Tender Announcement 20 15 of Yanwu expressway Maintenance Highway Project

20 15 maintenance project construction bidding of Shaanxi expressway construction group company.

Release date: 2014-11-04 receipt.

20 15 maintenance project construction bidding of Shaanxi expressway construction group company.

1. Bidding conditions

The reconstruction and expansion project of Huxian toll station in expressway in the Western Han Dynasty, the pavement maintenance project of Xiyu, Tongyan, Hanning and Xibao, the monitoring project of expressway road network in the west, the bridge reinforcement and tunnel ventilation reconstruction project have been included in the 20 15 annual maintenance investment plan of Shaanxi expressway Construction Group Company, and the project owner is Shaanxi Gaobao.

Expressway Construction Group Corporation. The project is funded by toll revenue, and the tenderer is Shaanxi expressway Construction Group Company. The project has met the bidding conditions and is now open for bidding. Interested potential bidders (hereinafter referred to as applicants) are invited to apply for prequalification.

2. Project overview and bidding scope

2. 1 Reconstruction and expansion project of Huxian Toll Station of Xihan Expressway: the existing toll lane remains unchanged. On this basis, four lanes (including 1 ultra-wide lane) were added at the north entrance and five lanes (including 1 ultra-wide lane) were added at the south exit, so that the total number of toll lanes reached 15. At the same time, increase the corresponding supporting facilities and project investment.

The estimated capital is 65 million yuan.

2.2 Xiyu Pavement Maintenance Project: The main scheme is to add 4cm rubber asphalt concrete after milling and planing pavement diseases, and the project investment is estimated to be 70 million yuan.

2.3 Maintenance project of copper pavement: The main scheme is that the damaged bridge deck in Huangyan section adopts milling and resurfacing asphalt surface, and the damaged bridge deck in Huang Tong section adopts milling and resurfacing cement concrete bridge deck; The rutting section of Huangyan section is adjusted by ultra-thin wear layer; The rest subgrade sections with damaged pits and grooves are milled and planed, and resurfaced with 4cm rubber asphalt to make them solidify.

Soil scheme, the project investment is estimated to be 70 million yuan.

2.4 Pavement maintenance project in Western Han Dynasty: The main scheme is milling and resurfacing the damaged bridge deck with asphalt concrete surface; Paving ultra-thin wear layer on rutted road section; Milling and resurfacing 4cm rubber asphalt concrete on the damaged road section, the project investment is estimated to be 50 million yuan.

2.5 Hanning Pavement Maintenance Project: The main scheme is bridge deck pavement and damaged tunnel pavement resurfacing, and micro-surfacing is added after milling and planing the damaged sections. The project investment is estimated to be 40 million yuan.

2.6 Xibao Pavement Maintenance Project: For the large and medium-sized pavement maintenance projects in Xixing Section and Caibao Section, the main scheme is to treat the potholes and subsidence sections of the pavement (overhaul the sections with serious local diseases and insufficient deflection), and then pave 4cm rubber asphalt concrete, milling and planing the damaged deck of Weihe Bridge, and repaving the cement.

For concrete bridge deck, the project investment is estimated to be 50 million yuan.

2.7 Xiyan expressway Road Network Monitoring Project: Implement the comprehensive monitoring system of the road network in Tongyan section of Xiyan expressway, with an estimated project investment of 40 million yuan;

2.8 Bridge reinforcement project: Three types of bridges, such as Hanning and Xibao, are reinforced, and the project investment is estimated to be 40 million yuan.

2.9 Hanzhong Middle East Toll Station Reconstruction and Extension Phase II Project: The estimated project investment is12 million yuan.

2. 10 generator standby power supply project of expressway tunnel in the west extension (XYDY-20 14): new standby power generator sets 16 units are added to the long tunnel in Huangyan, expressway in the west extension, and relevant generator rooms and cables are improved. The estimated investment of the project is about100000.

3. Qualification requirements of the applicant

3. 1 This prequalification requires the applicant to meet the following requirements in terms of quality and performance, and have corresponding construction capabilities in terms of personnel, equipment and financial capacity.

engineering

Category group bidding part

Division of capital requirements and performance requirements

Pavement grade: LMYH-20 15-XY of Guanzhong Formation in northern Shaanxi.

LMYH-20 15-TY requires that the bidder must have the Grade II and Grade A qualification of highway maintenance project issued by the provincial competent department. Hold a valid safety production license issued by the provincial and above construction departments. Since 2009, major and medium repair projects or new asphalt pavements have been completed.

