Commitment Letter of Construction Project Management 1 Our company solemnly promises that the road and system supporting project of Dongba Street (Phase I) in Karamay Petrochemical Industrial Park, which is supervised by our company, will strictly abide by laws, regulations and mandatory standards in the process of construction quality activities. If our company violates the relevant laws, regulations, mandatory standards and the spirit of relevant documents in the process of construction quality activities, our company will unconditionally bear legal responsibility.
Xinjiang Tianqi engineering project management consulting co., ltd
Chief Supervision Engineer (signature):
Xx,xx,XX,XX
2 Xiamen Municipal Planning Commission construction project management commitment:
My unit is entrusted to undertake the engineering design of the bell tower project. Now the project formally applies for planning approval procedures.
My unit is aware of the contents of Articles 47 and 63 of the Measures for the Implementation of Fujian Province. In order to fulfill the obligation of good faith, our unit promises that the approved scheme design will be based on national, provincial and municipal technical standards and norms, and carry out sunshine analysis, and calculate the planning technical and economic indicators such as land area, building area, building height, floor area ratio, building density, green space rate and parking berth, and be responsible for the authenticity and accuracy of the analysis results and indicators.
In case of violation of the above commitments, our unit will voluntarily bear corresponding legal responsibilities.
Design unit: (official seal of the unit)
Legal representative (or authorized client) (signature)
Xx,xx,XX,XX
Commitment letter for construction project management 3 1. "Two Districts and Five Roads" Resettlement Housing Project in Old City Reconstruction. The planned investment is 425 million yuan; Image progress: in the first phase (g-a 13 plot), 2 buildings completed the capping of the main structure, 4 buildings completed the main structure of 15 floors or above, and 6 buildings completed the basement structure; The second phase (g-a 12 plot) of pile foundation engineering was fully completed, and the earthwork excavation was completed by 20%; It's done.
2. The old city reconstruction and resettlement housing project of shanty towns in plot B ... plans to invest 65 million yuan; Image progress: complete the pile foundation project; Static load dynamic measurement; Foundation pit support and excavation; Basement project;
Third, make a commitment
The construction of resettlement housing project is the key to expropriation and resettlement, which is related to the vital interests of relocated households and social stability. In order to speed up the resettlement progress, realize the gradual change of expropriation and resettlement from "waiting room" to "waiting room", intensify the work, speed up the progress, clarify the tasks and responsibilities, vigorously promote the construction of "two districts and five roads" and the shantytown renovation and resettlement project of plot B, and complete the annual investment of 490 million yuan.
1. Ensure the safety and quality of the project. Adhere to the policy of "safety first, prevention first", fully implement the responsibility system for production safety, and build safety projects. Strengthen the supervision and management of project quality, strictly supervise the construction unit to carry out construction according to the engineering design requirements and engineering construction standards and procedures, and strive for high-quality projects.
2. Accelerate the progress of the project. The construction conditions of affordable housing projects are poor and the construction is difficult. Under the condition of ensuring the safety and quality of the project, increase the investment in capital and machinery and equipment, speed up the progress of the project, build resettlement houses as soon as possible, and let the relocated households move into their new homes as soon as possible.
3. Implement the sunshine project. Strictly abide by the relevant laws and regulations of engineering construction, operate in accordance with the relevant provisions of engineering construction project bidding, strictly regulate the management and use of construction funds, and strive to build a clean project and a sunny project.
20xx March 25th
Commitment letter of construction project management 4 Our company solemnly promises that the supporting road and system project of Dongba Street (Phase I) of Karamay Petrochemical Industrial Park supervised by our company will strictly abide by laws, regulations and mandatory standards during the construction quality activities of this project. If our unit violates the relevant laws, regulations, mandatory standards and the spirit of relevant documents in the process of construction quality activities, our unit will unconditionally bear legal responsibility.
Xinjiang Tianqi engineering project management consulting co., ltd
Chief Supervision Engineer (signature):
Date, year and month
Commitment letter of construction project management. The following responsible persons shall bear the responsibility for production safety according to their respective responsibilities:
The legal representative of the construction unit, the legal representative of the construction unit and the legal representative of the supervision unit are the first responsible persons for the civilized construction of production safety;
The builder of the construction unit is the person directly responsible for the civilized construction of project safety production;
The project director of the supervision unit undertakes the supervision responsibility of the civilized construction of project safety production.
Second, strictly abide by the "Construction Law", "Safety Production Law", "Regulations on Safety Production Management of Construction Projects", "Regulations on Safety Production License" and other laws and regulations.
