Responsibilities of directors' representatives
A, presided over the supervision of daily work, earnestly implement the supervision contract. Be pragmatic, efficient and honest, and be a qualified supervision engineer.
Second, the implementation of supervision service contract, the implementation of the owner's indicators. Implement the construction contract and implement the construction supervision and management.
Third, do a good job in supervision of construction procedures and control project quality. Do a good job in site construction management and carry out standardized construction control.
Fourth, adjust the construction plan and control the progress of the project. Do a good job in measuring and paying visas and control the project cost.
Five, adhere to the inspection standards, establish a scientific management image. Adhere to the principle of quality first and establish a high-quality engineering image.
Supervision code
(1) Strict supervision, enthusiastic service, fairness and meticulous.
(2) learn technology, be familiar with business, master standards and improve quality.
(3) Strengthen management, establish rules and regulations, clarify responsibilities and carry out their duties.
(4) On-site inspection, standing by, strict order change and quality assurance.
(5) Perform official duties modestly, respect rules and regulations and discipline, obey the leadership and obey the command.
(6) Go deep into the field, work hard, be scientific and efficient, and keep innovating.
Supervision work policy
One is as follows:
We should always adhere to the principle of "strict supervision, enthusiastic service, fairness and meticulous".
Two persistences:
Strict testing, adhere to data standards.
Strict engineering sequence, adhere to the engineering quality standards.
Three processes:
The construction site must be inspected in all directions.
The whole process of construction work must be carried out.
All aspects of building engineering must be inspected.
Four hundred percent:
Look on all concealed works 100%.
Key engineering components 100% are on site.
Be 100% on standby for key construction procedures.
Important construction technology 100% on site.
Supervisory conference system
1. Supervise the internal meeting 1, hold a staff meeting once a month, report the work of last month, summarize, check, compare, reward and punish and implement the work of subordinates next month. 2. Hold a resident meeting every ten days, conduct self-inspection on the job site within ten days, find out the work quality gap, and analyze and discuss the improvement. 3. Temporary supervision meeting shall be held at any time. According to random situations, hold temporary executive meetings, issue orders, upload information, exchange experiences and ensure quality. Second, the site meeting 1, the director's office meeting once a month, check and summarize, and arrange the deployment. 2. The resident office meets once every two months to study and arrange the venue. 3, temporary meeting should be held at random, to study the problem to ensure the progress of the project.
Job responsibilities of on-site supervision engineer
A, familiar with drawing learning technology, improve the quality of supervision. Adhere to principles, master standards, and scientifically test and evaluate. Two, the implementation of the three to five procedures, not before the start of the implementation of five. Five strictness shall be carried out during construction and five integrity shall be carried out after completion. Third, conduct a comprehensive inspection of the site and stand by and watch the key points in the whole process. The whole process of inspection, comprehensive control of engineering quality. Four, after the implementation of superior instructions, the following opinions timely feedback. Master the standards, strictly supervise and carry out civilized construction in safety production. Five, honest and law-abiding, establish a good image of supervision. Adhere to standards, ensure quality, and establish a high-quality engineering image.
Responsibilities of contract and internal supervision engineer
First, be familiar with the contract documents carefully and implement the contract terms. Strengthen the scientific management of contracts and ensure their earnest implementation.
Second, coordinate the progress of the project and strengthen the management of engineering changes. Do a good job of monthly ten-day plan statistics to ensure the accuracy of all kinds of data.
Third, carefully check the engineering survey and correctly identify the measurement data. Ensure the accurate payment of expenses and control the project expenses.
Fourth, strengthen the management of indoor work to ensure that the information is true and accurate. In-depth on-site inspection every month to ensure that the information is complete.
Five, do a good job in information management, and seriously deal with correspondence. Ensure that the records are clear and complete, and do a good job of data archiving.
Job responsibilities of test supervision engineer
First, the number of inspection items is complete, and the inspection standard operation specification. Ensure that the data is true and complete, and require clear and strict procedures.
The second is to review the guidance of supervision and inspection to ensure the perfection of on-site testing. Personnel in place, complete equipment, to ensure the normal operation of the test.
Third, strict material inspection and strict quality control of raw materials. Adhere to the sampling frequency and quantity, and randomly control the engineering quality.
Four, unified examination form, clear requirements and standards. Timely filing ensures integrity and serves the quality of construction monitoring.
Five, the test data is true, and the scientific evaluation basis is sufficient. Strict process inspection, quality control and quality assurance.
4. Responsibilities of supervisory bodies at all levels
4. 1 Responsibilities of Contract Management Department
4. 1. 1 Check the implementation of the construction contract.
4. 1. 1. 1 Check whether the personnel and main equipment entering the site are consistent with the tender.
4. 1. 1.2 Put an end to subcontracting and ensure some subcontracting.
4. 1.2 Check the quantities, make statistics on the changes of the bill of quantities, and put forward timely treatment opinions on the changes of quantities. 4. 1.3 Go to the site regularly to review various payment statements and interim payment certificates. Prepare various financial statements, project progress reports and reports submitted to the owner and the loan bank. 4. 1.4 is responsible for organizing the compilation and summary of all kinds of supervision reports, and organizing the compilation of the work report of the director (deputy), the project supervision completion report and the supervision briefing. 4. 1.5 assist the director (deputy) in handling contract disputes.
4. 1.6 provide contract documents to the contractor and the supervisor.
4. 1 Responsibilities of Contract Management Department
4. 1. 1 Check the implementation of the construction contract.
4. 1. 1. 1 Check whether the personnel and main equipment entering the site are consistent with the tender.
4. 1. 1.2 Put an end to subcontracting and ensure some subcontracting.
4. 1.2 Check the engineering quantity, make statistics on the changes in the bill of quantities, and put forward timely treatment opinions on the changes in quantity. 4. 1.3 Go to the site regularly to review various payment statements and interim payment certificates. Prepare various financial statements, project progress reports and reports submitted to the owner and the loan bank. 4. 1.4 is responsible for organizing the compilation and summary of all kinds of supervision reports, and organizing the compilation of the work report of the director (deputy), the project supervision completion report and the supervision briefing. 4. 1.5 assist the director (deputy) in handling contract disputes.
4. 1.6 provide contract documents to the contractor and the supervisor.
4.2 Responsibilities of Engineering Department
4.2. 1 Cooperate with the resident office to review the contractor's construction organization plan, construction technical plan, special technical treatment measures and special construction technology. 4.2.2 Make statistics on the project progress of the whole line and each contract section, draw the corresponding construction progress chart, and provide the owner with the project quality and progress report. 4.2.3 Organize training of supervisors, technical exchange and handling of major quality accidents.
4.2.4 Be responsible for handling the engineering change and the subsequent drawings of the changed engineering.
4.2.5 Solve the problems such as omissions, errors and ambiguities in design drawings and technical specifications.
4.2.6 Review the standard test report and pre-test plan submitted by the contractor. 4.2.7 Supervise the resident office to review the contractor's quality management system, conduct regular sampling inspection on the project quality, and grasp the dynamic of the project quality. 4.2.8 Provide various quality reports, management reports and technical data.
4.2.9 Statistics of engineering quality accidents and collection of relevant accident data.
4.2. 10 is responsible for the shooting and management of engineering photos, videos and other materials.
4.2. 1 1 Provide drawings and other relevant information to the contractor and the supervisor.
4.2. 12 record the log of the director's office and important supervision activities, and be responsible for the minutes of meetings presided over by the director's office.
4.2. 13 Organize the completion acceptance and defect liability period acceptance, and prepare the completion acceptance report.
4.3 Responsibilities of the General Department
4.3. 1 Under the leadership of the director (deputy), formulate supervision rules and regulations, and inspect and supervise the implementation. 4.3.2 Be responsible for the classification, filing, reporting and distribution of all kinds of documents, notices, reports and minutes.
4.3.3 Responsible for the finance, logistics, communication, typing and publication of the Director-General.
4.3.4 Be responsible for the daily reception of the director's office.
4.4 Responsibilities of Supervision Laboratory
4.4. 1 under the leadership of the director's office, responsible for all kinds of supervision and testing work. The central laboratory shall inspect and guide the work of other laboratories. 4.4.2 Assist the site to inspect the contractor's laboratory and its test instruments and equipment, and regularly supervise and inspect the calibration work of the contractor. 4.4.3 Attend relevant site meetings and important site regular meetings and conferences in the contract section.
4.4.4 Assist the resident office to verify or review the control index test conducted by the contractor. 4.4.5 Participate in the sampling test sent or proposed by the supervisor of each contract section, and submit the test results and conclusions in time. 4.4.6 Prepare and provide various test report formats, and stipulate unified arrangement and preservation.