planning administrative technical regulations

3. Code for Architectural Design of Bus Terminal (JGJ60-99)

Second, land use:

1. Scope of planned construction land.

County East Bus Station is located at the intersection of provincial highways S306 and S305.

The southwest corner of the meeting place is at the intersection of Zhang Chang Expressway (the location of groups 7, 8 and 9 of Wanfu Village).

2, road planning width:

3. Other planning points:

Planning and layout should have clear functional zoning, reasonable traffic organization, perfect functions and advanced facilities, and meet the requirements of long-term development and utilization and future expansion.

The total planned land area is 37,227 square meters.

Third, the ground control index:

Floor area ratio:

Building density:

Greening rate:

Four, architectural design requirements:

Verb (abbreviation for verb) municipal requirements:

1, configure garbage collection facilities as required;

2. All entrances and exits of bus stations must be clearly marked;

3. The layout of the municipal pipe network within the scope of land use shall be connected with the urban pipe network.

Six, the planning of building layout should meet the requirements of fire protection.

Seven. Matters to be followed:

1. The planning and design conditions listed in this notice are the basis for our bureau to approve the planning and design;

2. Before applying for the design scheme of this project, the opinions of the competent departments of fire control and transportation must be solicited.

3. The general layout of the bus station made in accordance with the notice of planning and design conditions must be reported to our bureau for approval;

4. The power corridors, water supply trunk lines, drainage ditches and communication trunk lines within the planned land area of this project shall reach relevant agreements with the competent authorities;

5. This notice is valid for one month, and it will be invalid after expiration.

The bidding documents for bus station design come from the big secretary network. This website helps all full members to find articles for free. Welcome to the tender for bus station design.