Third, improve the safety management system.
Implement various safety management measures, strive for no fatal accidents, serious injuries, poisoning accidents, fire accidents and collapse accidents, and the qualified rate of safe production and civilized construction reaches 100%.
Four, in strict accordance with the following requirements to standardize the civilized construction behavior of production safety:
1. The construction contract stipulates the total cost of safety protection and civilized construction measures, as well as prepaid expenses, payment plan, use requirements, adjustment methods, etc. Timely review and sign the expenses incurred by the safety protection and civilized construction measures implemented by the construction unit.
2. Make clear the management objectives of safe production and civilized construction in the construction and supervision contracts, and explicitly encourage striving for provincial and municipal demonstration sites for safe production and civilized construction of housing projects. Won the provincial and municipal housing project safety production civilized construction demonstration project clear reward, safety production civilized construction unqualified shall be punished.
3. Implement the traffic safety responsibility system in strict accordance with the Document Notice of Zhuhai Public Security Bureau on Joint Meeting System and Traffic Safety Responsibility System (Zhu Gong Fa [20xx] No.300), and the construction unit and the project management department sign the responsibility book of target management to prevent traffic accidents, educate and urge the construction personnel to strictly implement the Road Traffic Safety Law of the People's Republic of China.
4, the implementation of national, provincial and municipal regulations and policies on flood control and wind prevention, organize the formulation and improvement of flood control and wind prevention plans. In case of possible tropical cyclone or heavy rain and flood, the person responsible for flood control and wind prevention should personally go to the front line to check and implement various defensive measures; In flood season construction, vehicles, routes and resettlement sites for personnel transfer must be implemented; In case of an engineering accident, organize personnel to fully rescue, report to the superior in time, and do a good job in the safe transfer of people in distress to avoid casualties and minimize disaster losses.
5. The safety management data of this project adopts the unified table of building safety management data of Guangdong Province.
6. Implement the "safety card" management system, strengthen the safety education and training of front-line construction workers, and establish information records such as personal basic information of front-line workers and safety training.
7. Insure accident insurance according to regulations.
V. Implement safety measures according to the following standards:
1, strictly abide by the Safety Inspection Standard for Building Construction (JGJ59-20xx) and related specifications.
2. The goal of safe production is clear, the system is perfect, the information is complete, the responsibility for safety lies with people, and the safety measures are implemented.
3. Set up the site safety sign layout general plan, and hang the safety sign according to the general plan.
4, pays special attention to the safety level 3 education and daily safety accident prevention education, special operations personnel do show certificates.
5. Standardize the construction electricity consumption, adopt TN-S system to achieve "one machine, one brake and one leakage box", use standard electrical boxes, and use qualified products such as wires, switches and leakage protectors.
6. Set up external scaffolding according to the specifications, use the safety net that has passed the inspection, do a good job in the protection of "four mouths and five faces", and clarify the person in charge of protection on each floor.
7, the use of qualified mechanical equipment, material hoist (tic-tac-toe, gantry), construction external elevator, tower crane, pile machine installation and disassembly scheme, acceptance and testing procedures are complete. No windlass with no protective cover, expired and no safety device shall be used, and an independent unloading platform shall be set up as required.
8, improve the fire prevention system, the implementation of fire prevention measures, equipped with enough fire prevention equipment, do not use electric stove, gas stove, etc. In the dormitory, not living or working in the building under construction.
9, according to the provisions of the preparation of special special operation safety organization design or scheme, organize experts to demonstrate.
Six, according to the following standards to implement civilized construction measures:
1, do a good job in civilized construction according to the Safety Inspection Standard for Building Construction (JGJ59-20xx) and the civilized construction inspection scoring standard of the Provincial Housing and Construction Department.
2, the construction site closed management, walls, doors, solid and beautiful, write the name of the enterprise and project on the lintel.
3. The construction site layout is reasonable and standardized, with seven signs and one map, complete signs and neat and beautiful hanging.
4. Main roads, entrances and exits, material yards, dormitories, offices, warehouses, kitchens, toilets, etc. The construction site should be hardened; The construction site is clean, tidy and well drained; Materials should be classified and stacked, neat and orderly, and marked with specifications.
5. The dormitory adopts brick wall and iron roof or other safe and practical metal structure trailer, without asbestos tile and bark.
6, set up a car wash tank at the entrance to the construction site, wash away the vehicles leaving the construction site, to prevent environmental pollution.
7, diet and water meet the hygiene standards, meals are cooked separately, the kitchen is equipped with screen doors and screens, kitchen hygiene license and chef's health certificate.
8, adhere to the civilized construction, do a good job in the community around the construction site, do not cause complaints or disputes of the surrounding residents.
Seven, in violation of the provisions of this letter of commitment, safety civilized construction inspection unqualified or safety hazards, production safety accidents, voluntarily accept the following penalties:
1, accepted the order of the municipal (district) construction engineering safety supervision station to suspend the construction rectification.
2, accept the city (District) construction engineering safety supervision station to the construction, supervision enterprises and related responsible personnel dynamic points and other penalties.
3. Accept the administrative penalties made by the Municipal (District) Housing and Construction Bureau in accordance with the law, such as stopping undertaking tasks, temporarily withholding the safety production license, suspending the qualification of the construction engineer (project manager) and the person in charge of the project, and imposing fines on the responsible party and person.
Eight, this letter of commitment in quintuplicate, the city (District) Housing and Construction Bureau, the city (District) construction engineering safety supervision station, construction, construction and supervision units each keep one copy.
Nine. This letter of commitment shall come into effect as of the date of signature and seal by all parties.
Attachment:
1, payment plan for safety protection and civilized construction measures
2. Safe production conditions before construction.
Construction unit (official seal):
Legal representative (signature):
Date, year and month
Construction unit (official seal):
Legal representative (signature):
Architect (signature):
Date, year and month
Supervision unit (official seal)
Legal representative (signature):
Project leader (signature):
Date, year and month
Letter of Commitment to (Tenderee) Construction Project Management 6:
As a bidder participating in (project name) project, according to the relevant documents of the state, autonomous region and Nanning, we hereby promise to the tenderee:
1. Once winning the bid, we guarantee that the migrant workers' wage security fund will be fully transferred to the special account for migrant workers' wage security fund set up by the municipal finance department within 7 working days from the date of issuing the bid-winning notice in accordance with the provisions of N.F.F. [20xx] No.51. Once the contracted projects are in arrears with the wages of migrant workers and workers, the financial department will first allocate them from our migrant workers' wage security fund. If the migrant workers' wage security fund is not paid in full and on time after winning the bid, the qualification for winning the bid will be cancelled.
2. Once winning the bid, we guarantee to strictly implement the relevant provisions of the Management Rules for Safety Protection and Civilized Construction Measures of Guangxi Zhuang Autonomous Region (Gui Jianshi [20xx] No.22) in the construction process to ensure that all safety protection and civilized construction measures of the construction project are put in place. If we fail to implement the provisions of Annex I of Gui Jianzhi [20xx] No.22 in the project contracting, we are willing to accept the punishment of the construction unit and relevant competent departments in accordance with relevant regulations.
3. Once winning the bid, we guarantee to strictly implement the relevant provisions of Nanning Municipal People's Government's Decree No.32 "Decision on Amending the Management Regulations on Bulk Cement and Ready-mixed Concrete in Nanning" in the construction process, so as to ensure the use of bulk cement and ready-mixed concrete in the construction project as required. If we fail to comply with Decree No.32 of Nanning Municipal People's Government in project contracting, we are willing to accept the punishment of the construction unit and relevant competent departments in accordance with relevant regulations.
Bidder: (Seal)
Legal representative or authorized agent: (signature or seal)
Date: Year Month Day
Commitment letter of construction project management. Completed in 20xx years
In 20xx, under the correct leadership of the Municipal Party Committee and the Municipal Government, closely centering on the central work of the Municipal Party Committee and the Municipal Government, with scientific and innovative working ideas and proactive work enthusiasm, we overcame difficulties, paid close attention to implementation, and made every effort to promote the construction of key projects, with an investment of 54 1 10,000 yuan and an annual plan of 100.2%.
1. "Two Districts and Five Roads" Resettlement Housing Project for Old City Reconstruction. Completed an investment of 372 million yuan; The pile foundation of the first phase (g-a 13 plot) is completed, and the third floor of 17# building is completed. Piling started in the second phase (plot g-a 12).
2. The old city reconstruction and resettlement housing project of shanty towns in plot B .. completed an investment of 65,438+69 million yuan; Complete 25% of engineering piles and 85% of retaining piles.
Person in charge (signature) of commitment letter 8 for construction project management: project name: commitment to be responsible for the quality, progress and safety production of this project; Responsible for arranging and solving all the capital turnover and manual and mechanical resettlement matters involved in this project.
Ensure the construction quality of this project, ensure the construction progress, and avoid major production safety accidents and social stability.
(This undertaking is made in duplicate, one for the office and one for the engineering department. )
Date: