In order to standardize the duty room at the entrance of tunnel construction, promote tunnel management to achieve the purpose of "prevention first, comprehensive treatment" and ensure construction safety, this management regulation is formulated in line with the principle of "safety first, prevention first, comprehensive treatment". 1. Each work area shall set up a hole duty management team, with the duty dispatcher as the team leader and other relevant personnel (construction team leader, technical quality inspection safety management personnel, hole duty personnel, etc.) participating. ) as a team member. The management team is responsible for the daily management of the duty room at the entrance to the cave, and carries out daily inspection and supervision on the implementation of the registration system for personnel entering and leaving the cave. 2. The mouth of the cave duty room, set up two full-time staff on duty. The personnel on duty are responsible for the registration of personnel entering and leaving the tunnel, and timely grasp the personnel information in the tunnel; Responsible for reporting the current construction progress of each working face in the tunnel; Responsible for the safety inspection of tunnel personnel, whether to carry explosives, detonators, etc. Be responsible for guarding the tunnel entrance, especially prohibiting people and vehicles from entering the tunnel when blasting operations are carried out in the tunnel; Responsible for the inspection of materials entering the tunnel, especially explosives and detonators, which can only be transported into the tunnel with the company of blasters and safety officers. 3. All personnel entering the tunnel must wear safety protection articles, and the personnel on duty at the entrance of the tunnel have the obligation to inform them of their safety. Those who do not wear safety protection articles have the right to prohibit them from entering the tunnel. No one is allowed to enter the cave after drinking. 4. The superior leaders contact the leaders of the project department to check and the outsiders, wear protective equipment in accordance with the regulations, and be led into the hole by the leaders on duty at the scene. 5. The personnel entering the hole shall implement the system of listing in the hole and delisting from the hole. 6. Non-construction personnel such as the project department, the supervisor, the owner and the superior leaders shall register in the access register when checking the access hole, and shall indicate the reason and time of access hole. 7. Gasoline vehicles, motorcycles and bicycles are prohibited from entering the tunnel. 8. Prohibit people who have nothing to do with the construction from entering the tunnel. 9. The personnel and vehicles entering the tunnel should obey the command of the on-site management personnel, the personnel must walk aside, the vehicles must drive at a speed limit, and pay attention to the on-site safety warning signs to ensure safety. 10. People who enter caves are not allowed to stay in lots and parts with danger signs. In case of danger or alarm signal in the tunnel, you must obey the command of relevant personnel and evacuate the dangerous area in an orderly manner. 1 1. The personnel on duty at the entrance of the cave must wear armbands when on duty; Safety management personnel shall supervise and check whether the registration of people entering and leaving the cave is true. 12. Anyone who fails to strictly implement the entry and exit registration system will be fined 100 yuan each time. The mouth of the cave adheres to the 24-hour duty system. If the personnel on duty at the entrance of the cave are found to be absent without leave, absent without leave or the registration management on duty is not in place, they will be fined 100 yuan each time. 13. In order to show the good mental outlook and quality cultivation of the construction personnel in our department, the tunnel entrance staff are required to be civilized and polite, especially when checking the work in the superior unit, more attention should be paid to the way of speaking, clothing and appearance, words and deeds. 14. The project department and superior leaders found that the registration management system of tunnel entrances and exits was not strictly implemented, and the relevant personnel would be severely punished. Please strictly implement the work area. The detailed information of "Regulations on Safety Management of Tunnel Construction Entrance" can be found in the link of Zhong Da Consulting and Design, and all relevant building construction information you want is available.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd