The subjects of the morning exam for the intermediate information system supervisor of the soft exam are basic knowledge, and the exam time is arranged at 9:00- 1 1:30 in the morning. The knowledge points of the information system supervisor basic knowledge subject examination are as follows:
1, technical knowledge of information system engineering;
1. 1 information system construction;
The concept, function, type and development of information system;
Complexity of information system construction;
Life cycle of information system;
Principles of information system construction;
Information system development method;
1.2 computer technology knowledge and network knowledge;
The function, composition and relationship of computer system;
Computer system and information management, data processing, aided design, automatic control, scientific calculation, artificial function and other concepts.
Basic knowledge of data communication;
Network architecture and protocols;
Computer network classification;
Internet practical technology;
Network standards and typical network equipment;
Network planning and design;
Configuration and performance evaluation of common computer network engineering systems;
1.3 information network system;
The framework of information network basic platform, service platform, security platform, management platform and environmental platform;
Network transmission technology, switching technology, access technology, routing technology, operating system, network server, network testing, data storage and backup;
Video on demand, audio on demand, video conference and VoIP; ;
Firewall technology, digital encryption technology, intrusion detection and vulnerability scanning technology, physical isolation, access restriction, security architecture and VPN;;
Network management software and network monitoring software;
Computer room engineering, integrated wiring system, concealed engineering;
1.4 software and software engineering knowledge;
Analysis and definition of software requirements;
Software architecture design method;
Software architecture analysis and evaluation;
Software quality assurance and quality evaluation;
Software configuration management;
Software testing and main tools;
Basic knowledge of software component technology;
Object-oriented analysis and design;
Basic knowledge of software development tools;
Software review;
Software maintenance;
Software development documents and types;
2. Information system engineering supervision knowledge;
The position and function of project management in the implementation of information system engineering;
The basic content of management elements of information system engineering;
The role and main tasks of the three parties involved in the project (owner, contractor and supervisor) in project management;
3. Knowledge of information engineering project management;
3. 1 concept of information system engineering supervision;
The concept of information system engineering;
Basic problems in the development of information system engineering and their causes;
The establishment of computer information system integration qualification management and the origin of project manager system;
The concept of information system engineering supervision;
The characteristics, scope, contents and procedures of information system engineering supervision;
Qualification management of information system engineering supervision units and supervisors;
Supervisors and their rights and obligations;
3.2 Information system engineering supervision basis;
The basic contents of relevant policies, laws, regulations, standards and norms;
The main contents of construction contract and supervision contract of information system engineering project;
3.3 Organization and construction of supervision unit;
System construction of supervision unit (business system, quality assurance system, organization system);
Risk categories and prevention methods of supervision units;
3.4 Organization and planning of supervision work;
The significance, basis and basic procedure of compiling three key documents of supervision work (supervision outline, supervision plan and supervision implementation rules);
The organizational structure of the supervision project department and the post responsibilities of the supervisors;
The main contents of the supervision outline;
The main contents of supervision planning;
The main contents of the detailed rules for the supervision and implementation;
3.5 quality control;
The concept of information system engineering quality and the significance of quality control;
Factors affecting the quality of information system engineering;
The concept of collaborative quality control and the roles of owners, contractors and supervisors in collaborative quality control;
The meaning, function and setting principle of quality control points;
Key points and methods of quality control in project bidding and preparation stage;
Key points and methods of quality control in engineering design stage;
Key points and methods of quality control in project implementation stage;
Key points and methods of quality control of project acceptance;
3.6 schedule control;
The concept and general steps of schedule control;
The goal and scope of schedule control of information system engineering;
Main factors affecting the progress;
Tasks in each stage of schedule control;
Advantages and disadvantages, functions and functions of three technical means of schedule control (icon method, network diagram planning method and banana curve method);
Basic procedures and main measures for schedule control;
The main contents of supervision in each stage of schedule control plan management;
3.7 investment control;
Basic knowledge and methods of information system investment control;
Information system engineering resource planning and cost estimation;
The concept of cost and cost management, and the reason why the project cost is out of control;
Composition of information system engineering construction project cost;
The main factors affecting the project cost;
Basic measures for cost control of information system engineering;
Types, characteristics and existing problems of cost control project budget, methods (tools) of project cost estimation, and methods of budget audit;
The concept of information system engineering measurement, the method of project price settlement and payment control, and the process of project payment;
The concept and significance of information system project cost settlement, the structure of project completion settlement report and the content of project completion settlement audit;
3.8 change control;
The concept of engineering change;
Main factors affecting engineering changes;
The impact of engineering changes on the project;
Basic principles of engineering change control;
Working procedures of change control;
Establish the principle of demand change and the management control procedure of demand change;
Establish the principle of schedule change and the management control procedure of schedule change;
Establish the principle of cost change and the management control procedure of cost change;
Establish the principle of contract change and the management control procedure of contract change;
3.9 Contract management;
The concept of contract;
Classification, main contents and characteristics of information system engineering contracts;
The function, principle and content of information system engineering contract management;
The concept, causes and mediation methods of contract disputes;
The concept, causes and treatment of breach of contract;
The concept, causes and treatment of contract claim;
Intellectual property protection in contract management;
3. 10 safety management;
The concept and characteristics of information system security;
Relevant policies, regulations, standards and norms of information system security management;
The main contents of the information system security management system;
The main contents of the safety management system;
Key points of logical access security management and supervision measures;
Key points of implementing environmental safety management and supervision measures;
Key points of physical environment safety management and supervision measures;
Key points and supervision measures of data backup and disaster recovery management;
3. 1 1 information management;
The concept of information management in information system engineering;
Information classification in information system engineering;
Management of supervision documents;
Contents, functions and filling methods of supervision documents (logs, weekly reports, monthly reports, special reports, summary reports, etc.). );
3. 12 communication and coordination;
General principles that should be mastered in communication and cooperation;
Working methods of communication and collaboration;
Main work contents of communication and coordination in each stage of the project;
3. 13 professional ethics requirements for information system supervisors;
The professional characteristics and post responsibilities of the information system supervisor;
The code of conduct and professional ethics requirements of the information system supervisor;
4. Professional English;
Read and understand English materials in related fields correctly.
Tips: Due to the constant change and adjustment of examination policies and contents, the above information provided by Hunting Examination Network is for reference only. If you have any objection, please refer to the contents published by the authoritative department!
The following free review materials are introduced: 20 18 morning summary of real questions of database system engineers in the first half of the year.
Format: PDF size: 366.33KB 2023 Software designers' knowledge collection for preparing for exams.
Format: DO size: 1 1864.6438+09KB
If you have questions about the qualification examination, don't know how to summarize the contents of the test center, and don't know the local registration policy, click on the bottom to consult the hunting test network and get the review materials for free.