How to write the decoration material supply contract, please refer to the model.

Family renovation contract Client (Party A): Organizer (Party B): Project: House Decoration After friendly negotiation, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for * * * to abide by. Article 1: Project overview 1. Project address: XXXX2. Room size: XX square meters. 3. Construction content: See Annex (1) List of Home Decoration Construction Contents and Construction Drawings for details. 4. Entrusting method: contracting for work and materials. 5. Commencement date of the project: XX, XX, XX. 6. Project completion date: XX year, XX month, XX day, and total project days: XX days. Article 2: Project Price (amount in words). Article 3: The quality requirement is 1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties. See Annex (III) List of Final Accounts of Home Decoration Engineering Materials for details. 2. With regard to the acceptance criteria of this project, both parties agree to refer to the Acceptance Criteria for Residential Decoration (DB3 1/T30- 1999). 3. In the process of construction, if Party A has special construction projects or special quality requirements, both parties shall sign a supplementary contract for the increased cost. 4. Party A shall be responsible for the quality of all materials and equipment purchased by it; Party B shall be responsible for the quality of the project. 5. If Party A hires a project supervisor, it shall notify Party B before the project starts, so as to facilitate the work connection. Article 4: Material supply: 1. Party B shall clearly price the materials used in this contract in strict accordance with the relevant national price regulations. For details, please refer to Annex (II) Budget Table of Home Decoration Engineering Materials. The materials provided by Party A shall be used in the decoration project specified in this contract, and shall not be used for other purposes without Party A's consent ... If Party B uses them for other purposes, Party B shall compensate Party A at double the price of the misappropriated materials. 2. If the materials and equipment provided by Party B do not meet the quality requirements or have different specifications, they shall be prohibited from being used. If it has been used, all losses caused to the project shall be borne by Party B. 3. For the materials and equipment that Party A is responsible for purchasing and supplying, please refer to Appendix (IV) of this contract for the list of decorative materials provided by Party A. The decorative materials shall be qualified products that meet the design requirements and be supplied to the site on time. Delayed arrival, postponed construction period and delayed punishment. Pay Party B 10% of the total materials provided by Party A as the management fee. After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for compensating the losses caused by improper keeping. Article 5: The payment method is 1. After the contract is signed, Party A shall pay% of the engineering material cost and% of the engineering cost; When the progress of the construction period is over half, Party A will pay% of the second project cost. After the project is completed and accepted, Party A shall be responsible for the settlement of the remaining%. Please refer to Annex (8) Home Decoration Project Quality Warranty Card for details of handing over and issuing the decoration project warranty card to Party A.. Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use. 2. If there are any additions, deletions or changes in the project construction, please refer to Annex V of this contract, Change Form of Home Decoration Project. Both parties sign a supplementary contract, and Party B is responsible for issuing a construction change order and notifying the person in charge of the construction site. Increase or decrease the project price and settle on the spot. 3. If Party A fails to prepay the project price within the time limit stipulated in this contract, Party A shall pay 1% of the unpaid project price to Party B for each day overdue. Article 6: Matters not covered in this contract shall be settled by both parties through consultation. Article 7: This contract is made in duplicate, with each party holding one copy. Article 8: This contract shall come into force as of the date of signature. Party a: XXX party b: XXX legal representative: XXX signing date: XX, XX, XX, xx.