What materials should be prepared for fire acceptance?

The materials to be prepared for fire control acceptance are as follows:

1. Architectural design documents: including architectural construction drawings, fire-fighting facilities layout drawings, evacuation passage design drawings, fire-fighting water supply pipes, indoor fire-fighting equipment installation drawings, etc. These documents need to ensure compliance with relevant national and local fire regulations and standards.

2. Construction drawings and acceptance drawings: The construction drawings and acceptance drawings shall clearly indicate all fire-fighting facilities and evacuation routes, and comply with relevant design specifications.

3. Completion drawing of fire-fighting facilities: The completion drawing of fire-fighting facilities is a drawing drawn after the completion of a building project, indicating the position, model and quantity of all installed fire-fighting facilities and equipment.

4. Account of fire-fighting equipment and facilities: including information such as fire water source, fire pump, fire alarm system, automatic sprinkler system, fire extinguisher model, manufacturer, installation location, installation date, etc.

5. Safety assessment report: A safety assessment report is a document to assess the fire safety performance of a building, which is usually issued by a professional fire safety assessment agency.

6. Completion acceptance report: The completion acceptance report is issued by the construction unit, which includes information such as quality, safety and civilized construction during the construction process, as well as the completed project scope.

7. Completion acceptance report of fire-fighting facilities: The completion acceptance report of fire-fighting facilities is provided by the construction unit or the supplier of fire-fighting facilities, which describes in detail the situation that the installed fire-fighting facilities meet the relevant standards.

8. Safety production license: Safety production license is the necessary information for the construction unit, and the safety production license of the relevant unit is usually required for fire control acceptance.

9. Application Form for Fire Control Acceptance: The application form for fire control acceptance is a formal document to apply for fire control acceptance to the relevant competent authorities, and detailed building materials and fire control facilities need to be provided.

10. Other relevant certificates and materials: According to the actual needs, it may be necessary to provide other relevant certificates and materials, such as the qualification certificate of the construction unit and the qualification certificate of the fire-fighting facilities supplier.

The above is the information that usually needs to be prepared in the fire acceptance. It should be noted that different regions may have different requirements for fire inspection and acceptance. It is recommended to consult relevant local departments for specific acceptance requirements and procedures before fire acceptance.