Engineering Intermediary Agreement 1 Party A: (Intermediary) Agreement

Address: Party B: (Customer) Address:

In order to give full play to the advantages of both parties, Party A and Party B have reached the following agreement in accordance with the Contract Law of People's Republic of China (PRC) and the principles of equality, voluntariness and equal compensation:

I. Entrusting matters

1. Party A accepts the entrustment of Party B, provides information about this project to Party B, and finally facilitates Party B to sign a professional contract for this project with the construction unit.

Two. Obligations of Party A

1. Party A shall provide Party B with information about the project, and shall be obliged to assist Party B to conduct on-the-spot investigation on the project and related business matters.

2. Party A promises to provide Party B with true and reliable project information.

Three. Obligations of Party B

1. Party B is responsible for providing qualification certificates, business licenses and other relevant materials; Responsible for contract negotiation with the construction unit.

2. If the intermediary is successful, Party B will fully perform the professional contract signed with the construction unit. Party B's rights and obligations arising from the performance of this contract have nothing to do with Party A. ..

3. If the intermediary is successful or the engineering materials provided are valid, Party B shall pay the intermediary remuneration to Party A as agreed.

Four, the amount of intermediary remuneration, payment time and payment method.

1, total project agency fee = project information fee+project commission.

I. Project Information Fee

Decoration area is 300㎡-700㎡ (inclusive)/project, 1000 yuan/project; The decoration area is 700㎡/ project, 1500 yuan/project.

B. Project commission: 3% and 5% of the net contract value.

1) The broker only provides engineering information and does not directly negotiate with the construction unit. If the broker succeeds, the commission will be 3%.

2) The broker, the introducer and the construction unit directly negotiate and participate in the contract negotiation, and the broker succeeds with a 5% commission.

3) The net contract amount refers to the contract amount after deducting the rebate of 3.4 1% from the construction unit.

4) When the broker can assist in the negotiation and get higher profits, the amount of project commission can be negotiated.

2. Payment of project information fee: Party B's participation in the quotation of the construction unit can be tracked by the customer and paid within two weeks after the quotation.

3. Project royalty payment: after the contract is signed, the project will be paid one by one in proportion to the progress payment, and each payment will be paid within one week after the progress payment is received, or once after the project is accepted. The specific way can be agreed by both parties separately.

4. Party B can pay by transfer or cash.

Verb (abbreviation for verb) confidential matter

1. Both parties shall fully keep the business secrets involved in this agreement.

Termination of intransitive verb agreement

1. This agreement shall be valid for one year after it comes into effect.

Seven. any other business

1. Party A shall not delegate the matters entrusted in this agreement.

2. This Agreement shall be made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties.

Party A: (Seal) Party B: (Seal) Legal representative or entrusted agent: Contact information: contact information:

Agreement signing place: Agreement signing date:

Article 2 of the project intermediary agreement Party A (principal): xxx Party B (intermediary): xxx.

Contact address: xxx Contact address: xxx

Tel: xxx Tel: xxx

In order to give full play to the advantages of both parties, according to the Contract Law of People's Republic of China (PRC), Party A and Party B, based on the principles of equality and mutual benefit, equality and voluntariness, and sincere cooperation, have reached the following agreement through full consultation:

I. Entrusting matters

1. Entrusted by Party A, Party B is responsible for contacting the owner about the earthwork project of Zhuhai Airport, and finally urging Party A to sign a professional contract for this project. The engineering quantity is 6,543,800,000 cubic meters (subject to actual engineering quantity). Guaranteed price 15.5 yuan per cubic meter (agency fee shall be deducted).

Two. Obligations of Party B

1. Party B must provide information about this project to Party A and promise that the above information provided to Party A is true and reliable. If the information provided by Party B is untrue, Party B has no right to get intermediary remuneration, and Party B has the obligation to assist Party A in the field investigation of the project.

Three. Obligations of Party A

1. Party A is responsible for providing qualification certificates, qualification certificates, business licenses and other relevant materials; Responsible for contract negotiation with contractors.

2. If the intermediary is successful, Party A will fully perform the professional construction contract signed with the contractor. Party A's rights and obligations arising from the performance of the construction contract have nothing to do with Party B. ..

