Since its establishment 47 years ago, our institute has undertaken a number of general contracts for engineering design and construction, covering coal industry, industrial and civil buildings, thermal power, building materials, paper making, machinery manufacturing, roads and bridges, safety assessment and other fields.
As the main design unit of Hunan coal industry, it has made due contributions to the healthy development of Hunan coal industry by focusing on the construction of core business capabilities. The geological conditions of Hunan coal mines are complex, natural disasters are serious and the safety foundation is weak. Our hospital insists on improving the safety level of coal mines. In recent five years, our institute has been undertaking the consulting and design work of Hunan coal mine safety technical transformation project. Through detailed investigation and innovative design of all state-owned coal mines in Hunan Province, nearly 200 feasibility studies and preliminary design reports have been compiled, which laid the foundation for national decision-making and implementation of special funds for coal mine safety technical transformation and made great contributions to improving the safety level of coal mines in Hunan Province.
Implementing comprehensive management of coal mining subsidence area is a popular project of the country. Our hospital accepted the consulting design of comprehensive treatment projects for three coal mining subsidence areas, including Baisha, Lianshao and Chenzhou state-owned key coal mines. Through careful organization and design, the design task was completed with high quality, high standard and high efficiency, which laid a good foundation for ensuring the smooth implementation of the project.
In order to ensure the rational development and sustainable utilization of coal resources in Hunan Province, optimize the coal production structure and improve the level of industrial development, our institute has completed the provincial, city and county coal development plans in Hunan Province, as well as the technical transformation, industrial upgrading and joint transformation of a number of key mines, which has provided good technical support for the healthy development of Hunan coal industry.
Our institute has actively expanded its business, and won the favor of owners in Guizhou, Henan, Hebei, Anhui, Shanxi and other provinces by virtue of high-level design and excellent service such as coal, thermal power, coal washing processing, industrial and civil construction, and engineering supervision. At the same time, our institute also undertakes engineering survey, consultation and design of foreign coal mines, coal washing plants, thermal power plants, power transmission and transformation projects, stadiums, official villas, expert bases and other construction projects.
Since its establishment, the Institute has undertaken consulting, design and general contracting of various engineering projects, such as overall planning of mining areas, mines, centralized coal loading stations, coal washing plants, coking plants, thermal power plants, cement plants, paper mills, comprehensive utilization of stone coal and gangue, electromechanical repair shops, high-rise buildings, colleges and universities, community planning, storage systems, railways, highways, bridges and culverts, power transmission and transformation projects, water supply and so on. Undertaking engineering supervision of a number of large and medium-sized mines, highways, tunnels, residential buildings and first-class buildings; Undertake geotechnical engineering and engineering investigation projects of various sites. * * * mine and ancillary works completed 100 (coal preparation plant, coking plant, gangue power plant, etc. ), has undertaken more than 20 foreign engineering designs, with a construction area of 1.85 million square meters and 900,000 meters of various large roads and tunnels. The projects undertaken generally win the praise and praise of customers for their high efficiency, excellent quality and good service.
Our hospital has a perfect quality management system and passed the ISO900 1:2000: 2000 quality system certification. All staff always adhere to the principle of "abiding by the contract, carefully designing and satisfying customers" in the design work. The quality policy of "continuous improvement, scientific and technological innovation, leading the industry" regards quality as life, meticulously implements and operates every project, and wholeheartedly completes every service, which fully demonstrates the first-class technology, first-class service and first-class style of Grade A design institutes, ensuring the contract performance rate 100% and the qualified rate of design products 100%. 96% quality target. 100 Many projects have won national, provincial and municipal excellent survey and design, scientific and technological progress, scientific and technological achievements and excellent QC achievement awards, and achieved good social and economic benefits.