10 Company Consortium won the bid for Heilongjiang Highway Project-

Zuimei Longjiang 33 1 Frontier Defense Road Phase I (Second Batch) Construction General Contract and PPP Social Capital Bid ZP2

Zuimei Longjiang 33 1 Frontier Highway takes the national highway Dan 'a Highway (g 33 1) as the main passage, starting from Fuyuan in the east and reaching Mohei River 1700km in the west, covering the 20km tourist radiation belt on both sides of the main line. G33 1 Corridor has world-class original ecological tourism resources, such as boundary river, China Arctic, China East Pole and virgin forest. At present, there are 20 scenic spots with 3A level and above that have been developed. It is planned to connect the scattered tourism resources along the route in series by highway to realize a highway service system integrating highway, passage, tourism service, industry drive and landscape, and connect the national highways G33 1 along Heilongjiang and Wusuli.

According to the unified planning of the provincial government and the Request for Instructions on Relevant Matters Concerning the Construction Mode of Zuimei Longjiang 33 1 Frontier Road Project (Heijiaocheng [202 1] 173No.), Zuimei Longjiang 33 1 Frontier Road Project was implemented in two phases according to the planned implementation schedule, and the first phase of the project adopted "general construction contract".

The first phase (second batch) project of Zuimei Longjiang 33 1 Frontier Highway is implemented this time, with a total investment of 4.035 billion yuan, of which the total mileage of highway engineering construction general contracting project is 506.00 kilometers, and the total investment of construction drawing budget is 3.744 billion yuan; * * * Three subprojects of PPP project for transportation facilities are estimated to have a total investment of 283.49 million yuan, and the total investment of PPP adjustment is estimated to be 290.98 million yuan.

This tender is for the first phase (the second batch) of Zuimei Longjiang 33 1 Frontier Road construction general contracting and PPP social capital bidding. * * * is divided into 1 bid, and the tender number is ZP2. The construction content of this project is divided into two parts, A and B, among which:

Party A is the general contracting project of highway engineering construction, including:

(1) The reconstruction and expansion project from Xunkesun house boundary to Heihe River on Danei Highway (G33 1) starts at K3240+380 (Xunkesun house boundary) and ends at K3357+500, with a total length of about 1 13.52. Among them, the 33. 15km main line adopts the first-class highway standard, and the 80.37km main line adopts the second-class highway standard. See the annex to the announcement for details.

(2) Zuimei Longjiang 33 1 Frontier Defense Road major and medium repair project, including 3 major repairs and 3 minor repairs 1, with a total length of 303.72km. For details, please refer to the annex to the announcement.

(3) The connecting line project of Zuimei Longjiang 33 1 Frontier Highway scenic spot includes two connecting line projects, both of which are third-class highways with a total length of 88.76 kilometers. See the annex to the announcement for details.

Part B is the PPP project of travel facilities, including three travel facilities, which are located in Aihui District, Heihe City, Heilongjiang Province and Shuangcheng District, Harbin City.

The first successful candidate

Leader of the consortium: Heilongjiang Jiaotou Yue Feng Investment Co., Ltd.

1 Consortium member: Heilongjiang Yue Feng Engineering Construction Co., Ltd.

The second member of the consortium: Heilongjiang Bada Luqiao Construction Co., Ltd.

The third member of the consortium: Heilongjiang Ding Jie Road and Bridge Engineering Co., Ltd.

The fourth member of the consortium: Heihe Yuefeng Aihui Tourism Co., Ltd.

Member 5 of consortium: Jianlong Road and Bridge Co., Ltd.

Sixth member of the consortium: Heilongjiang Jianlong Road and Bridge Third Engineering Co., Ltd.

The seventh member of the consortium: Heilongjiang Jianlong Road and Bridge Fourth Engineering Co., Ltd.

The 8th member of the consortium: China Railway Fourth Engineering Group Co., Ltd.

The ninth member of the consortium: Harbin Jiao Yan Traffic Engineering Co., Ltd.

The second successful candidate

Leader of the consortium: Xinjiang Communications Construction Group Co., Ltd.

1 consortium member: Zhejiang Zheng Fang Communications Construction Co., Ltd.

The third successful candidate

Leader of consortium: Xingtai Road and Bridge Construction Group Co., Ltd.

Member of the consortium: Ordos Dongfang Luqiao Group Co., Ltd.

Government and Social Capital Cooperation (PPP) Project in expressway Wudalianchi-Nenjiang Section of Beimo

The total length of the route of this project is 92.525km (26.7763km in wudalianchi city, 33.744km in nehe city, 3.2 15km in Joint Logistics Support Force and 28.7892km in Nenjiang City). The main line adopts two-way four-lane expressway standard, with design speed of 100km/h and subgrade width of 26 m. The subgrade earthwork volume is 14355.772 thousand cubic meters, and the pavement engineering volume is 1700. 12.9 thousand square meters. * * * Dazhong Bridge 6584/32 (m/seat) and Small Bridge 106/4 (m/seat); Separation interchange 2025/ 10 (m/seat), approach bridge 952/20 (m/seat), culvert 109, overpass 28. There are 5 interchanges, 2 service areas, 1 management sub-center (jointly built with toll station) and 2 maintenance work areas in this project. Set the Hongmei Interchange Line 5.80km and Jianshan Interchange Line 3.56km

The total investment in the preliminary design review budget of this project is 6.087 billion yuan, and the total investment in the PPP project adjustment review budget is 5.37 billion yuan (the local governments along the line are responsible for the land acquisition and demolition of this project, and the land use and demolition compensation fees determined according to the "double-owner system" agreement are borne by the local governments, which are not included in the scope of PPP cooperation. )

Name of supplier: Jianlong Road and Bridge Co., Ltd.

Heilongjiang agribusiness constructional engineering Luqiao co., ltd

China Railway Construction Bridge Engineering Bureau Group Co., Ltd. (Consortium)

The project was finally won by the second successful candidate:

Jianning West Road River Crossing Project

B 1 Bid Section of Civil Engineering Construction Project

(1) Project Overview Jianning West Road crosses the river from the intersection of Xingpu Road and Jiangbei Avenue in Jiangbei New District. The main line is provided with a bridge across Jiangbei Avenue, with an overground hub on Jiangbei Avenue, which is laid south along the east side of the railway, and along Xingpu Road after crossing Puzhu Road and Jinpu Railway. After crossing Pubin Road, the tunnel passes through the planned Hengjiang Avenue, and an underground interchange is set up on Hengjiang Avenue. After crossing the Yangtze River, the tunnel goes east along Jianning West Road. An underground interchange was set up on Huimin Road, and the project was finally built near the intersection of Ningxi Road and Rehe Road. The total length of the route is about 680 1 m, of which the tunnel section is about 3550 meters (including the open-cut section), the subgrade section is about 336 meters, and the elevated section is about 29 15 meters. The project has three interchanges, namely Jiangbei Avenue Interchange, Hengjiang Avenue Interchange and Huimin Road Interchange, two wind towers and a management center, including relevant ground auxiliary roads. Shield tunnel is used to cross the Yangtze River in this project. The inner diameter of segment lining of shield tunnel is13.3m, and the outer diameter is14.5m. ..

B3 Bid Section of Civil Engineering Construction Project

(1) Project Overview Jianning West Road crosses the river from the intersection of Xingpu Road and Jiangbei Avenue in Jiangbei New District. The main line is provided with a bridge across Jiangbei Avenue, with an overground hub on Jiangbei Avenue, which is laid south along the east side of the railway, and along Xingpu Road after crossing Puzhu Road and Jinpu Railway. After crossing Pubin Road, the tunnel passes through the planned Hengjiang Avenue, and an underground interchange is set up on Hengjiang Avenue. After crossing the Yangtze River, the tunnel goes east along Jianning West Road. An underground interchange was set up on Huimin Road, and the project was finally built near the intersection of Ningxi Road and Rehe Road. The total length of the route is about 680 1 m, of which the tunnel section is about 3550 meters (including the open-cut section), the subgrade section is about 336 meters, and the elevated section is about 29 15 meters. The project has three interchanges, namely Jiangbei Avenue Interchange, Hengjiang Avenue Interchange and Huimin Road Interchange, two wind towers and a management center, including relevant ground auxiliary roads. Shield tunnel is used to cross the Yangtze River in this project. The inner diameter of segment lining of shield tunnel is13.3m, and the outer diameter is14.5m ... The interchange from the project starting point to Hengjiang Avenue is constructed according to the urban expressway standard, with a design speed of 80km/h, and the interchange from Hengjiang Avenue to the project ending point is constructed according to the urban trunk road standard, with a design speed of 60km/h. ..

B 1 bid section

First place: China Railway Fourth Engineering Group Co., Ltd.

Expected bid price 432583639

Second place: China Communications Second Highway Engineering Bureau Co., Ltd.

Expected bid price 432460886

Third place: China Construction Eighth Engineering Bureau Co., Ltd.

The estimated bid price is 4324 1 173 1.

Bid for B3

First place: China Railway Seventh Bureau Group Co., Ltd.

The estimated bid price is 1 193480 19.

Second place: China Communications Second Highway Engineering Bureau Co., Ltd.

The estimated bid price is118163146.

Third place: China Construction Eighth Engineering Bureau Co., Ltd.

The estimated bid price is 1 18 159309.

JL3 bid section

First place: Jiangsu Huaning Engineering Consulting Co., Ltd.

The expected bid is 7742500.

Second place: Nanjing Traffic Construction Management Group Co., Ltd.

Expected bid price 7742502

Third place: Jiangsu Xufang Engineering Consulting Co., Ltd.

Expected bid price 7659600