Then the construction period was as long as half a year (three months as promised), and we delayed making a decision for a while, but in general, we delayed the working day for more than a month (not counting holidays) and finally refunded us more than 1000 yuan for lost time. It's annoying to rent a house for two months. When I go to the construction site on weekdays, I occasionally see that no workers are working and the construction period has been dragged on.
After moving in for 3/4 months, the joint between the kitchen sink and the countertop began to leak, and the cabinets were wet. The kitchen is all inclusive (except household appliances). The faucet in the kitchen has been unstable and has been twisted loosely. It's a quality problem. The countertop was a little heavy at first, and it is ok to use now, but no one knows when it will be a big problem. These little problems are annoying, which makes the happiness of life drop sharply!
They promised that the designer would regularly check the construction site and upload the progress so that the owner could see it. In fact, this has not been done. Many stupid decoration problems need to be discovered by yourself. For example, after the socket is installed, many switches are dead. . . Won't this be tested immediately after installation? When the house is finally handed over, I wonder if anyone in the company will accept it. This is to ensure the quality of decoration and should be accepted.
It was a bad experience, but it also had some benefits. The works done in the early stage are quite satisfactory, and the floor tiles and wall tiles are well pasted and very neat.