With the general improvement of people's legal awareness, the frequency of using contracts is on the rise, and signing contracts can protect our legitimate rights and interests according to law. So do you know how to write a legal contract? The following is the entrustment contract (generally 5 items) I have compiled for you for your reference, hoping to help friends in need.
Construction Agent 1 Entrusting Contract: (hereinafter referred to as Party A)
Agent: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and the relevant measures for the management of construction projects, after study by the client, it is agreed to entrust the construction project to the agent for agent management, and this contract is concluded on the basis of equality, voluntariness, honesty and credibility.
I. Overview of the Project
Project name:
Project location:
Project content:
Land area:
Total investment (estimated investment):
Project approval number:
Second, the total project duration
* * * Calendar day, from.
Third, the quality standard
titular
Four. Contract price
The client takes% of the project construction and installation costs (including the main body of construction and installation, outdoor overall and other supporting engineering costs, excluding labor insurance co-ordination), survey fees, archaeological fees, planning and design fees, inspection fees, supervision fees, consulting fees and other costs related to construction management as the construction management fee of the agent.
V. Contract documents
The documents constituting this contract include:
1, written document or agreement modification document of engineering change and negotiation approved by both parties.
2. Entrusted construction contract
3. Special terms and conditions of this contract
4. General terms and conditions of this contract
5. Technical documents describing the agent construction project
6. If there are any ambiguities or inconsistencies between the standards, specifications and relevant technical documents constituting this contract, they shall be interpreted in the above order.
Progress goal of intransitive verb project
Seven. The meanings of related words in this agreement are the same as those given to them in the General Conditions of Contract in Part II of this contract.
Eight, the agent promises to the client, according to the provisions of this contract, within the scope of the special terms and conditions of this contract to undertake the entrusted construction work of this project.
Nine, the client promises to the agent, in accordance with the terms, methods and currency agreed in the special terms of this contract, pay the agent management fee.
X. Entry into force of the contract
Date of conclusion of the contract: year month day.
Contract signing place:
This contract shall come into effect after being signed and sealed by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Client (Party A): Custodian (Party B):
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, in order to ensure the smooth implementation of the investment construction project, give full play to the investment benefit and strictly control the investment budget, the Entrusting Party and the Escrow Party reach an agreement through consultation, and sign this contract.
I. Overview of the Project
Specific projects implemented in 20xx:
Second, the project management node objectives
(1) Primary node completed by the entrusting party
Complete the main key nodes in the early stage.
1, 20xx Complete the product positioning decision of the project before February 28th, and go through relevant preliminary procedures such as project establishment, land and planning scheme.
2.20xx 20 days before the completion of the project construction bidding, signed a contract, and obtained the project construction permit.
(2) The custodian completes the master node.
20xx completed the planning scheme on February 20th and submitted it to the entrusting party for approval and confirmation.
20xx completed the construction drawing design on March 28th, and submitted it to the entrusting party for drawing review.
20xx March 15 completed the construction unit's mobilization.
March 20xx1May-May 15, the foundation of performing arts center reached May 20xx1June-August 3 1, and the main construction was capped.
20xx September1-June 65438+1October 3 1, indoor and outdoor civil decoration reached the completion conditions.
20xx165438+1October-Indoor heating enters indoor hardcover.
20xx February 28th-Hardcover Completed
Three. 20xx annual investment plan
A total of 65 million yuan.
note:
1. The above capital plan does not include the following contents:
1, indoor hardcover and equipment
2. Outdoor pipe network system
3. Outdoor projects
Two, the above funds must be in place on a monthly basis.
3. Hardcover and equipment funds shall be planned and arranged by the entrusting party.
Chapter II Scope and Content of Entrusted Management
I. Planning and demonstration of the project
Party B shall cooperate with Party A in the functional planning and demonstration of the project, and prepare relevant materials based on the principle of overall planning and phased development of the project, and make planning suggestions and opinions on the project subject to tender.
Second, the project architectural design bidding
Party B shall, according to the functional requirement report approved by Party A, cooperate to complete the bidding of the overall architectural design scheme of the project, assist Party A in selecting the excellent scheme, complete the expert demonstration and government approval of the scheme on the basis of deepening and perfecting the scheme design, and assist Party A in signing the engineering design contract with the winning designer.
