Three celebrities of engineering cost

Three outstanding project cost: Yin Yilin, Ding and He Qinghua.

1, Yin Yilin

Yin Yilin is a well-known expert in the field of engineering cost. He is the founder of the Institute of Public Projects and Engineering Cost (IPPCE) of Tianjin University of Technology and the Cost Engineer Training Center (TCCCE) of Tianjin University. He is the vice chairman and executive director of China Construction Engineering Cost Management Association (CECA) and the chairman of the National Engineering Cost Education Expert Committee (Ministry of Construction). His contributions include promoting the project cost management of Tianjin Olympic Games and promoting the development of the project cost industry in China.

2. Ding Zhaoshi

Ding Tongji University, director of the Institute of Engineering Management, mainly engaged in construction economy, construction project planning and project management research. He graduated from the Department of Architecture and Engineering of Tongji University with a master's degree from the School of Engineering Management of Tongji University. Ding has rich experience and solid academic foundation in the field of architectural engineering, and has accumulated rich practical experience and scientific research achievements in guiding master students and doctoral students.

3. He Qinghua

He Qinghua is a professor and doctoral supervisor in the Department of Building Management and Real Estate, School of Economics and Management, Tongji University, vice president of the Institute of Complex Engineering Management and director of the Lean Architecture Research Center. He has long been engaged in teaching, scientific research and consulting practice in the field of construction engineering management. His research fields include the development and reform of the construction industry, major and complex project management, lean construction, integrated project delivery and whole-process engineering consulting.

Basic characteristics of project cost

1, large amount

In order to exert the investment effect of the project, the project cost is very expensive.

2. Personality and differences

Any project has a specific purpose, function and scale. Therefore, the structure, modeling, space division, equipment configuration and interior and exterior decoration of each project have specific requirements, so the content and physical form of the project are individual and different. The difference of products determines the individual difference of project cost. At the same time, the geographical location of each project is also different, which strengthens this feature.

3. Dynamic

The construction period of any project is very long from decision-making to completion and delivery. During the construction period, due to the influence of uncontrollable factors, there are often many dynamic factors that affect the project cost. Such as design changes, adjustment of materials and equipment prices, adjustment of wage standards and charging rates, changes in loan interest rates and exchange rates, will inevitably affect the changes in project cost. Therefore, the project cost is in an uncertain state during the whole construction period, and the actual project cost can not be finally determined until the final accounts are completed.