Informatization of labor cost management?

The informatization of labor cost management is becoming more and more popular, and management is becoming more and more convenient with the progress of the times. The actual efficiency of handling things is improved, and the handling of every detail is very important. Zhong Da Consulting will introduce you to the informationization in labor cost management.

Construction project cost management requires that the construction plan and management measures be taken as the basis, the quantity and material analysis be carried out according to the management level, consumption quota and operation efficiency of the enterprise, and the construction budget be compiled according to the market price information. When the construction conditions of some links or partial projects are not clear, the estimated cost can be calculated according to the construction experience of similar projects or the calculation basis provided by the bidding documents. In the process of construction project, we should make a good construction procurement plan according to the control requirements of planned target cost, and effectively control the actual cost through the allocation, rational use and dynamic management of production factors. Information management in quality control is mainly reflected in the following aspects:

1. Establish a collection and consultation network for market price information of means of production, and at the same time establish a supplier directory database of enterprises. By collecting information extensively, the timeliness and accuracy of purchasing price information can be guaranteed, which will provide support for the preparation of construction cost plans and procurement work.

2. According to the national construction quota and similar construction projects, determine the composition of labor cost, material cost, shift cost, other direct cost and indirect cost of the project, establish the internal construction quota of the enterprise, and provide the basis for the construction cost plan and construction progress plan.

3, according to the construction progress plan, prepare the construction cost control work plan, according to the construction progress, do a good job in the procurement plan of construction materials, optimize the allocation of production factors, determine the appropriate use scheme of construction machinery and equipment, improve the utilization rate of machinery, and reduce the inventory cost and transportation cost of materials.

4. Strengthen the engineering cost accounting in the construction process. Informatization can improve the efficiency and accuracy of cost accounting. Through the computer, the factors affecting cost saving are analyzed by comparison method, and the cost analysis report is generated, which provides the basis for the correction and prevention of cost deviation and the improvement of cost control methods.