Three, for the development and construction of government procedures
Party A entrusts Party B to cooperate with Party A to continue to handle the formalities of project establishment, planning, land, construction, municipal utilities, streets and other government departments, and organize and coordinate related work according to the work conditions in the early stage of project development and during the project construction.
IV. Project Coordination and Supervision
Party A entrusts Party B with supervision, control, coordination, management, design, construction, supervision and other aspects, and is responsible for solving and coordinating problems in the work to ensure the full realization of the schedule, technical scheme, quality, safety, cost and other plans.
Five, schedule management
Party B is responsible for making the construction progress plan of the project, including the general control plan for adjusting the development and construction progress of the project, which will take effect after being approved by the owner. Party B shall urge and assist all units involved in the project construction to prepare their own work plans according to the requirements of the master control plan, so as to coordinate with each other and check the implementation of various progress plans.
Six, engineering quality management
Party A entrusts Party B to formulate the quality objectives and working system of the project. After Party A fully defines the quality requirements of the project and the design unit carries out the design, a quality implementation plan will be prepared and submitted to Party A for approval. And supervise and control the project quality management according to the approved quality control plan.
Seven. contract management
Party B shall, on the basis of in-depth analysis and research on the project contents and design documents, put forward suggestions on the division of the contracted scope of subcontracted projects to the owner, and prepare the project contract and submit it to the owner for approval. The formulation of the contract should ensure that: design and construction fully overlap; Clarify the scope of work between contractors; Conducive to the coordination between subcontractors. All kinds of contracts shall be filed by Party A after signing.
Eight, organize the bidding work
On the basis of Party A's approval of the general control plan of the project progress, Party B is responsible for cooperation.
Nine. purchasing management
Party B shall cooperate with Party A to complete the selection and management of important materials and equipment for this project. Party B shall, according to the functional requirements of the project and the progress of project construction, conduct market research, select materials and equipment needed for the project, negotiate with manufacturers, prepare detailed procurement plans and energy price comparison reports, draft a supply contract after approval by Party A, and submit it to Party A for approval, and be responsible for supervising and managing the implementation of the supply contract. Accept materials and equipment according to the contract, and implement installation, commissioning and warranty matters on behalf of Party A and the manufacturer. ..
X. Project cost management
Party B is responsible for project cost management. In the process of project implementation, be responsible for organizing the compilation and review of various target budgets, and completing the budget estimates and review of various stages and subdivisional works of the project on time, including handling various design changes, on-site construction technical measures and economic negotiations. Within one year after the completion of the project, the project completion settlement report confirmed by each unit shall be completed and submitted to Party A. If the project is completed and delivered by stages, it shall be completed and submitted on schedule respectively.
XI。 project acceptance
Party B shall cooperate with Party A in project completion, acceptance by the government quality inspection department, interface between various municipal projects and this project, handle all formalities related to acceptance, and be responsible for safeguarding Party A's economic interests and legitimate rights and interests. This project is normally put on record in the quality supervision department, and after the completion and acceptance of all municipal works of this project, Party B will not keep the site.
Twelve. archives administration
Party B shall cooperate with Party A to be responsible for the management of development and construction project files and the filing of the completion data of this project. Party B shall ensure that when the project is qualified, it has a complete set of development and construction project files (originals) with perfect system and reasonable classification and hand them over to Party A. ..
Thirteen. financial management
1. During the construction of this project, Party B shall provide a monthly fund use plan and submit it to Party A for approval, and Party A shall prepare the funds in time and pay them on time.
2. Party A entrusts Party B to prepare a detailed payment audit form on time to pay the contract money and other funds involved in the project construction and development, and submit it to Party A for approval, and Party A will pay directly according to the relevant contract terms or plans.
Chapter III Project Management Organization and Basic Operation Mode
I. Full-time management institutions and their members
After Party B accepts the entrustment of Party A, Party A shall immediately set up a full-time management organization "Gecheng Town Project Management Department in the West of Dabancheng", and Party A shall appoint the project manager and relevant management personnel, and Party A shall be solely responsible for assessing the work performance and performance of this organization and all its members; Party B shall appoint a deputy manager of the project department and relevant professional engineers.
Second, the meeting system and monthly report
The entrusted management of this project should follow the principle of "openness, communication and trust". In order to ensure the effective implementation of this project, Party B shall regularly work out the monthly/weekly work plan and adhere to the system of regular work meetings and special meetings. Minutes of meetings on related topics and monthly/weekly work of regular meetings.
Four. Signing of contract
Within the management scope entrusted by Party A to Party B, all external contracts and internal contracts of this project are reviewed and signed by Party A, and what Party A entrusts to Party B is only contract drafting, contract execution and contract management.
Chapter IV Responsibilities and Obligations of Both Parties
I. Responsibilities and obligations of Party A
1. Determine the product positioning and investment decision of the whole project;
2, responsible for the whole process of project construction management and set up a management team;
3 lead the organization of project planning, design approval, construction drawing design and drawing review;
4. Take the lead in handling all preliminary procedures of the project (such as land acquisition planning approval, construction permit approval, green passage, etc.). );
5. Be responsible for the fund management of project construction, and allocate project funds according to the project progress;
6. Responsible for organizing the procurement management, bidding and contract signing of the main materials and equipment of the whole project;
7. Leading the project acceptance procedures and coordinating relevant functional departments;
8. Complete the final accounts of the project completion;
9, responsible for site tree transplantation, construction water and electricity coordination;
10. Put forward work objectives, tasks and work requirements to Party B;
1 1. Provide all kinds of data and information required for the work specified in this contract;
Two. Responsibilities and obligations of Party B
1, responsible for implementing the project construction management entrusted by the owner and delivering complete and qualified products.
2, responsible for project planning and design, scheme, construction drawing design;
3, cooperate with the owner to complete the project acceptance procedures;
4. Cooperate with the owner's finance to submit the project payment audit form;
5, project budget and final accounts management;
6. Cooperate with the owner to negotiate, bid and sign foreign contracts;
7. Cooperate with the owner to report the project completion data.
Chapter V Management Expenses
I. Entrusted management fee
Party B's development and project management expenses for this project are calculated at 3% of the total project construction expenses (hereinafter referred to as the total management fee), and the total management fee is tentatively set at 654.38 yuan+950,000 yuan. Party A and Party B agree to settle the management fee on time when the total management fee is greater than the above tentative price; When the total management fee is lower than the above tentative price, the management fee shall be settled according to the above tentative price. Project expenses are mainly used for personnel salaries, office expenses, travel expenses and incentive funds in project management.
Second, the management fee payment method
Both parties agree that the payment method is 3% of the construction output value audited every month.
Chapter VI Effectiveness of Contract and Liability for Breach of Contract
1. This contract shall come into effect as of the date of signature.
2. If the project management is delayed due to the client's reasons, the escrow agent shall promptly inform the client of the situation and possible impact, and the client shall take corresponding measures. Due to the Client's failure to take corresponding measures, the Custodian may continue to suspend all or part of the project management business until the termination of this contract. The entrusting party shall be liable for breach of contract.
3. If Party A fails to complete the preliminary procedures according to the main key nodes reached by both parties, the construction period will be postponed according to the actual situation;
4. If Party A fails to allocate the project construction funds as planned, resulting in the delay and shutdown of the construction period, Party A shall bear the liability for breach of contract and related expenses;
5. Party B fails to cooperate with Party A to complete the planning and design scheme and construction drawing design as planned, resulting in the delay of major key nodes, and Party B shall bear the responsibilities and related expenses;
6. If Party B fails to complete the project schedule as planned, Party B shall bear the responsibility.
VII. This contract shall be terminated when the escrow agent and the client complete the project handover procedures and the final accounts of the project completion, and the escrow agent receives the final payment of the project management remuneration.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Construction Agency Entrustment Contract III: (hereinafter referred to as Party A)
Agent: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and the relevant measures for the management of construction projects, after study by the client, it is agreed to entrust the construction project to the agent for agent management, and this contract is concluded on the basis of equality, voluntariness, honesty and credibility.
I. Overview of the Project
Project name:
Project location:
Project content:
Land area:
Total investment (estimated investment):
Project approval number:
Second, the total project duration
* * * Calendar day, from.
Third, the quality standard
titular
Four. Contract price
The client takes% of the project construction and installation costs (including the main body of construction and installation, outdoor overall and other supporting engineering costs, excluding labor insurance co-ordination), survey fees, archaeological fees, planning and design fees, inspection fees, supervision fees, consulting fees and other costs related to construction management as the construction management fee of the agent.
V. Contract documents
The documents constituting this contract include:
1, written document or agreement modification document of engineering change and negotiation approved by both parties.
2. Entrusted construction contract
3. Special terms and conditions of this contract
4. General terms and conditions of this contract
5. Technical documents describing the agent construction project
6. If there are any ambiguities or inconsistencies between the standards, specifications and relevant technical documents constituting this contract, they shall be interpreted in the above order.
Progress goal of intransitive verb project
Seven. The meanings of related words in this agreement are the same as those given to them in the General Conditions of Contract in Part II of this contract.
Eight, the agent promises to the client, according to the provisions of this contract, within the scope of the special terms and conditions of this contract to undertake the entrusted construction work of this project.
Nine, the client promises to the agent, in accordance with the terms, methods and currency agreed in the special terms of this contract, pay the agent management fee.
X. Entry into force of the contract
Date of conclusion of the contract: year month day.
Contract signing place:
This contract shall come into effect after being signed and sealed by both parties.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Agent (hereinafter referred to as Party A) entrusts Contract IV:
Trustee (hereinafter referred to as Party B):
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and the Administrative Measures for the Construction Agent System of Non-operating Government Investment Projects in Wuhan (Trial), through research, Party A agrees to entrust the construction project to Party B for agent construction. In line with the principles of equality, voluntariness, honesty and credit, and in order to clarify the responsibilities and rights of all parties, this contract is concluded on the construction agency.
I. Overview of the Project
1, project name:
2. Project location:
3, the project (budget) investment:
4. Project approval number:
Second, the project construction cycle
Total project duration (from the date of signing the contract):
Third, the quality standard:
Four. Contract price
Party A will undertake% of the planned investment of the project in DocumentNo.. [20xx]249 issued by the Construction Committee shall be used as the construction fee of Party B.. Ten thousand yuan.
Verb (abbreviation of verb) constitutes the document of the contract.
1, contract agreement and contract conditions;
2, the project construction power of attorney;
3. Supplementary and revised texts signed by both parties during the project implementation.
Party A agrees to pay the construction agency fee to Party B according to the time limit, method and currency specified in this contract.
Seven. Party B agrees to undertake the construction agency work within the scope agreed in the contract documents of this project in accordance with the provisions of this contract.
The original of this contract is in duplicate, one for each party; Four copies, two for each party. It shall come into effect after being signed and sealed by both parties, with the same legal effect.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Construction Agency Entrustment Contract 5 Construction Unit: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, and in combination with the specific conditions of this project, Party A and Party B have reached the following agreement through friendly negotiation on the basis of equality and mutual benefit, following the principles of equality, voluntariness, fairness and good faith:
I. Overview of the Project
1, project name: Linqing Hao Han Trade City Phase I 10KV power distribution project construction.
2. Project location: the northwest corner of the intersection of Xinhua Road and Wei Ba Road.
Second, the way and scope of contracting
Contract mode: contract design, contract labor, all contract equipment installation materials, contract machinery, contract duration, contract quality, contract safety, contract inspection, contract debugging, contract acceptance filing, contract power transmission and contract after-sales maintenance. Scope of contract:
1, power supply system design.
2. Procurement, transportation and storage of all installation equipment and materials; Manufacture, assembly and ex-factory inspection of high voltage tap box and combined box transformer;
3. Power supply system construction: Longshan Road+000m 150 pipe jacking; Transportation, installation, inspection and debugging of all equipment and materials from the T-junction clamp of No.9 pole of10/3 South China Line to the terminal three 630KVA box transformers through the high-voltage cable distribution box of Party A; Hanging a watch to send electricity, etc. Among them, the construction of 630KVA box transformer and cable on the north side of building 23#/KLOC-0 of Linqing Hao Han Trade City Phase I belongs to the rewiring project, and Party B is only responsible for cable construction, wiring, debugging and power transmission.
4, finishing engineering construction acceptance data
5, coordinate the relationship with the power supply department, the construction acceptance formalities.
Third, the construction cycle
July 20xx 15 to August 20xx 15.
Fourth, the project cost and payment method
Total price of this project: the total cost is RMB 680,000 Yuan only (including tax), six hundred and eighty thousand Yuan only (in words). See Party B's tender budget for details.
The total cost is a comprehensive cost including design, labor, all equipment installation materials, machinery, construction period, quality, safety, inspection, debugging, acceptance filing, power transmission, after-sales maintenance, taxes (safety taxes), etc.