3. If the intermediary is successful, Party A shall pay the intermediary remuneration to Party B as agreed in this contract. If Party B fails to pay in time, Party B shall pay a penalty of 0% of the unpaid amount every day.

Four, the settlement method, payment time and payment method of intermediary remuneration

1. After successful intermediation, Party A shall pay Party B the intermediation service fee per cubic meter of 2.5 yuan according to the project contract. * * * 25 million yuan (after tax).

2. Party A shall pay the intermediary service fee to Party B in three installments:

First time: signing a contract with a unit recognized by both parties, and Party A pays Party B 2.5 million yuan.

Party A shall pay the second RMB 10000 Yuan to Party B within two days after receiving the first project advance payment.

The balance shall be paid once every three months, and Party A shall pay Party B in three installments according to the proportion of the signed intermediary agreement.

3. Party A shall pay Party B in cash or by transfer, and Party B shall collect Party A's intermediary service fee without issuing invoices and bearing any taxes and other handling fees.

Verb (the abbreviation of verb) undertakes the intermediary expenses.

1. If the engineering information provided by Party B is untrue, the actual expenses incurred by Party A shall be borne by Party B. If Party A fails to sign the contract, the actual expenses incurred by Party B shall be borne by Party A. ..

Confidential matters of intransitive verbs

1, Party A and Party B shall fully keep the business secrets involved in this agreement.

Seven. Termination of contract

1. If the mediation is successful, this contract will be terminated after full performance.

2. When Party A and Party B terminate the contract by agreement or other legal matters occur, the contract is terminated.

Eight. Dispute resolution method

In case of contract disputes, both parties shall settle them through consultation; If negotiation fails, the case shall be submitted to the arbitration commission of the place where the contract is signed for arbitration, or a lawsuit may be brought directly to the local people's court.

Nine. any other business

1. Party B shall not delegate the matters entrusted in this contract.

2. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties. Both parties shall provide copies of valid identity documents attached.

Contract signing place:

Party A (seal): xxx Party B (seal): xxx

Legal representative or entrusted agent: xxx Legal representative or entrusted agent: xxxx.

Xxxxxx year x month x day xxxx year x month x day

Project Intermediary Agreement Article 3 Whereas, xxx Company (hereinafter referred to as Party A) and Mr. Wang (hereinafter referred to as Party B) have fully contracted the "China Construction Bank Sichuan Branch Financial Operation Center Project" and reached the following cooperation agreement.

Rights and obligations of Party A:

1. Party A guarantees that the qualifications and relevant information it provides for contracting this project are true and legal.

2. In order to cooperate with Party B's work, Party A designates a special person to be responsible for communication, and promises to cooperate with Party B to pay related travel expenses, entertainment expenses and other expenses.

3. Within two days after the signing of this agreement, Party B shall pay a deposit of three million yuan in good faith and remit it to the designated account as required by Party B.. ..

4. In order to thank Party B for its great cooperation and efforts, Party A agrees to use 4% of the total investment of the project as labor fee and cooperation bonus, and promises to pay it to Party B in installments within three months after the start of construction, which can be paid in advance. The details will be discussed separately by both parties.

Verb (abbreviation of verb) Party A confirms that Party B is the only partner signing this project. Party A has the right to ask Party B about the progress of the project operation and put forward reasonable suggestions and opinions. Rights and obligations of Party B:

1. After signing this agreement and receiving the performance bond from Party A, Party B will actively undertake the project for Party A, and do a good job of direct negotiation between Party A and the relevant person in charge of the head office of China Construction Bank, so as to urge Party A to enter into substantive work as soon as possible.

2. Party B shall fully assist Party A to complete the bidding (negotiation) of this project to ensure the success of Party A's bidding for this project.

Three. Party B shall make efforts for Party A in terms of charging standard and budget amount (to ensure that Party A charges according to the first level), so as to maximize Party A's interests ... However, the total investment and standard of the project shall be subject to the signing of a formal contract. The payment standard and time of the project deposit shall be implemented in accordance with the formal contract.

Approved projects to be built.

5. If Party A fails to complete the formal signing of the project within 30 working days as agreed, Party B shall unconditionally return all the 3 million yuan of good faith money to Party A within 5 working days. If it fails to do so, it will be deemed as a breach of contract, and Party B shall bear the corresponding liabilities for breach of contract. Liability for breach of contract:

If either party fails to perform this agreement, the breaching party shall bear the relevant losses (neither party shall bear any responsibility for the results caused by changes in national policies or plans for the preparation of the headquarters and natural force majeure, and Party B shall unconditionally return the deposit to Party A within 5 working days, and the expenses incurred by Party B shall be negotiated separately by both parties).

Others:

1. This agreement shall come into effect as of the date of signature and seal by both parties.

2. This agreement is made in quadruplicate, with Party A and Party B holding two copies respectively, which have the same legal effect.

Three. Matters not covered in this agreement shall be determined by both parties through consultation, and shall be attached to this agreement, with the same legal effect as this agreement.

Signature of Party A: xxx Signature of Party B: xxx

Id number: xxx ID number: xxx

Xxxxxx year x month x day xxxx year x month x day

Signature of witness: xxx

Article 4 of the project intermediary agreement Party A (customer): xxx

Contact address: xxx

Tel: xxx

Party B (intermediary): xxx

Contact address: xxx

Tel: xxx

Party A and Party B, in accordance with the Contract Law of People's Republic of China (PRC) and on the principle of equality, voluntariness and equal compensation, have reached the following agreement through full consultation:

I. Entrusting matters

1. Entrusted by Party A, Party B is responsible for introducing Party A to directly negotiate with the construction unit of this project (hereinafter referred to as the project), providing Party A with important information about this project, and finally facilitating Party A to sign a contract with the construction unit on this project.

2. "Intermediary success" means that Party A and the construction unit sign a written project contract for this project.

Two. Obligations of Party A

1. Party A is responsible for providing true qualification certificates, business licenses and other relevant materials; Responsible for contract negotiation with the construction unit.

2. If the intermediary is successful, Party A will fully perform the construction contract signed with the construction unit. Party A's rights and obligations arising from the performance of the construction contract have nothing to do with Party B. ..

3. If the intermediary is successful, Party A shall pay the intermediary remuneration to Party B as agreed in this contract. If the payment is not made in time, Party B shall bear the penalty of one thousandth of the unpaid amount.

Three. Obligations of Party B

1. Party B must provide information about the project to Party A, and assist Party A to conduct on-the-spot investigation of the project.

2. Party B promises that the above information about this project provided to Party A is true and reliable.

3. In the process of contract negotiation between Party A and the construction unit, Party B, as an intermediary, shall perform the obligations of prudence and honesty.

Four, the calculation method, payment time and payment method of intermediary remuneration.

1. The intermediary remuneration of this project is the contract amount of project contracting construction.

2. Intermediary remuneration shall be paid within days after Party A signs the project contract with the construction unit recommended by Party B..

3. Party A can pay by transfer or cash.

Verb (the abbreviation of verb) undertakes the intermediary expenses.

Agency fee refers to the necessary expenses actually paid by Party B to complete the entrusted matters. When this contract is signed, Party A shall pay Party B RMB10,000.00 Yuan as the cost of Party B's intermediary activities. If the broker facilitates the establishment of the contract, the expenses of the intermediary activities shall be borne by the broker; If the broker fails to facilitate the establishment of the contract, he has the right not to return the brokerage fee.

Confidential matters of intransitive verbs

1. Both parties shall fully keep the business secrets involved in this agreement.

2. Both parties shall not take any action against the other party with the business secrets obtained in the process of intermediation, otherwise they shall have the right to ask the other party to bear the liability for breach of contract.

Seven. Termination of contract

1. After this contract is signed and takes effect, if Party B still fails to complete the intermediary task before xxxx, this contract will be automatically terminated.

2. If the mediation is successful, this contract will be terminated after full performance.

3. When Party A and Party B terminate the contract by agreement or other legal matters occur, the contract is terminated.

Eight. Dispute resolution method

In case of any contract dispute, if negotiation fails, both parties agree to submit it to the arbitration commission of the place where the contract is signed for arbitration.

Nine. any other business

1. Party B shall not delegate the matters entrusted in this contract.

2. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.

Contract signing place:

Party A: (Seal): xxx Party B (Seal): xxx

Legal representative or entrusted agent: legal representative or entrusted agent: xxx.

Xxxx year x month x day

According to the provisions of Articles 424 and 426 of the Intermediary Contract Agreement in Chapter XXIII of the People's Republic of China (PRC) Contract Law, the entrusting party and the intermediary have reached the following terms and conditions through consultation, based on the principles of good faith and mutual benefit, and both parties shall abide by them.

Client: Intermediary: Project Name: Project Location:

Article 1: Confirmation of matters

The entrusting party confirms that the information of the project was obtained through the introduction of an intermediary agency, which is the intermediary agency that the entrusting party signed the construction contract of the project with the mine owner Longli Juchao Mineral Products Co., Ltd.

Article 2: The responsibilities of the entrusting party:

1. People who have full capacity for civil conduct and pay living expenses have the ability to undertake the construction of the project.

2. Be able to sign the intermediation agreement of this project with the middleman and perform the intermediation agreement of this project in good faith.

Article 3: Responsibilities of Intermediaries:

1. Provide accurate engineering information and engineering address to the entrusting party.

2. Party B shall bear all expenses and its own safety responsibilities during the project activities until the entrusting party signs the project construction contract with the mine owner Longli Juchao Mineral Products Co., Ltd. ..

3. During the construction period, the intermediary agencies should actively cooperate with the entrusting party in handling the construction affairs and the coordination between the entrusting party and the mining party during the construction process.

Article 4: The entrusting party and the mine owner Longli County.

Since Juchao Mineral Products Co., Ltd. signed the construction contract of this project, the intermediary activity of the broker has ended, and the agreement of the intermediary contract of this project will take effect after being signed by both parties, and both parties shall not go back on their word for any reason.

1. Projects signed by the entrusting party and the construction party: barite mining, stone excavation and earthwork excavation.

2. Barite per cubic meter shall be used by the entrusting party, and earthwork silicon ore shall be used.

Article 5: Method of Payment

1. The entrusting party shall pay the living expenses to the intermediary in full according to the monthly progress payment.

2. After receiving the progress payment from the constructor, the entrusting party shall pay the accommodation fee to the intermediary within three working days.

3. After the completion of the project, the entrusting party shall pay the accommodation fee in one lump sum within three working days after receiving the settlement payment paid by the owner, and shall not default on the balance for any reason.

Article 6: If the client fails to pay the accommodation fee on time, the broker may bring a lawsuit, arbitration or apply for a payment order to the people's court according to this contract. According to the total amount of projects and projects signed by the entrusting party and the construction party, the room fee earned by the broker plus 5% delay fee. After the payment of this contract is completed, this agreement will naturally become invalid.

Principal: intermediary:

ID card: ID card:

Tel: Tel:

date month year

Article 6 of the Project Intermediary Agreement (Client): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (the intermediary): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The contact address of Party A is: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The contact address of Party B is: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A's telephone number is: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B's telephone number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In order to give full play to the advantages of both parties, according to the Contract Law of People's Republic of China (PRC) and the principles of equality, voluntariness and equal compensation, Party A and Party B have reached the following agreement through full consultation:

I. Entrusting matters

1. Entrusted by Party A, Party B is responsible for directly negotiating with _ _ _ _ _ _ _ _.

2. "Intermediary success" refers to the completion of all entrusted matters listed in this article. Party A has not signed a written project contract with _ _ _ _ _ _ _ _

Two. Obligations of Party B

1. Party B must provide Party A with relevant information on _ _ _ _ _ _ _ _ _, including but not limited to a copy of the company's industrial and commercial business license, existing major assets, etc. Party B has the obligation to assist Party A to conduct on-the-spot investigation on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Party B promises that the above information about _ _ _ _ _ _ _ _ _ _ company provided to Party A is true and reliable. If the information provided by Party B is untrue, Party B has no right to get intermediary remuneration.

3. In the process of contract negotiation between Party A and the company, Party B, as an intermediary, should fulfill the obligations of prudence and honesty. Contributed to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Three. Obligations of Party A

1. Party A is responsible for providing qualification certificates, business licenses and other relevant materials; Responsible for the contract negotiation with _ _ _ _ _ _ _ _ _ _ _ _ _.

2. If the mediation is successful, Party A will fully perform the project contract signed with _ _ _ _ _ _ _ _. Party A's rights and obligations arising from the performance of this contract have nothing to do with Party B. ..

3. If the intermediary is successful, Party A shall pay the intermediary remuneration to Party B as agreed in this contract.

Four, the calculation method, payment time and payment method of intermediary remuneration.

1. The intermediary remuneration for this project is RMB _ _ _ _ _ _.

2. Within _ _ _ _ _ _ working days after the signing of this agreement, Party A shall pay Party B an intermediary remuneration of _ _ _ _ ten thousand yuan within _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Within _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Party A can deposit or transfer the accounts opened by Party A and Party B in the name of Party B in the form of transfer or cash. Both parties agree that Party A is responsible for keeping the legal person seal of the account and Party B is responsible for keeping the financial seal. During the period when Party A keeps the seal, Party A shall not use the seal for any other activities; Before Party B completes the intermediary task, Party B shall not report the loss of the special seal for legal person.

5. After Party A deposits or transfers the above money into the accounts of both parties in the name of Party B, Party B shall issue a receipt to Party A; After completing the intermediary task and actually obtaining the intermediary remuneration, Party B shall issue a valid tax invoice to Party A, and the relevant income tax shall be borne by Party B. ..

Verb (abbreviation of verb) undertakes intermediary remuneration.

Intermediary remuneration refers to the necessary expenses actually paid by Party B to complete the entrusted matters. Regardless of whether Party B completes the entrusted matters contained in this contract, Party B agrees to bear all the expenses of intermediary activities by itself.

Six, the principle of good faith

1. If there exists between Party A and _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. If Party A signs a share transfer contract with _ _ _ _ _ _ _ _ _ _ company in the name of relevant enterprises or local subsidiaries and all reinvestment companies, the intermediary has the right to require Party A to pay the intermediary remuneration according to Article 4 of this contract.

3. The validity period of this contract (entrustment period) is _ _ _ _ _ working days (calculated from the date when Party A transfers the intermediary remuneration to Party B's account). During this period, the broker must actively facilitate the _ _ _ _ _ _ _ _ _ _ _ Company to conduct substantive negotiations with Party A, and assist Party A to reach a substantive transaction contract with _ _ _ _ _ _ _ _ _.

Seven. Conditions for dissolution of this contract

1. Both parties reach an agreement on the termination of the contract;

2. The purpose of the contract cannot be achieved due to force majeure;

3. Before the expiration of the entrustment period, one party clearly indicated or indicated by its own behavior that it would not perform its main obligations;

4. One party delays the performance of its main obligations and fails to perform them within a reasonable period after being urged;

5. One party delays the performance of its obligations or commits other breach of contract, which makes it impossible to achieve the purpose of the contract.

Eight. Termination of contract

1. If Party B still fails to complete the intermediation task within 20 working days from the date when Party A pays Party B RMB10,000.00 Yuan after the signing of this contract, and Party A and _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. If the mediation is successful, this contract will be terminated after full performance.

3. When Party A and Party B terminate the contract by agreement or other legal matters occur, the contract is terminated.

Nine. Dispute resolution method

In case of contract disputes, both parties shall settle them through consultation; If negotiation fails, both parties agree to submit it to the court where the contract is signed for trial.

X. Confidential matters

1. Both parties shall fully keep the business secrets involved in this agreement.

2. Party B shall not use Party A's business secrets obtained in the intermediary process to do anything against Party A, otherwise Party A has the right to refuse to pay Party B the intermediary remuneration.

XI。 any other business

1. Party B shall not delegate the matters entrusted in this contract.

2. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.

Party A: (Seal): Party B (Seal): Party A (Seal): Party B (Seal): Party A (Seal): Party B (Seal)

Legal representative or entrusted agent of Party A: _ _ _ _ _ _ _ _ _ _ Legal representative or entrusted agent of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _