In the qualification examination, we should strictly examine the construction experience, technical level, construction organization and management ability and social reputation, as well as the professional quality and ability in the construction of construction technology, new technology and new technology.
Extended data:
Before the waterproof material enters the site, the supervision engineer should carefully check the factory certificate, quality guarantee and characteristics. , the technical indicators should meet the requirements; Ensure that the products must have the use certificate of the relevant state departments, and the certification materials are complete.
In the acceptance of the main structure, more attention should be paid to the inspection and inspection of the reserved holes in the roof panel, parapet and roof to avoid the phenomenon of inadequate inspection and management.
The supervision engineer should strengthen the control, issue a rectification notice to the supervision engineer for the content that does not meet the requirements of quality standards, and supervise the construction unit to hand over the division project.