Brief introduction of Bao Yun Yellow River Bridge?

Bao Yun Yellow River Bridge (Yuncheng-Lingbao expressway Bao Yun Yellow River Bridge) starts 0.7 km north of Zaoshu Lane in Monan Town and ends at the auxiliary bridge of Bao Yun Yellow River Bridge.

Yuncheng-Lingbao expressway is an important part of expressway network planning "three verticals, twelve horizontals and twelve rings" in the west of Shanxi Province, and also an important part of the north-south longitudinal line from Hohhot to Beihai in the national expressway planning network.

Bao Yun Yellow River Bridge is one of the key projects in Shaanxi Province in 20 14. The bridge connects the Jiemo section of expressway, Bao Yun in the north, crosses the Yellow River from Liuwan Village, Monan Town, Ruicheng County, enters Henan, and connects Sanmenxia to Lu Ling section of Xichuan expressway. After the project is completed, it will open the "dead end road" of the exit highway passages in southwest Shanxi and northwest Henan, greatly alleviating the pressure of transit traffic, and will become an important hub connecting the expressway network of Shanxi and Henan provinces and an important link to communicate all-round exchanges between the two provinces. It will break the natural barrier from Shanxi to western Henan and western Hubei, and is of great significance to further optimize the structure of expressway network in Shanxi Province, strengthen economic and cultural exchanges between Shanxi and the Central Plains, close regional cooperation in the Golden Triangle of the Yellow River, and promote the development of modern logistics industry in Yuncheng.

The bridge is a super-large cable-stayed bridge across the Yellow River in expressway, and it is built according to the six-lane expressway standard. The total length of the bridge is 1690 meters, the design speed is 80 kilometers per hour, the bridge width is 32 meters, and the design load is highway -I level. 2014165438+129 October, the foundation stone was laid for the bridge across the Yellow River between Yuncheng and expressway, Monon Town, Ruicheng County. The construction period is 30 months, and the estimated investment of the project is 965 million yuan.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.