Who can give a reference to the template of home improvement contract?

Employer: ID number: (hereinafter referred to as Party A)

Contractor: person in charge of the contractor: ID number: (hereinafter referred to as Party B)

I. Contents of the Agreement:

Party A entrusts Party B to design and construct the interior decoration that Party A needs to decorate.

2. Party B shall carry out the construction according to the decoration plan confirmed by Party A in writing (the design plan includes floor plan, hydropower plan, construction layout plan, accessories construction requirements, construction process flow chart, etc.). ).

Three. Rights and obligations of Party A

(I) Rights of Party A

1. Where the design intent of Party A is not met, Party A has the right to request rework;

2. Party A has the right to demand compensation from Party B and terminate the contract for the major quality problems arising during Party B's renovation. ..

Four. Rights and obligations of Party B

(I) Rights of Party B

1. Party B has the right to receive labor remuneration on time, and Party A shall pay the decoration fee according to the payment method agreed in this contract.

(II) Obligations of Party B

1. Party B shall carry out safe and civilized construction. In case of violation, Party B shall bear the penalty, which has nothing to do with Party A; Party B's construction personnel must pay attention to safety, and all work-related accidents during the construction period have nothing to do with Party A, and the responsibilities shall be borne by Party B.: In case of fire accident, material damage and finished product damage caused by Party B, Party B shall be responsible for compensating the corresponding losses.

2. Party B shall assist Party A in keeping all kinds of articles on the construction site from the date when Party A delivers them to Party B, otherwise, Party B shall be responsible for the material loss and construction delay.

3. Carry out the construction in strict accordance with Party A's requirements, and Party B has the obligation to provide Party A with constructive suggestions for reference based on its rich experience until Party A is satisfied;

4. Cherish Party A's raw materials and be careful. In case of waste or shortage of raw materials due to intentional or technical reasons, Party B shall be responsible for compensation;

5. Careful construction, serious and responsible, to create high-quality projects, quality requirements:

(1) When laying all inclined tiles facing the outside of the wall, they should be chamfered at a 45-degree angle. The chamfering process includes: machine cutting (it is not allowed to bump the tiles to cause uneven surface) and manual grinding (the chamfering edge is thinned with sandpaper).

(2) After the floor tiles and wall tiles are laid, there shall be no uneven joints, uneven surface texture, anti-flower, knock against, uneven parting, etc. After the tiles are laid, there shall be no uneven ground and water.

(ici on the wall, there should be no uneven, including brush marks, scratches and unsmooth phenomenon.

(4) The process ceiling shall be free of uneven joints, corners and nail holes.

Specific quality requirements refer to the construction quality of Party B in xx store; The construction quality shall meet the design requirements and national standards, otherwise Party A has the right to require Party B to rework, and all expenses arising from rework shall be borne by Party B; If materials are damaged due to improper construction during construction, Party B shall be responsible for the original price compensation.

Verb (abbreviation of verb) Project content and contract amount:

(1) The project content and unit price are calculated according to the decoration project budget and actual project confirmed by both parties;

(2) Contract budget amount:

The renovation budget of this agreement is RMB (in words).

The renovation budget of this agreement is RMB (in figures).

(In order to prevent Party B from deliberately concealing some items that must be implemented in the design process and then requesting to increase them in the construction process, Party B must abide by the contracts: IV, (II) and III in the decoration design, and make suggestions to Party A in time, which will be recognized by Party B.. ) Requirements: The total amount of final decoration shall not exceed 65,438+00% of the budgeted amount. If negotiation fails, Party B shall take full responsibility.

Installment payment of intransitive verbs:

Down payment: Party A pays 5% of the project budget cost to the contractor (Party B) in advance, that is, the construction drawing is prepared.

Phase II: Party A shall pay 30% of the budgeted amount to Party B within ten days after Party B's electrician and hydraulic materials enter the site to start construction.

Stage III: Within ten days after the woodworking materials enter the site, Party A shall pay 25% of the budgeted amount to Party B..

Stage IV: Acceptance shall be conducted within 20 days after the completion of the project. After passing the acceptance, Party A shall pay 35% of the budgeted amount to Party B..