Staggered joints are divided into transverse staggered joints and longitudinal staggered joints. Grinding is generally a transverse staggered position. Transverse width, left picture and right picture, when paving asphalt pavement, the overlapping position of the upper and lower layers should be staggered by more than 200mm, that is, when paving, the upper and lower layers of the left picture and the right picture cannot be staggered in one position; For example, if the road width is 30m, the width of the bottom bunk can be set to 14.9m on the left and15.1m on the right. When paving the upper floor, the width of the left picture can be set to 15. 1m, and the width of the right picture can be set to 14.9m, so that the transverse staggered joint is 20cm. The hot joint is continuously paved, and the residual temperature of asphalt has not subsided. If it is paved the next day and the asphalt has been rolled and cooled, it will become a cold joint.
Want to know more about Jianyi, I recommend you to consult Luyou Education. The teaching and research lecturers of Luyou Education constantly study the examination rules, encourage and discuss each other, promote teaching with solid teaching and research, and escort students by holding teaching seminars. If teaching quality is a branch, then teaching service is a green leaf. The two are inseparable, and * * * nourishes the "prosperity" of teaching.