100000 m2/ 100km and above.

Guanzhong Shannan Formation LMYH-20 15-XB

LMYH-20 15-XH

LMYH-20 15-HN

Bridge reinforcement group XBJG-20 15,

HNJG-20 15 requires that the bidder must have the first-class qualification of highway maintenance engineering issued by the provincial competent department or the special professional engineering contracting qualification issued by the provincial and above construction competent departments. Hold a valid safety production license issued by the provincial and above construction departments. 2009

Since, the accumulated contract amount of bridge reinforcement and maintenance works in expressway has reached 30 million yuan and above.

TJ-20 15, the Civil Engineering Group of Civil Engineering Toll Station, requires that the bidder must have the first-class qualification of general contracting of highway engineering issued by the construction department or the second-class qualification of highway maintenance engineering issued by the provincial department. Hold a valid safety production license issued by the provincial and above construction departments.

Quality. Since 2009, there have been two or more 50 km (single) reconstruction and expansion projects in expressway or expressway toll station.

Housing construction toll station FJ-HX-20 15

FJ-HZD-20 15 must have the qualification of Grade II or above for general contracting of housing construction projects and Grade II or above for specialized contracting of steel structure projects issued by provincial and above construction authorities. Hold a valid safety production license issued by the provincial and above construction departments. Since 2009, to

I have undertaken two or more steel structure greenhouses, and have completed the construction experience of houses and steel structure projects with an area of more than 20000m2.

Electromechanical toll station road network group JD-SFZ-20 15

JD-LW-20 15 must have the Engineering Data of Highway Traffic Engineering Contracting Communication, Monitoring and Charging Integrated System issued by the provincial and above construction authorities. Since 2009, it has undertaken at least 50 million yuan or more electromechanical system construction or renovation projects in expressway.

Since 2009, tunnel electromechanical group XYDY-20 14 has undertaken at least 30 million yuan of electromechanical system construction or renovation projects in expressway Tunnel.

3.2 This prequalification does not accept the prequalification application of the consortium.

3.3 Each applicant applies for prequalification in groups.

3.4 The number of applicants who have passed the prequalification in the same group shall not exceed the number of blocks in the same group of affiliated enterprises, parent-subsidiary companies with direct management and managed relationship, subsidiaries of the same parent company, or two or more legal persons with the same legal representative.

Minimum required categories for passing the qualification examination (series)

The road surface is similar to Guanzhong Formation 30 in northern Shaanxi.

Guanzhong Shannan Formation 45

Bridge reinforcement group 30

Civil Engineering Toll Station Civil Engineering Group 15

Fangjian toll gate fangjian 40 team

Electromechanical toll station road network group 40

Tunnel electromechanical group 20

3.5 The number of applicants who have passed the prequalification in each group shall meet the requirements in the table below. If the number of applicants who purchase prequalification documents is less than the minimum requirements, the tenderer will extend the sales time of prequalification documents or conduct prequalification again, reserve the application qualification of applicants who have purchased prequalification documents and inform them of the extension.

Submit the pre-qualification application documents and re-issue the pre-qualification extension notice; If the number of applicants who submit the application documents for prequalification is less than the minimum requirements, the tenderee will conduct prequalification again.

4. Pre-qualification method

This prequalification is reviewed by the limited method according to the group.

5. Acquisition of prequalification documents

5. 1 Applicants are invited to work from 9: 00 a.m. to165438+105, 20165438+100/(public holidays)

Original, letter of introduction from the unit, ID card of the agent and a copy of the above information, and purchase a set of pre-qualification documents. Applicants who participate in multiple groups of prequalification must purchase the prequalification documents of the corresponding groups and submit the prequalification application documents of each group respectively.

5.2 The price of each set of prequalification documents is 65,438+0,000 yuan, which is non-refundable after sale.

6. Submission of prequalification application documents

6. 1 The deadline for submitting the prequalification application documents (the application deadline, the same below) is 10/9, 20 14 16: 00, and the applicant should arrive at 15: 00 on the same day.

6.2 The tenderee will not accept the pre-qualification application documents delivered late or not delivered to the designated place.

6.3 When submitting the prequalification application documents, the applicant shall submit a bid bond of 300,000 yuan for pavement and 200,000 yuan for other types.

Bidders must register as members and obtain the key before bidding online. Please consult the relevant person in charge for details.

Contact information for network access:

Contact: Wang,.

Mobile phone: 1333 1097873

Tel: 010-52041342/52041343.

Chuan Zhen: 0 10-5204 1343

Mailbox: