Construction site planning
1. Investigate the present situation of soil environment in the area where the construction site is located, and put forward the countermeasures for site planning and utilization to prevent soil erosion and degradation; The site occupied by construction should first consider the utilization of wasteland, inferior land and waste land.
2. The general layout of the construction site should be compact, so as to save the floor space of the construction site and limit the interference range of the construction site.
Environmental protection in construction site
1. The waste soil excavated during stacking construction should avoid loss, cover the ground that can be planted, and should be backfilled to achieve the balance of earthwork excavation and filling; When conditions permit, the allocation of earthwork resources between adjacent construction sites should be considered. Good topsoil cultivated soil on the construction site should be collected and utilized.
2. Take effective measures to prevent soil erosion caused by surface runoff or weathering (such as protecting topsoil, stabilizing slopes, vegetation coverage, etc.). ).
3. The treatment of non-renewable construction waste should meet the requirements of national and Beijing laws and regulations to prevent pollution to soil and groundwater.
4, the storage of dangerous goods and chemicals, as well as hazardous waste dumps and solid waste landfills, must have strict water-resisting layer design, and do a good job in collecting and treating leakage to prevent pollution to soil and groundwater.
Protection of ancient and famous trees and cultural relics
1. For ancient and famous trees and cultural relics that cannot be moved or avoided in the site, the relevant national and Beijing protection standards should be strictly implemented. The protection planning of the garden department should be strictly implemented, and protected areas should be delineated to ensure that ancient and famous trees and cultural relics are not damaged by construction activities.
2. Once cultural relics are found in the construction process, the construction shall be stopped immediately, and the site shall be protected and notified to the cultural relics department; The construction unit shall actively cooperate with the work of the cultural relics department, provide necessary human, material or financial support, and assist in the rescue and excavation of cultural relics on site.
Greening and beautifying the construction site
1. If vegetation is destroyed and land is exposed due to construction, fast-growing grass seeds should be covered or planted during construction to reduce soil erosion, and the original vegetation must be restored or afforested reasonably after construction.
2, around the construction site, conditional circumstances should be necessary greening, improve the construction site environment.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.