1 Talking about architecture
What does 1. half contain and all contain?
2. Are workers their own workers or outsourced?
3. Who will bear the safety problem of workers?
4. Is there a construction site? Can you go and have a look?
5. How to deal with the injury of workers at home?
6. putty and latex paint should be used several times. Is it completely dry?
7. How many times is it waterproof? What's your height?
8. Is there barbed wire between the old and new walls?
9. How to paste the wall tiles?
10. How do workers cut corners during decoration?
1 1. How long is the water and electricity warranty? What if something goes wrong?
12. What are the acceptance criteria for water, electricity, tiles and walls?
13. What brand and model are hydropower materials, latex paint and cabinets?
14. What materials are used for toilet backfill?
15. Is the main material of the exhibition hall optional or limited?
16. Are other materials environmentally friendly?
2 Talking about expenses
1. Can the extra expenses for decoration be agreed?
2. How long is the construction period and how to calculate the expenses outside the construction period?
3. How do you charge the design fee? Is there any discount?
4. What is the payment ratio?
5. Is there a handling fee for the staircase room?
6. How to collect the garbage cleaning fee?
7. Is the quotation based on the construction area or the interior area?
8. There are several colors of latex paint. How to calculate the cost of color matching?
9. How to calculate the penalty for not completing the project within the promised time?
10. What is the proportion of project management fee?
1 1. Is hydropower calculated point-to-point or by meter? Is there any advance payment in advance?
12. How many meters is the kitchen cabinet packed, and how to calculate the excess?
13. What items are personalized and how do you charge them?
14. Does the balcony need to be waterproof? If so, how to calculate the cost?
15. How much is the plaster line?
16. How much does it cost to lay unconventional tiles?
3 common additions and deletions in quotation
1. The area is exaggerated.
2. Falsely reporting the loss of building materials
3. Don't indicate the materials of wires and water pipes.
4. Multi-color latex paint charges more.
5. Ground leveling
Exquisite sewing
7. Zero design fee
Shovel wall
9. Failure to report changes
10. The process description of garbage cleaning fee 5 is vague.
1 1. gypsum line price
12. Toilet waterproofing
13. The water and electricity quotation is unclear.
14. Open-line closed-slot currency
15. Tile chamfering fee
16. Toilet backfill
17. windowsill stone and lintel stone
4 matters needing attention in signing a contract
Look at the terms of payment
Installment payment for decoration:
Down payment: down payment: 30%~50% (to be paid after signing the contract)
Second payment: 30% (to be paid after the acceptance of water and electricity)
Third payment: 30% (to be paid after the bricklayer and carpenter pass the acceptance)
Fourth payment: 10% (to be paid after completion acceptance)
Look at the brand model
This is very important. If the brand and model are not clearly marked, the decoration company can make a fuss. When the time comes, the money is spent, but it is a pile of bean curd projects, and there is no place to cry. Sometimes it is not enough to just mark the brand, but also the model. For example, in Huitong, it was written that the brand of putty was Nippon, but the model was not indicated. You may be given ordinary putty, not waterproof putty. The brand, model and approximate quantity of installation equipment and materials must be clearly stated in the contract, especially for small things, even elbows and glue.
Look at the acceptance criteria
After each link is completed, the owner will accept it. Renovation contract should define the acceptance criteria of each working procedure so that the owner can accept the project.
Look at the process description
The transformation process is mainly divided into five parts: main body demolition transformation, hydropower transformation, woodworking engineering, mud tile engineering and painting engineering. Each big plate will be subdivided into specific steps. In renovation contract, the process of each step should be detailed, and the more detailed, the better.
See addition and omission.
The most common pit in the quotation is to deliberately leave out some things that must be done, and then wait until the formal decoration to tell you that this must be done, but also to make up the money. So the missing items become additions. At this time, you have paid a large part of the decoration money, and there is nothing you can do except pay the money. So before signing the contract, you must read it carefully to see if there are any additions or deletions.
5 decoration cost bargaining skills
Cut the unit price and the total price together.
Don't cut the total price, but also see which unit prices can be cut. Don't cut the unit prices of some important processes.
Cut on the blade
Reduce low-tech projects: handling fees, demolition fees and management fees.
The price of non-standard cutting technology: it is best to ask clearly the items that are easily overlooked, such as skirting line, straightening of door opening, straightening of beam body, and diamond-shaped hole taking.
Don't cut high-tech projects casually: water, electricity, tiles and paint projects should be cautious. The workers invited by the decoration company are too poor, and the decoration effect and quality are not good.
Can't reduce the configuration.
When encountering a decoration company that really refuses to reduce the price, it is suggested to upgrade the configuration, such as waterline, latex paint and putty, and replace it with a better brand model.
Dark ones are not as expensive as bright ones.
Expensive is better than not expensive, and the project is as complete as possible.
Some decoration companies like to quote a very low price first, and then add many projects during construction, resulting in higher costs. You'd better have the designer check it before signing the contract formally.
The brand of these materials must be written in the contract.
Plate brand is determined in advance.
The brand of water pipes is determined in advance.
The brand of wire is determined in advance.
Paint brands are determined in advance.
The brand of putty powder is determined in advance.
The brand of gypsum board is determined in advance.
The brand of cement is determined in advance.
The brand of switch socket is determined in advance.
Waterproofing is determined in advance.
It's no use making a verbal promise to use better materials. Only what is written in the contract is your own. If you want to make good use of these materials, you must write them in! )