In railway construction, what is the average cost per kilometer of track engineering?

The comprehensive index of China Railway electrification single track is 24 million/km, depending on regional differences.

The comprehensive electrification index of local railways per kilometer is about 22 million/km.

The internal combustion of special lines for industrial enterprises is about130,000 /km.

At present, wooden sleepers and spikes are no longer used in special lines of industrial enterprises (such as existing reconstruction and reinforcement of existing bridge sleepers). ), and use a new elastic fastener.

Some dedicated lines are special, involving less professional design, only the track part, and the comprehensive index is mostly 7 million /km.

The adopted investment quota is based on the new quota of 20 1 1 and 1 of the Ministry of Railways.

Other related questions can be consulted with friends. Good luck with your work!