House information: 68_
Decoration style: modern
Decoration method: half package
Residential area: Nanjing Ruijin North Village Residential Area
Decoration progress: decoration preparation
Decoration period: 4 days
20 13 12/06 all for the children.
A few years ago, I came to Nanjing as a stranger and bought a house in Jiangning. Now my children are going to primary school. It is said that the primary school in the community is ok, but the middle school is poor. Looking at colleagues and classmates, parents are rushing to school for their children. In ancient times, Meng Mu moved three times. In order to have a better learning environment for children, they are also going to move to the city to go to school.
20 13 12-06 house buying storm
After determining the strategy of buying a house, I began to choose a house. In order to save worry, you should choose an intermediary. I saw a 62-square-meter old house. The room type and environment were very poor and I was very dissatisfied. The only advantage is that the total price is low and the pressure after buying is small. I hesitate to call the agent again and again to confirm the purchase, but the agent said that the house had been signed and sold in the morning. A few days later, I found that this set was still sold online, and I suspected it was a fake house. Although the intermediary boasted that there was no fake house and promised compensation, it suffered from no evidence and there was no way. Forget it, vote with your feet and go to another house.
By chance, I was pulled by a well-known intermediary company to introduce a house, 68 square meters. I have seen the house, and the apartment is much better. It is estimated that it should be no problem to add 1~2 elderly people to a family of three after the subsequent renovation. Coupled with the lessons of the past, the decision-making is much more decisive. Although it was about 5 ~ 6W higher than the market price at that time, it seems that it is not a loss now, and the house price has risen too fast. Fortunately, my husband and wife are wise and use their strategies correctly. Before the end of 13, it took them half a year to leave their registered residence in their new house.
20 13 12/06 the old house in the storm.
Tell me about the house you bought. The house is very old, it is a modified house, which seems to be a welfare house built by the original housing management. Both the land certificate and the real estate certificate are 98 years old, and it is estimated that they were transformed in 1998. Later, I learned that the actual house was completed and moved in in the 1980 s. According to the owner, the house was mainly distributed to people, and it was built for a long time and was particularly strong. The house is basically not decorated, but it has been painted. Twenty or thirty years have passed, and generally speaking, there is really no big problem with walls and the like. But after all, it is an old house with a brick-concrete structure and even cracks in the floor. It should be a prefabricated floor slab, which is not waterproof and has poor seismic capacity. Fortunately, there have been no major earthquakes around Nanjing since ancient times, so there should be no problem.
Old apartment map:
20 13 12-06 Draw your own floor plan.
I used PPT to draw the floor plan and floor plan, and thought about how to transform and organize it, so as to prepare for the next communication with the decoration company. During this time, I also wandered around the internet, looking for decoration cases and materials, and trying to find a decoration company online.
20 13 12-08, another way to decorate.
I found a decoration company to talk about the plan and understand the quotation. Every company puts in about the same amount of energy. Interview the plan once, and then interview it again after modification. Each company goes to see a construction site. It takes a lot of effort. In order to find a cheap decoration company and a reasonable design scheme for the new home.
After running a lap, I found several problems:
1. Before the contract was signed, the designer's design was limited to the floor plan, and many details were not reflected. I don't have an overall concept of my future house after it is installed.
2. The quotation is also based on the limited design of the designer, and many details cannot be considered. I think this is one of the reasons why supplementary clauses often appear in renovation contract.
3. The quotation methods of different companies are quite different, and some of them are packaged and reported together, which makes people confused about the specific situation and whether there are any omissions.
Each decoration company's plan is different, and the overall price is more difficult. Finally, I adopted another model: independent designer+decoration company. A friend just decorated, found a contractor to decorate, and invited a friend to do the design. He thought it was good and recommended it to me. After asking the price, it was acceptable, so I also decided to ask a designer to do the design well first, and then let the decoration company report the design and compare it.
20 13 12 10 found another way to decorate.
With the design scheme, I quoted prices to three decoration companies, and all the designers who contacted me made serious quotations and looked for a weekend. I communicated with three companies door to door, and finally determined the one with the highest comprehensive score, although the quotation was not the lowest. Sign the contract and agree to start work on 13.