Payment method:
1. Within 2 days after the contract is signed, Party A shall pay Party B 30% of the total contract cost as an advance payment;
2. Party A shall pay Party B 65% of the total project cost after Party B has passed the acceptance test and has the power transmission conditions (Party B must issue a complete project construction and installation invoice when paying this amount); Party B must successfully send electricity to Party A within 2 hours after receiving the project payment.
3. The remaining 5% will be used as quality guarantee. If Party B can repair the project in time within two years from the date of power transmission, Party A will pay Party B the quality deposit without interest within two years 15 days from the date of power transmission.
Five, box transformer technical requirements
1, European landscape style. The equipment is configured according to the drawings, and the high-voltage part has the functions of high-voltage measurement, metering and lightning protection (including analog screen), and has passed the acceptance;
2. All high and low voltage cabinets contain copper bars and their auxiliary accessories, and all cabinets must be marked inside and outside;
3. The internal low-voltage outgoing lines of each group of box-type transformers are 6 channels of 400A+2 channels of 250A, and the low-voltage cabinets are connected by buses;
4. The transformer adopts two sets of S11-630 KVA-10.5 (22.5%)/0.4 kV transformers (products are copper core and Dachi).
5. The shell of high-voltage cabinet adopts aluminum-zinc composite board, and the low-voltage cabinet adopts low-voltage GGD;; (The thickness shall conform to the national industry standard);
6. The bus requires copper bus, and the national standard T2 copper bus, and the quality standard refers to the requirements of national standards and specifications;
7. The brand of electrical switches and other components is Zheng Tai or the quality is not lower than this brand.
Six, installation quality standards
1. Party A and Party B agree on the construction quality standard of this project: it shall be implemented according to relevant national, local and industrial standards. Party B must carry out the construction in strict accordance with the construction drawings, description documents and electrical engineering specifications, procedures and standards promulgated by the state, and accept the supervision of Party A's representative.
2. Quality standards of materials and equipment provided by Party B: the latest national and industrial standards and relevant regulations of national and local administrative departments shall be implemented. If Party A suffers losses due to unqualified quality, Party B shall be liable for compensation.
3. For other requirements, please refer to relevant national standards, national standards of the Ministry of Machinery and enterprise standards.
4. The main raw materials, equipment, components and semi-finished products provided by Party B must provide quality certificates according to relevant regulations, or can be used in the project only after passing the inspection;
5. If Party A finds that Party B has cut corners in the construction process, Party A has the right to demand Party B to pay liquidated damages of 10% of the total project price in addition to ordering Party B to restore the standards stipulated in the drawings or contracts.
Seven. Responsibility of both parties
Party A's responsibilities:
1. Provide temporary land for storing construction machinery and equipment.
2. The construction site must meet the construction conditions, otherwise Party B will not be responsible for the delay of the construction period.
3. Pay the project payment in time.
Party B's responsibilities:
1. Within 3 days after the signing of the contract, Party A shall be provided with two high-voltage system design drawings, box-type transformer and high-voltage tap box foundation construction drawings, so that Party A can arrange civil construction;
2. After the project is completed, Party B shall provide Party A with complete building materials, original equipment materials, spare parts, special tools and as-built drawings;
3. Party B is responsible for reporting the project acceptance to the relevant departments of Linqing Power Supply Company according to the prescribed procedures.
4. Party B shall complete the project construction in strict accordance with the contract, strictly abide by the relevant rules and regulations on safety and construction of the power industry, and ensure the safety and quality of construction. If Party B fails to pass the acceptance due to technical problems in construction, Party B has the responsibility to make timely rectification according to the requirements of the electric power department. If the construction period is delayed, Party A shall be compensated by 3% of the total contract price for each day of delay.
5. If Party B owns 630KVA power distribution construction projects in other projects in Linqing in the future, Party B shall assist Party A to sell high-voltage metering devices and high-voltage switches equipped with 630KVA box transformers at the market price.
Eight. defects liability period
The warranty period of box transformer and high voltage tap box is 20 years, and the warranty period of others is 2 years. During the warranty period, Party B must unconditionally repair or replace the engineering quality problems for free within 24 hours. If losses are caused to Party A, Party A shall be compensated accordingly.
Nine. Entry into force of contract
Effective date of the contract: July 20xx 15.
This contract shall come into effect after being signed by both parties. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively, all of which have the same legal effect. The contract is automatically terminated after the warranty period expires.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
;